OSHA Inspection: WASTE MANAGEMENT OF NORTH DAKOTA, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of WASTE MANAGEMENT OF NORTH DAKOTA, INC. in ALEXANDER TERMINAL PROJECT STATOIL TERMINAL, ALEXANDER, ND 58831 (NAICS 237990). OSHA activity number 339893091.

Watch Waste Management OF North Dakota, INC. — free Get an email when a new federal OSHA severe-injury report for Waste Management OF North Dakota, INC. is published. One employer, no account, unsubscribe in one click.
Site address
ALEXANDER TERMINAL PROJECT STATOIL TERMINAL
City
ALEXANDER
State
ND
ZIP
58831
Mailing
P.O. BOX 4440, WILLISTON, ND 58802
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237990
Employees
120
Ownership type
A

3 citations on file for this inspection.

1926.651 C02

Serious Gravity 5 1 instance 3 exposed
Issued
Jan 16, 2015
Abate by
May 7, 2015
Penalty
Initial $4,500 · Current $3,150 Reduced
29 CFR 1926.651(c)(2): The employer failed to provide a stairway, ladder, ramp or other safe means of egress in trenches or excavations that were 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees:     (a) On or about July 25, 2014, for the three employees that were exposed to cave-in hazards while connecting pipes in a nine-foot deep trench at the Alexander Terminal Project Statoil Terminal near Alexander, ND.
Recent events (3)
  • — F (S) $3150
  • — C (S) $4500
  • — Z (S) $4500

1926.652 A01

Serious Gravity 10 1 instance 3 exposed
Issued
Jan 16, 2015
Abate by
May 7, 2015
Penalty
Initial $6,300 · Current $0 Reduced
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652(c):      (a) On or about July 25, 2014, for the three employees that were exposed to cave-in hazards while connecting pipes in a nine-foot deep trench at the Alexander Terminal Project Statoil Terminal near Alexander, ND.
Recent events (3)
  • — F (S) $0
  • — C (S) $6300
  • — Z (S) $6300

1926.651 K02

Other-than-serious 1 instance 3 exposed
Issued
Jan 16, 2015
Abate by
May 7, 2015
Penalty
Initial $0 · Current $2,250
29 CFR 1926.651(k)(2): Where the competent person found evidence of a situation that could result in possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, exposed employees were not removed from the hazardous area until the necessary precautions had been taken to ensure their safety:       (a) On or about July 25, 2014, for the three employees that were exposed to cave-in hazards while connecting pipes in a nine-foot deep trench with vertical side walls and no means of egress at the Alexander Terminal Project Statoil Terminal near Alexander, ND.
Recent events (3)
  • — F (O) $2250
  • — C (S) $0
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339893091.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.