NEWINGTON, CT —
OSHA Inspection: BEACON INDUSTRIES, INC.
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of BEACON INDUSTRIES, INC. in 549 CEDAR STREET, NEWINGTON, CT 06111 (NAICS 336412). OSHA activity number 340036003.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BEACON INDUSTRIES, INC.
- Site address
- 549 CEDAR STREET
- City
- NEWINGTON
- State
- CT
- ZIP
- 06111
- Mailing
- 549 CEDAR STREET, NEWINGTON, CT 06111
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 336412
- Employees
- 130
- Ownership type
- A
Citations
30 citations on file for this inspection.
1910.36 D01
- Issued
- Mar 27, 2015
- Penalty
- Initial $3,600 · Current $2,340 Reduced
General-duty citation text
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: Front of building, near Validation Room: On, or about, October 21, 2014, a padlock had been installed on the exit door. The door was clearly marked as an exit.
Recent events (2)
- — I (S) $2340
- — Z (S) $3600
1910.37 A03
- Issued
- Mar 27, 2015
- Penalty
- Initial $2,700 · Current $1,755 Reduced
General-duty citation text
29 CFR 1910.37(a)(3): Exit access went through a room that could be locked, such as a bathroom, to reach an exit or exit discharge, or may it lead into a dead-end corridor: Front of building, near Validation Room: On, or about, October 21, 2014, a dead-end corridor was located in the path the exit door located at the front of the plant area. The corridor led to an abandoned front office and the door to the office was normally left locked.
Recent events (2)
- — I (S) $1755
- — Z (S) $2700
1910.124 B04 II
- Issued
- Mar 27, 2015
- Penalty
- Initial $3,600 · Current $2,340 Reduced
General-duty citation text
29 CFR 1910.124(b)(4)(ii): Mechanical ventilation did not conform to NFPA 34-1995, Standard for Dip Tanks Containing Flammable or Combustible Liquids: Comparator Area: On, or about, October 24, 2014, pvc pipe was used as part of the exhaust duct system for the Crystal Clean parts washing tank. Crystal Clean 140 Solvent was a Category 4 flammable liquid. Ref. NFPA 34 - 1995, Section 5-6.
Recent events (2)
- — I (S) $2340
- — Z (S) $3600
1910.124 J01
- Issued
- Mar 27, 2015
- Penalty
- Initial $3,600 · Current $2,340 Reduced
General-duty citation text
29 CFR 1910.124(j)(1): The hoods and ductwork of the ventilation system were not inspected for corrosion or damage at least quarterly during operation: On, or about, October 24, 2014, the company had not developed and implemented a quarterly inspection program on the ventilation system to inspect for corrosion on the following dipping and coating operations: A. Etch Room: 1. Chem Etch. 2. Anodize Etch. B. Comparator: Crystal Clean solvent tank.
Recent events (2)
- — I (S) $2340
- — Z (S) $3600
1910.124 J02 I
- Issued
- Mar 27, 2015
- Abate by
- May 13, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.124(j)(2)(i): The employer did not ensure airflow was adequate at least quarterly during operation: On, or about, October 24, 2014, the company had not developed and implemented a quarterly inspection program to ensure adequate airflow in the ventilation systems provided for the following dipping and coating operations: A. Etch Room: 1. Chem Etch. 2. Anodize Etch. B. Comparator Area: Crystal Clean solvent tank.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.124 J03
- Issued
- Mar 27, 2015
- Abate by
- May 13, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.124(j)(3): Periodic inspections of all dipping and coating equipment, including covers, drains, overflow piping, and electrical and fire-extinguishing systems were not conducted, and deficiencies were not promptly corrected: On, or about, October 24, 2014, the company had not developed and implemented a periodic inspection program of all equipment contained in the following dipping and coating operations: A. Etch Room: 1. Chem Etch. 2. Anodize Etch. B. Comparator Area: Crystal Clean solvent tank.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.133 A01
- Issued
- Mar 27, 2015
- Penalty
- Initial $4,500 · Current $2,925 Reduced
General-duty citation text
29 CFR 1910.133(a)(1): The employer did not ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation: Broach Department: On, or about, October 24, 2014, an employee was operating Machine 2668, an Ex-cell-o broach cutter grinder, while wearing regular street glasses instead of safety glasses.
Recent events (2)
- — I (S) $2925
- — Z (S) $4500
1910.147 C04 I
- Issued
- Mar 27, 2015
- Abate by
- Jul 13, 2015
- Penalty
- Initial $3,600 · Current $2,340 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: Company: On, or about, January 8, 2015, the Lock Out/Tag Out Safety Program did not include specific lockout procedures for turning centers and other equipment that had been brought into the plant from the Bloomfield, Connecticut facility during consolidation operations. The relocated equipment was operational, however, lockout procedures had not been developed.
Recent events (2)
- — I (S) $2340
- — Z (S) $3600
1910.147 C06 I
- Issued
- Mar 27, 2015
- Abate by
- May 13, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: Company: On, or about, January 8, 2015, specific lockout procedures included in the Lock Out/Tag Out Safety Program had not been reviewed since they were developed in 2008.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.178 A04
- Issued
- Mar 27, 2015
- Penalty
- Initial $3,600 · Current $2,340 Reduced
General-duty citation text
29 CFR 1910.178(a)(4): Modifications and additions which affect capacity and safe operation were performed by the customer or user without manufacturers prior written approval. Capacity, operation, and maintenance instruction plates, tags, or decals were not be changed accordingly: Validation Room: On, or about, October 21, 2014, the company had not updated the identification plate on the Hyster forktruck, serial number C5D6744 to show the reduced capacity when the Vestil boom attachment was used.
Recent events (2)
- — I (S) $2340
- — Z (S) $3600
1910.178 A05
- Issued
- Mar 27, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.178(a)(5): 29 CFR 1910.178(a)(5): Powered industrial truck(s) equipped with front-end attachments other than factory installed attachments require the user to request that the truck be marked to identify the attachments and show the approximate weight of the truck and attachment combination at maximum elevation with load laterally centered: Validation Room: On, or about, October 21, 2014, the identification plate provided on the Hyster forktruck, serial number C5D6744, showed a 24 inch load center on the capacity chart. The forktruck was provided with 6 foot long forks.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.212 A01
- Issued
- Mar 27, 2015
- Abate by
- Nov 13, 2015
- Penalty
- Initial $6,300 · Current $4,095 Reduced
General-duty citation text
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by rotating parts and flying chips: A. Bullard Area: On, or about, October 24, 2014, the shield provided around Bullard VTL 0013 was approximately 35 inches above the work platform on which the operator stood. The shield should have been at least 42 inches above the work platform. B. Tool Room: On, or about, November 19, 2014, the following Okuma horizontal lathes were not provided with chuck guards: M23, M24 and M25. C. Turning Cell: On, or about, November 14, 2014, the door interlock switches provided on Machine # 4391 and Machine #4392, two Mori Seiki SL-65 turning centers, had been bypassed. The door key had been removed from the access door and inserted into the key receiver. D. Football Field: 1. On, or about, January 8, 2015, the YCM M100 turning center was not provided with an interlock on the access door during the automatic cycle and the auger-type chip conveyor was not safeguarded either by the use of a constant pressure control, door interlock or physical barrier guards. 2. On, or about, November 14, 2014, the door interlock switches provided on Machines M18 and M19, two Mori Seiki Model SL-65 Turning Centers, had been bypassed. 3. On, or about, January 8, 2015, Machine M56, a Supermax V2110B turning center was not provided with an interlock on the access door during the automatic cycle and the auger-type chip conveyor was not safeguarded either by the use of a constant pressure control, door interlock or physical barrier guard. 4. On, or about, January 8, 2015, the door interlock switches provided on Machine M87 and Machine M88, two Puma 450 turning centers, had been bypassed. E. Back Tool Room Area: On, or about, November 19, 2014, the door interlock switch provided on Monarch VMC 175B milling center had been bypassed.
Recent events (2)
- — I (S) $4095
- — Z (S) $6300
1910.215 A02
- Issued
- Mar 27, 2015
- Penalty
- Initial $3,600 · Current $2,340 Reduced
General-duty citation text
29 CFR 1910.215(a)(2): Abrasive wheel(s) used on grinding machinery were not provided with safety guard(s) which covered the spindle end, nut, flange projections: Broach Department, Grinding Area: On, or about, October 24, 2014, the guard provided on the Reid surface grinder, machine 2385, did not cover the flange.
Recent events (2)
- — I (S) $2340
- — Z (S) $3600
1910.215 B05
- Issued
- Mar 27, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.215(b)(5): The angular exposure of grinding wheel periphery and sides for safety guards used on surface grinding machine(s) employing the wheel periphery exceeded 150 degrees: Broach Department, Grinding Area: On, or about, October 24, 2014, the guard provided on the Reid surface grinder, machine 2385, allowed approximately 168 degrees of exposure of the abrasive wheel.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.217 B04 III
- Issued
- Mar 27, 2015
- Abate by
- May 13, 2015
- Penalty
- Initial $2,700 · Current $1,755 Reduced
General-duty citation text
29 CFR 1910.217(b)(4)(iii): Pedal return spring(s) of pedal(s) used on mechanical power press(es) using full revolution clutches were not of the compression type, operating on a rod or guided within a hole or tube, or designed to prevent interleaving of spring coils in the event of breakage: Tool Room: On, or about, November 19, 2014, the foot pedal return spring provided on Machine #2516, a V&O full revolution mechanical power press, was a tension type spring.
Recent events (2)
- — I (S) $1755
- — Z (S) $2700
1910.217 C01 I
- Issued
- Mar 27, 2015
- Abate by
- May 13, 2015
- Penalty
- Initial $6,300 · Current $4,095 Reduced
General-duty citation text
29 CFR 1910.217(c)(1)(i): The employer did not provide and ensure the usage of point of operation guards or properly applied point of operation devices on every operation performed on mechanical power press(es): Tool Room: On, or about, November 19, 2014, point of operation safeguarding was not provided on Machine #2516, a V&O full revolution mechanical power press.
Recent events (2)
- — I (S) $4095
- — Z (S) $6300
1910.217 E01 I
- Issued
- Mar 27, 2015
- Abate by
- May 13, 2015
- Penalty
- Initial $3,600 · Current $2,340 Reduced
General-duty citation text
29 CFR 1910.217(e)(1)(i): A program of periodic and regular inspections of mechanical power press(es) was not established and followed to ensure that all parts, auxiliary equipment and safeguards were in a safe operating condition and adjustment: Tool Room: On, or about, November 19, 2014, the company did not conduct periodic, documented inspections on Machine #2516, a V&O full revolution mechanical power press.
Recent events (2)
- — I (S) $2340
- — Z (S) $3600
1910.217 E01 II
- Issued
- Mar 27, 2015
- Abate by
- May 13, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.217(e)(1)(ii): Mechanical power press(es) were not inspected and tested at least weekly to determine the condition of the clutch/brake mechanism and single stroke mechanism: Tool Room: On, or about, November 19, 2014, the company did not conduct weekly inspections on Machine #2516, a V&O full revolution mechanical power press.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.242 B
- Issued
- Mar 27, 2015
- Penalty
- Initial $3,600 · Current $2,340 Reduced
General-duty citation text
29 CFR 1910.242(b): Compressed air used for cleaning purposes was not reduced to less than 30 p.s.i.: Blue Line: On, or about, October 24, 2014, compressed air nozzles provided at the following Ex-cell-o vertical turret lathes were measured to be approximately 60 psi, dead-ended: A. 1744. B. 1736.
Recent events (2)
- — I (S) $2340
- — Z (S) $3600
1910.303 B02
- Issued
- Mar 27, 2015
- Penalty
- Initial $2,700 · Current $1,755 Reduced
General-duty citation text
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: A. Broach Cutting Insert Storage Area: On, or about, October 24, 2014, a Datagard relocatable power tap used to energize a light fixture was plugged into an extension cord. B. Broach, Detroit Broach Machine 2871: On, or about, November 14, 2014, an extension cord assembly the included a knockout box designed for permanent mounting was used to energize an engraving pen. C. Shipping: On, or about, November 14, 2014, an Ace power tap that was used to energize a fan and heat sealer was plugged into an extension cord.
Recent events (2)
- — I (S) $1755
- — Z (S) $2700
1910.303 G01 I A
- Issued
- Mar 27, 2015
- Penalty
- Initial $2,700 · Current $1,755 Reduced
General-duty citation text
29 CFR 1910.303(g)(1)(i)(A): For electric equipment operating at 600 volts, nominal, or less to ground, and likely to require examination, adjustment, servicing, or maintenance while energized, the depth of the working space in the direction of access to live parts (as measured from the live parts where they were exposed or from the enclosure front or opening where they were enclosed) was less than indicated in Table S-1 of Subpart S of Part 1910: Waste Water Treatment Area: On, or about, October 24, 2014, a concrete foundation for a piece of equipment and railings provided on a set of fixed stairs had been installed in the working space in front of two electrical panelboards, a Westinghouse and a GE.
Recent events (2)
- — I (S) $1755
- — Z (S) $2700
1910.305 G01 IV A
- Issued
- Mar 27, 2015
- Penalty
- Initial $3,600 · Current $2,340 Reduced
General-duty citation text
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: A. Steel Shot Area: On, or about, October 24, 2014, an extension cord was used to energize a work bench mounted light fixture. B. Blue Line: On, or about, October 24, 2014, an extension cord was used to energize a light fixture at Ex-cell-o VTL 1736. C. Broach Cutting Insert Storage Area: On, or about, October 24, 2014, a reel-type extension cord was used to energize a power tap that in turn energized a light fixture. The reel assembly and the cord were lying on the floor and was run under work carts. D. Broach, Detroit Broach machine 2871: On, or about, November 14, 2014, an extension cord assembly that included a knockout box designed for permanent mounting was run under a floor mat and was used to energize an engraving pen. E. Shipping: On, or about, November 14, 2014, a yellow extension cord was used to energize an Ace power strip that in turn energized a fan and a sealing machine.
Recent events (2)
- — I (S) $2340
- — Z (S) $3600
1910.332 B01
- Issued
- Mar 27, 2015
- Abate by
- Jul 13, 2015
- Penalty
- Initial $6,300 · Current $3,445 Reduced
General-duty citation text
29 CFR 1910.332(b)(1): Employees were not trained in and familiar with the safety-related work practices required by 1910.331 through 1910.335 that pertained to their respective job assignments: Company: On, or about, January 8, 2014, maintenance personnel had not been adequately trained regarding what work practices and protective equipment was required to protect them against electric shock, arc flash and arc blast hazards while performing live trouble-shooting and when verifying whether or not electrical equipment was properly de-energized.
Recent events (2)
- — I (S) $3445
- — Z (S) $6300
1910.335 A01 I
- Issued
- Mar 27, 2015
- Abate by
- Jul 13, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.335(a)(1)(i): Employees working in areas where there were potential electrical hazards were not using electrical protective equipment that was appropriate for the specific parts of the body to be protected and for the work to be performed: Company: On, or about, January 8, 2015, personal protective equipment such as, but not limited to, voltage rated gloves, fire resistive clothing, face shields, balaclavas, hard hats and hearing protection were not provided to employees who performed live electrical work, including trouble-shooting, or who verified that electrical equipment was properly de-energized.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.333 A01
- Issued
- Mar 27, 2015
- Abate by
- Jul 13, 2015
- Penalty
- Initial $4,500 · Current $2,925 Reduced
General-duty citation text
29 CFR 1910.333(a)(1): Live parts to which an employee may be exposed were not de-energized before the employee worked on or was near them: Company: On, or about, January 8, 2014, the employer had not developed and implemented an Electrical Safety Related Work Practices program to address hazards caused by arc flash, arc blast and electric shock in the facility. The company allowed buss mounted disconnect boxes to be installed into live buss systems during a plant consolidation project during November/December 2014.
Recent events (2)
- — I (S) $2925
- — Z (S) $4500
1910.335 A01 II
- Issued
- Mar 27, 2015
- Abate by
- May 13, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.335(a)(1)(ii): Protective equipment was not maintained in a safe, reliable condition and/or was not periodically inspected or tested: Company: On, or about, November/December 2014, a pair of Salisbury Class 00 gloves was worn by an employee while installing disconnect boxes into an overhead buss duct. The gloves had not been inspected since March 2011. Ref. 29 CFR 1910.137
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.169 B03 I
- Issued
- Mar 27, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.169(b)(3)(i): Compressed air receiver(s) were not equipped with indicating pressure gauge(s): Reception Area: On, or about, November 4, 2014, an air receiver tank that was installed as part of the air system for the plant was not provided with a pressure gauge.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.303 F02
- Issued
- Mar 27, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: Waste Water Treatment Area: On, or about, October 24, 2014, circuit breakers located in the following panelboards were not labeled to indicate their use: A. Westinghouse. B. GE.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1904.29 B01
- Issued
- Jan 13, 2015
- Abate by
- Mar 3, 2015
- Penalty
- Initial $900 · Current $540 Reduced
General-duty citation text
29 CFR 1904.29(b)(1): A Log of all recordable work-related injuries and illnesses (OSHA Form 300 or equivalent) was not completed in the detail as required by the regulation: Company: On, or about, October 21, 2014, the following entries on the 2014 OSHA 300 log did not have information included in Columns G through J: A. Case 12, an injury that occurred on July 17. B. Case 13, an injury that occurred on August 14.
Recent events (2)
- — I (O) $540
- — Z (O) $900
1904.29 B03
- Issued
- Jan 13, 2015
- Abate by
- Mar 3, 2015
- Penalty
- Initial $900 · Current $540 Reduced
General-duty citation text
29 CFR 1904.29(b)(3): Each recordable injury or illness was not entered on the OSHA 300 Log within seven (7) calendar days of receiving information that a recordable injury or illness had occurred: Company: On, or about, October 21, 2014, an injury that had occurred on September 10, 2014 involving a back strain, had not been recorded on the 2014 OSHA 300 Log.
Recent events (2)
- — I (O) $540
- — Z (O) $900
More inspections at Beacon Industries, INC.
View Beacon Industries, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 336412)
More inspections in CT
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340036003.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.