2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Inspection: THE A-TEAM SHIP REPAIR AND FABRICATION CORPORATION

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of THE A-TEAM SHIP REPAIR AND FABRICATION CORPORATION in GENERAL DYNAMICS NASCO NORFOLK USS CARTER HALL, NORFOLK, VA 23511 (NAICS 336611). OSHA activity number 339932444.

Watch THE A-Team Ship Repair AND Fabrication Corporation — free Get an email when a new federal OSHA severe-injury report for THE A-Team Ship Repair AND Fabrication Corporation is published. One employer, no account, unsubscribe in one click.
Site address
GENERAL DYNAMICS NASCO NORFOLK USS CARTER HALL
City
NORFOLK
State
VA
ZIP
23511
Mailing
P.O. BOX 15972, CHESAPEAKE, VA 23328
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
336611
Employees
35
Ownership type
A

2 citations on file for this inspection.

1910.212 A05

Serious Gravity 5 1 instance 7 exposed
Issued
Abate by
Penalty
Initial $4200.00 · Current $3150.00 Reduced
29 CFR 1910.212(a)(5): Fan blade guard(s) were not provided where the periphery of the blades was less than seven feet from the floor or working level:  a.)  The A-Team Ship Repair and Fabrication Corporation, General Dynamics NASCO Norfolk, USS Carter Hall, Tank 6-35-2-W:  On or about 08/22/14, an employee was injured by the unguarded blades of the Americ VAF 3000 ventilation fan.  Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $3150
  • — Z (S) $4200

1915.56 B02

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $2100.00 Reduced
29 CFR 1915.56(b)(2): Welding cable was not free from repair or splices for a minimum distance of 10 feet from the cable end to which the electrode holder was connected.:  a.)  The A-Team Ship Repair and Fabrication Corporation, General Dynamics NASCO Norfolk, USS Carter Hall, Tank 6-67-1-W:  On or about 8/28/14, an employee was using a Flux Core welding lead that had a repair 32" from the electrode holder.   Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2100
  • — Z (S) $2800

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339932444.