Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,198,892Inspections Most recent open 2026-09-03 Last loaded 2026-09-07

OSHA Inspection: SCOTT FICK PLUMBING HEATING AND COOLING INC.

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of SCOTT FICK PLUMBING HEATING AND COOLING INC. in 702 NORTH 8TH STREET, READING, PA 19601 (NAICS 238220). OSHA activity number 339892663.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Scott Fick Plumbing Heating and Cooling INC. for free Get an email when a new federal OSHA severe-injury report for Scott Fick Plumbing Heating and Cooling INC. is published. One employer, no account, unsubscribe in one click.
Site address
702 NORTH 8TH STREET
City
READING
State
PA
ZIP
19601
Mailing
211 DENNIS DRIVE, READING, PA 19606
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238220
Employees
6
Ownership type
Private (A)

2 citations on file for this inspection.

1926.405 G01 III B

Serious Gravity 5 1 instance 6 exposed
Issued
Feb 4, 2015
Abate by
Mar 3, 2015
Penalty
Initial $2,000 · Current $1,500 Reduced
29 CFR 1926.405(g)(1)(iii)(B): Flexible cords and cables were run through holes in walls, ceilings, or floors:  a)  At 702 North 8th Street, Reading, PA - On or about August 7, 2014, employees were exposed to fire and electrical shock hazards when heat welding plastic tubing using a McElroy Socket Heater powered with a flexible cord run through a hole in the floor because there were no power sources on the floor where they were working.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $1500
  • · Z (S) $2000

1926.405 G02 IV

Serious Gravity 1 1 instance 6 exposed
Issued
Feb 4, 2015
Penalty
Initial $1,020 · Current $765 Reduced
29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws:   a)  At 702 North 8th Street, Reading, PA - On or about August 7, 2014, employees were exposed to fire and electrical shock hazards when heat welding plastic tubing with the McElroy Socket Heater powered with a flexible extension cord that had the outer insulation pulled at the outlet end so that there was no longer outer insulation or strain relief provided to prevent tension from being directly transmitted to joints or terminal screws.   No abatement certification or documentation required.
Recent events (2)
  • · I (S) $765
  • · Z (S) $1020

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339892663.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.