SPRING, TX —
OSHA Inspection: ANTONIO ALVAREZ MARTINEZ
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ANTONIO ALVAREZ MARTINEZ in 3706 PINE BROOK HOLLOW LANE, SPRING, TX 77386 (NAICS 238140). OSHA activity number 339993891.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ANTONIO ALVAREZ MARTINEZ
- Site address
- 3706 PINE BROOK HOLLOW LANE
- City
- SPRING
- State
- TX
- ZIP
- 77386
- Mailing
- 138 GREYFRIAR DR, HOUSTON, TX 77037
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 9
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.451 B01
- Issued
- Oct 15, 2014
- Abate by
- Oct 30, 2014
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports. The employer does not ensure that each platform on all working levels of scaffolds was fully planked or decked between the front uprights and the guardrail supports. This violation was observed on or about October 8, 2014 when employees were exposed to a 13 foot fall hazard while doing masonry work form the second level of a scaffold without it being fully planked. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that all working levels of scaffolds are fully planked or decked between the front uprights and the guardrail supports.
Recent events (1)
- — Z (S) $2800
1926.451 G01
- Issued
- Oct 15, 2014
- Abate by
- Oct 30, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level. The employer does not protect employees from falling when working on scaffold more than 10 feet above a lower level. This violation was observed on or about October 8, 2014, at the job site where employees were exposed to a fall hazard when working from a platform of frame scaffold at approximately 13 feet above the ground without being protected from falling to the ground. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that all employees working from a scaffold 10 feet or more above a lower level are protected from falling.
Recent events (1)
- — Z (S) $0
1926.451 C02
- Issued
- Oct 15, 2014
- Abate by
- Oct 30, 2014
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation. The employer does not ensure that scaffold legs bear on base plates and mud sills other adequate firm foundation. This violation was observed on or about October 8, 2014 at the job site where employees were exposed to an approximate 13 foot fall hazard when working on an frame scaffold without base plates and mud sills. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that all scaffold legs bear on base plates and mud sills.
Recent events (1)
- — Z (S) $2800
1926.451 C03
- Issued
- Oct 15, 2014
- Abate by
- Oct 30, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(c)(3): Supported scaffold poles, legs, post, frames, and/or uprights were not plumb and braced to prevent swaying and displacement: The employer does not ensure that scaffold poles, legs, post, frames, and/or uprights are plumb and braced to prevent swaying and displacement. This violation was observed on or about October 8, 2014 at the job site where employees were exposed to a fall hazard when working on an frame scaffold without supported scaffold poles, legs, post, frames, and/or uprights plumb and braced to prevent swaying and displacement. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that all supported scaffold poles, legs, post, frames, and/or uprights are plumb and braced to prevent swaying and displacement.
Recent events (1)
- — Z (S) $0
1926.451 E01
- Issued
- Oct 15, 2014
- Abate by
- Oct 30, 2014
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. The employer does not ensure that employees have a ladder, stairway, or ramp to access a scaffold. This violation occurred on or about October 8, 2014 when employees were exposed to an approximate 13 foot fall hazard while installing brick and rock siding on a two story residential structure from an elevated scaffold without adequate access. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that employees have proper access to the scaffold platform.
Recent events (1)
- — Z (S) $2800
More inspections in this industry (NAICS 238140)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339993891.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.