Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,191,288Inspections Most recent open 2026-07-24 Last loaded 2026-07-29

OSHA Inspection: RYSZARD ZBROINSKI CONSTRUCTION, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of RYSZARD ZBROINSKI CONSTRUCTION, INC. in 729 MILBURN STREET, EVANSTON, IL 60201 (NAICS 238160). OSHA activity number 339909889.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Ryszard Zbroinski Construction, INC. — free Get an email when a new federal OSHA severe-injury report for Ryszard Zbroinski Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
729 MILBURN STREET
City
EVANSTON
State
IL
ZIP
60201
Mailing
9445 GREENWOOD, DES PLAINES, IL 60016
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
4
Ownership type
A

3 citations on file for this inspection.

1926.451 G01 I

Serious Gravity 10 3 instances 3 exposed
Issued
Aug 22, 2014
Abate by
Aug 28, 2014
Penalty
Initial $2,800 · Current $1,500 Reduced
29 CFR 1926.451(g)(1)(i): Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold was not protected by a personal fall arrest system:          a) Employees were exposed to the hazard of falling approximately 17 feet while working from ladder jack scaffolding without the benefit of fall protection.         In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1500
  • — Z (S) $2800

1926.501 B13

Serious Gravity 10 3 instances 3 exposed
Issued
Aug 22, 2014
Abate by
Aug 28, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b):       a) Employees were exposed to the hazard of falling while working from a pitched roof having a ground to eave height of approximately 19 feet without the use of fall protection.       In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.503 A01

Serious Gravity 5 3 instances 3 exposed
Issued
Aug 22, 2014
Abate by
Sep 18, 2014
Penalty
Initial $2,000 · Current $1,000 Reduced
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards:     a) The employer did not provide training to enable employees to recognize the hazards of falling and the procedures to be followed to eliminate or control such hazards at the worksite.       In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1000
  • — Z (S) $2000

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339909889.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.