PLANT CITY, FL —
OSHA Inspection: COMPLETE MASONRY, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of COMPLETE MASONRY, INC. in 2103 JAMES L. REDMAN PWY., PLANT CITY, FL 33563 (NAICS 238140). OSHA activity number 340055714.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- COMPLETE MASONRY, INC.
- Site address
- 2103 JAMES L. REDMAN PWY.
- City
- PLANT CITY
- State
- FL
- ZIP
- 33563
- Mailing
- 4829 E. CARROLL RD., LAKELAND, FL 33801
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 8
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.451 B01
- Issued
- Nov 19, 2014
- Penalty
- Initial $2,800 · Current $1,680 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a. On or about 10/30/2014, at the job site - employees were exposed to a 22'5" and a 12'11" fall hazard, in that, the scaffold was not fully planked.
Recent events (2)
- — I (S) $1680
- — Z (S) $2800
1926.451 B02
- Issued
- Nov 19, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(b)(2): Scaffold platforms and walkways were not at least 18 inches wide: a. On or about 10/30/2014, at the job site - an employee was exposed to a 16'6" fall hazard, in that, he was working from the scaffold cross brace to nail a corner post.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 G04 I
- Issued
- Nov 19, 2014
- Penalty
- Initial $2,800 · Current $1,680 Reduced
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews: a. On or about 10/30/2014, at the job site - employees were exposed to a 22'5" and a 12'11" fall hazard, in that, the scaffold was not equipped with top and mid-rails.
Recent events (2)
- — I (S) $1680
- — Z (S) $2800
1926.1053 B04
- Issued
- Nov 19, 2014
- Penalty
- Initial $1,600 · Current $960 Reduced
General-duty citation text
29 CFR 1926.1053(b)(4): Ladders were used for purposes other than the purposes for which they were designed: a. On or about 10/30/2014, at the job site - an employee grinding masonry bricks was exposed to a 6 foot fall hazard, in that, he was working from an A-frame ladder which was propped against a wall and not fully opened.
Recent events (2)
- — I (S) $960
- — Z (S) $1600
More inspections at Complete Masonry, INC.
View Complete Masonry, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340055714.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.