POOLER, GA —
OSHA Inspection: JORDAN CONSTRUCTION COMPANY OF HILTON HEAD, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of JORDAN CONSTRUCTION COMPANY OF HILTON HEAD, INC. in CORNER OF NORTH GODLEY STATION AND WEST GODLEY STATION, POOLER, GA 31322 (NAICS 237110). OSHA activity number 339993537.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- JORDAN CONSTRUCTION COMPANY OF HILTON HEAD, INC.
- Site address
- CORNER OF NORTH GODLEY STATION AND WEST GODLEY STATION
- City
- POOLER
- State
- GA
- ZIP
- 31322
- Mailing
- P.O. BOX 21747, HILTON HEAD ISLAND, SC 29925
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237110
- Employees
- 20
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.100 A
- Issued
- Mar 18, 2015
- Abate by
- Mar 30, 2015
- Penalty
- Initial $1,200 · Current $500 Reduced
General-duty citation text
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: a) At the job site, on October 8, 2014, the employer did not ensure that an employee who was preforming preparation work in the excavation, that measured five feet in depth with a spoil pile at the edge of the excavation that measured three feet in height for a total depth of eight feet, wore a hard hat to safeguard against falling debris, exposing the employee to the hazards associated with bruises and lacerations to the head.
Recent events (3)
- — F (S) $500
- — C (S) $1200
- — Z (S) $1200
1926.651 C02
- Issued
- Mar 18, 2015
- Abate by
- Mar 30, 2015
- Penalty
- Initial $1,600 · Current $0 Reduced
General-duty citation text
29 CFR 1926.651(c)(2): A stairway, ladder, ramp or other safe means of egress was not located in trench excavations that were 4 feet (1.22m) or more in depth so as to require no more than 25 feet (7.62m) of lateral travel for employees: a) At the job site, on October 8, 2014, the employer did not ensure an employee was provided the proper means of access and egress from an excavation, that measured five feet in death with a spoil pile that measured three feet in height that was placed at the edge of the excavation, who was performing preparation work for the installation of force and reclaim sewage lines, exposing the employee to hazards associated with broken bones, sprains, bruises, and lacerations.
Recent events (3)
- — F (S) $0
- — C (S) $1600
- — Z (S) $1600
1926.651 J02
- Issued
- Mar 18, 2015
- Abate by
- Mar 30, 2015
- Penalty
- Initial $22,000 · Current $11,000 Reduced
General-duty citation text
29 CFR 1926.651(j)(2): Employees were not protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations, or by a combination of both if necessary. a) At the north west section of the excavation, on October 8, 2014, the employer did not ensure the spoil pile, that measured three feet in height, was placed at least two feet from the edge of the excavation, that measured five feet in depth, where an employee was performing preparation work for the installation of force and reclaim sewer lines, exposing the employee to the hazards associated with death, broken bones, lacerations, and bruises.
Recent events (3)
- — F (W) $11000
- — C (W) $22000
- — Z (W) $22000
1926.652 A01
- Issued
- Mar 18, 2015
- Abate by
- Mar 30, 2015
- Penalty
- Initial $22,000 · Current $11,000 Reduced
General-duty citation text
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652(b) or 1926.652(c): a) At the site, on October 8, 2014, the employer did not provide for cave in protection for an employee observed preforming preparation work for the installation for force and reclaim sewage lines in the north east section of an excavation that measured five feet in depth with a spoil pile that measured three feet in height, that was located directly at the edge of the excavation for a total depth of eight feet, exposing the employee the hazards associated with death, broken bones, lacerations, and bruises.
Recent events (3)
- — F (W) $11000
- — C (W) $22000
- — Z (W) $22000
More inspections at Jordan Construction Company of Hilton Head, INC.
View Jordan Construction Company of Hilton Head, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 237110)
More inspections in GA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339993537.