WASHINGTON, DC ·
OSHA Inspection: C.H. SIDING COMPANY
Programmed Related inspection · Safety discipline
At a glance
On , OSHA opened a programmed Related safety inspection of C.H. SIDING COMPANY in 3299 FT LINCOLN DR NE LOT 417, WASHINGTON, DC 20009 (NAICS 238170). OSHA activity number 339901811.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- C.H. SIDING COMPANY
- Site address
- 3299 FT LINCOLN DR NE LOT 417
- City
- WASHINGTON
- State
- DC
- ZIP
- 20009
- Mailing
- 7851-B BEECHCRAFT AVE, GAITHERSBURG, MD 20879
What kind of inspection was it?
- Inspection type
- Programmed Related (I)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238170
- Employees
- 11
- Ownership type
- Private (A)
Citations
1 citation on file for this inspection.
1926.451 B03
- Issued
- Aug 27, 2014
- Abate by
- Sep 23, 2014
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(b)(3): The front edge of all platforms was not 14 inches (36 cm) or less from the face of the work, and no guardrail systems were erected along the front edge and/or no personal fall arrest systems were used in accordance with paragraph (g) of this section to protect employees from falling: a) On August 14, 2014 and at times prior thereto; East side of building; employees were working off a pump-jack scaffold which was 36 inches from the work-face exposing them to a 30 ft. fall to ground level while installing the siding on the residential home. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
- · Z (S) $2800
More inspections in this industry (NAICS 238170)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339901811.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.