Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: HIGGINS SUPPLY COMPANY, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of HIGGINS SUPPLY COMPANY, INC. in 18-25 SOUTH STREET, MC GRAW, NY 13101 (NAICS 339113). OSHA activity number 339882565.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Higgins Supply Company, INC. — free Get an email when a new federal OSHA severe-injury report for Higgins Supply Company, INC. is published. One employer, no account, unsubscribe in one click.
Site address
18-25 SOUTH STREET
City
MC GRAW
State
NY
ZIP
13101
Mailing
18-25 SOUTH STREET, MC GRAW, NY 13101
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
339113
Employees
43
Ownership type
A

13 citations on file for this inspection.

5(a)(1)

Serious Gravity 1 5 instances 2 exposed
Issued
Sep 11, 2014
Abate by
Oct 16, 2014
Penalty
Initial $1,785 · Current $1,250 Reduced
OSH ACT of 1970 Section (5)(a)(1): Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being struck by the load should the overhead hoist or bridge crane system fail:  a)  Plant 1, Press Alley, on or about 8/5/14:  A 500 lb. P & H hoist was not provided with a safety latch on the lifting hook and the beam it was attached to had no rated load markings.  b)  Plant 1, Press Alley, on or about 8/5/14:  A beam with a one ton chain hoist attached had no rated load markings.  c)  Plant 2, White Bone Dept., on or about 8/5/14:   Two beams each with a 1/2 ton electric hoist attached had no rated load markings.  Among other methods, several feasible and acceptable abatement methods to correct these hazards are to:  1.  Install new safety latches on the lifting hooks in accordance with ANSI B30.16 Section 16-1.2.9.  2.  Mark the appropriate rated load markings on the beams.  Abatement certification must be submitted for these items.
Recent events (2)
  • — I (S) $1249.5
  • — Z (S) $1785

1910.107 L04 I

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 11, 2014
Abate by
Oct 16, 2014
Penalty
Initial $2,380 · Current $1,666 Reduced
29 CFR 1910.107(l)(4)(i): All areas were not kept free of the accumulation of powder coating dust:  a)  Plant 2, White Bone Dept., on or about 8/5/14:  There was an accumulation of Sherwin Williams Powdura powder coating on the walls, floors and horizontal surfaces in and around the automated white bone machine.  Abatement certification must be submitted for this item.
Recent events (2)
  • — I (S) $1666
  • — Z (S) $2380

1910.147 C04 I

Serious Gravity 1 1 instance 5 exposed
Issued
Sep 11, 2014
Abate by
Oct 16, 2014
Penalty
Initial $1,785 · Current $1,250 Reduced
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:  a)  At the establishment, on or about 8/5/14:  Where employees perform servicing and/or maintenance on various machinery or equipment, including, but not limited to mechanical power presses, coating machines, coiling machines, etc., the employer had not established specific energy control procedures to prevent the unexpected energizing, start up or release of stored energy of the equipment.  Abatement certification must be submitted for this item.
Recent events (2)
  • — I (S) $1249.5
  • — Z (S) $1785

1910.157 G02

Serious Gravity 1 35 instances 35 exposed
Issued
Sep 11, 2014
Abate by
Oct 16, 2014
Penalty
Initial $1,785 · Current $1,250 Reduced
29 CFR 1910.157(g)(2): The educational program to familiarize employees with the general principles of fire extinguisher use and the hazards involved with incipient stage fire fighting was not provided to all employees upon initial employment, and at least annually thereafter:  a)  At the establishment, on or about 8/5/14:  Training was not provided to employees on the use of fire extinguishers and the hazards involved with incipient stage fire fighting.  *ABATEMENT NOTE:  By this date the employer must either correct the alleged violation or implement a Fire Safety Policy; as outlined in 29 CFR 1910.38 and 29 CFR 1910.39 which includes the evacuation requirements of 29 CFR 1910.157(b).  Abatement certification must be submitted for this item.
Recent events (2)
  • — I (S) $1249.5
  • — Z (S) $1785

1910.212 A01

Serious Gravity 5 7 instances 4 exposed
Issued
Sep 11, 2014
Abate by
Oct 16, 2014
Penalty
Initial $2,380 · Current $1,666 Reduced
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks:  a)  Plant 1, Spiral Dept., on or about 8/5/14:  Ingoing nip points and moving machine parts on the Automatic Coating machine were not guarded in that the machine was operated with the door open.  b)  Plant 1, Coiling Dept., on or about 8/5/14:  Ingoing nip points and point of operation at the feed wheels and crushing wheel press areas on three coiling machines 1, 2, and 3, were not guarded.  c)  Plant 1, Tipping Dept., on or about 8/5/14:  Rotating nut projections on the crushing wheels, including, but not limited to, T16 and T17 were not guarded.  d)  Plant 1, Basement, Maintenance Shop, on or about 8/5/14:  Rotating chuck on a Delta drill press was not guarded.  Abatement certification must be submitted for these items.
Recent events (2)
  • — I (S) $1666
  • — Z (S) $2380

1910.217 C02 I A

Serious Gravity 5 3 instances 3 exposed
Issued
Sep 11, 2014
Abate by
Oct 16, 2014
Penalty
Initial $2,975 · Current $2,083 Reduced
29 CFR 1910.217(c)(2)(i)(a): Point of operation guard(s) on mechanical power press(es) did not prevent entry of hands or fingers into the point of operation by reaching through, over, under or around the guard(s):  a)  Plant 1, Press Alley, on or about 8/5/14:  Point of operation was not adequately guarded on a Rouselle part revolution mechanical power press #P35 in that you could reach around, through and under the guarding.  b)  Plant 1, Press Alley, on or about 8/5/14:  Point of operation was not guarded on a Rouselle part revolution press #P7 in that you could reach through the guarding.  c)  Plant 1, Press Alley, on or about 8/5/14:  Point of operation was not adequately guarded on the sides of a Pressrite part revolution press #P17 in that you could reach through guarding.  Abatement certification must be submitted for these items.
Recent events (2)
  • — I (S) $2082.5
  • — Z (S) $2975

1910.217 E01 I

Serious Gravity 1 16 instances 10 exposed
Issued
Sep 11, 2014
Abate by
Oct 16, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.217(e)(1)(i): A program of periodic and regular inspections of mechanical power press(es) was not established and followed to ensure that all parts, auxiliary equipment and safeguards were in a safe operating condition and adjustment:  a)  Plant 1, on or about 8/5/14:  There were no periodic or regular inspections conducted nor certified records maintained of those inspections on 16 mechanical power presses.  Abatement certification must be submitted for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.217 E01 II

Serious Gravity 1 16 instances 10 exposed
Issued
Sep 11, 2014
Abate by
Oct 16, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.217(e)(1)(ii): Mechanical power press(es) were not inspected and tested at least weekly to determine the condition of the clutch /brake mechanism, antirepeat feature and single stroke mechanism:  a)  Plant 1, on or about 8/5/14:  There were no weekly inspections conducted nor records maintained of those inspections on 16 mechanical power presses.  Abatement certification must be submitted for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.219 C02 I

Serious Gravity 5 3 instances 2 exposed
Issued
Sep 11, 2014
Abate by
Oct 16, 2014
Penalty
Initial $2,380 · Current $1,666 Reduced
29 CFR 1910.219(c)(2)(i): All exposed part(s) of horizontal shafting seven (7) feet or less from floor or working platform were not protected by stationary casing(s) enclosing shafting completely or by trough(s) enclosing sides and top or sides and bottom of shafting:  a)  Plant 1, Coiling Dept., on or about 8/5/14:  Horizontal shafting on coiling machines #1, 2, and 3 were not guarded.  Abatement certification must be submitted for this item.
Recent events (2)
  • — I (S) $1666
  • — Z (S) $2380

1910.219 D01

Serious Gravity 5 2 instances 1 exposed
Issued
Sep 11, 2014
Abate by
Oct 16, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o):  a)  Plant 1,  Coiling Dept., on or about 8/5/14:  Pulleys driving the wire pullers in two areas on the Coiling machine #2 were not adequately guarded.  Abatement certification must be submitted for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.219 E03 I

Serious Gravity 5 2 instances 1 exposed
Issued
Sep 11, 2014
Abate by
Oct 16, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.219(e)(3)(i): Vertical or inclined belt(s) were not enclosed by guard(s) conforming to the requirements specified at 29 CFR 1910.219(m) and (o):  a)  Plant 1, Coiling Dept., on or about 8/5/14:  V belt driving the wire pullers in two areas on the Coiling machine #2 were not adequately guarded.  Abatement certification must be submitted for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.303 B02

Serious Gravity 1 1 instance 1 exposed
Issued
Sep 11, 2014
Abate by
Sep 23, 2014
Penalty
Initial $1,785 · Current $1,250 Reduced
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling:  a)  Plant 1, Coiling Dept., on or about 8/5/14:  A flexible cord was attached to a duplex receptacle outlet and being used as an extension cord to power a floor fan was not used in accordance with the listing or labeling.  Abatement certification must be submitted for this item.
Recent events (2)
  • — I (S) $1249.5
  • — Z (S) $1785

1910.304 G05

Serious Gravity 1 3 instances 3 exposed
Issued
Sep 11, 2014
Abate by
Sep 23, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective:  a)  Plant 1, Press Alley, on or about 8/5/14:  An Aloha fan was not grounded in that the ground pin was missing from the plug end.  b)  Plant 1, Coiling Dept., on or about 8/5/14:  An Air King fan and a large black fan were not grounded in that the extension cords providing current to the fans had ground pins missing from their plug ends.   Abatement certification must be submitted for these items.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Higgins Supply Company, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339882565.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.