Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,198,892Inspections Most recent open 2026-09-03 Last loaded 2026-09-07

OSHA Inspection: MARATHON FEED AND GRAIN, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MARATHON FEED AND GRAIN, LLC in 2920 FEED LANE, MARATHON, WI 54448 (NAICS 311119). OSHA activity number 339902751.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Marathon Feed and Grain, LLC for free Get an email when a new federal OSHA severe-injury report for Marathon Feed and Grain, LLC is published. One employer, no account, unsubscribe in one click.
Site address
2920 FEED LANE
City
MARATHON
State
WI
ZIP
54448
Mailing
P.O. BOX 246, MARATHON, WI 54448
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
311119
Employees
20
Ownership type
Private (A)

6 citations on file for this inspection.

1910.219 C04 I

Serious Gravity 5 2 instances 2 exposed
Issued
Nov 6, 2014
Penalty
Initial $2,040 · Current $1,428 Reduced
29 CFR 1910.219(c)(4)(i):  Unguarded projecting shaft end(s) did not present a smooth edge and end and projected more than one half the diameter of the shaft:  On or about 08/14/2014, two unguarded projecting shaft ends projected more than one half inch and were not guarded by nonrotating caps or safety sleeves.  a)  The projecting shaft end of the bagging machine's conveyor belt measured approximately 1.25 inches in diameter and projected 1.25 inches.  b)  The projecting shaft end of the auxiliary conveyor belt measured approximately 1 inch in diameter and projected 1.38 inches.
Recent events (2)
  • · I (S) $1428
  • · Z (S) $2040

1910.219 D01

Serious Gravity 5 2 instances 3 exposed
Issued
Nov 6, 2014
Penalty
Initial $1,700 · Current $1,190 Reduced
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o):  a)  On or about 08/13/2014, pulleys with parts less than seven feet from the floor or work platform were not guarded on two motors located on the south side of the southern outdoor elevator legs.
Recent events (2)
  • · I (S) $1190
  • · Z (S) $1700

1910.219 E03 I

Serious Gravity 5 1 instance 3 exposed
Issued
Nov 6, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.219(e)(3)(i): Vertical or inclined belt(s) were not enclosed by guard(s) conforming to the requirements specified at 29 CFR 1910.219(m) and (o):  a)  On or about 08/13/2014, inclined belts less than seven feet from the floor or work platform were not enclosed by guards on two motors located on the south side of the southern outdoor elevator legs.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.272 K

Serious Gravity 1 1 instance 3 exposed
Issued
Nov 6, 2014
Abate by
Dec 24, 2014
Penalty
Initial $1,020 · Current $714 Reduced
29 CFR 1910.272(k): Receiving pit feed openings in the grain handling facility, such as truck or railcar receiving pits, were not covered by grates which had a maximum opening width of 2 1/2 inches:  a)  On or about 08/14/2014, the Cob Pit opening in the receiving bay was covered with an adjustable metal grate which had openings as wide as 3 1/2 inches.
Recent events (2)
  • · I (S) $714
  • · Z (S) $1020

1910.305 G01 IV A

Serious Gravity 1 1 instance 1 exposed
Issued
Nov 6, 2014
Penalty
Initial $1,020 · Current $714 Reduced
29 CFR 1910.305(g)(1)(iv)(A):  Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure:  a)  On or about 08/13/2014, a flexible extension cord was used as a substitute for fixed wiring for a sump pump located in the sump pit adjacent to the south side of the southern outdoor elevator legs.
Recent events (2)
  • · I (S) $714
  • · Z (S) $1020

1910.132 D02

Other-than-serious 1 instance 2 exposed
Issued
Nov 6, 2014
Abate by
Dec 11, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.132(d)(2): The employer did not verify that the required workplace hazard assessment has been performed through a written certification that identifies the workplace evaluated, the person certifying that the evaluation has been performed, the date(s) of the hazard assessment, and, which identifies the document as a certification of hazard assessment:  a)  On or about 08/14/2014, the employer did not verify through written certification that a hazard assessment had been conducted when employees were exposed to the hazards of flying particles and dust.
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339902751.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.