Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,198,201Inspections Most recent open 2026-08-31 Last loaded 2026-09-03

OSHA Inspection: TECHNICAL POLYMERS, LLC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of TECHNICAL POLYMERS, LLC in 4917 GOLDEN PARKWAY, BUFORD, GA 30518 (NAICS 326199). OSHA activity number 340086503.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Technical Polymers, LLC for free Get an email when a new federal OSHA severe-injury report for Technical Polymers, LLC is published. One employer, no account, unsubscribe in one click.
Site address
4917 GOLDEN PARKWAY
City
BUFORD
State
GA
ZIP
30518
Mailing
4917 GOLDEN PARKWAY STE. 300, BUFORD, GA 30518
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
326199
Employees
35
Ownership type
Private (A)

5 citations on file for this inspection.

1910.23 B01 I

Serious Gravity 5 2 instances 10 exposed
Issued
Nov 20, 2014
Abate by
Dec 17, 2014
Penalty
Initial $3,927 · Current $2,356 Reduced
29 CFR 1910.23(b)(1)(i): Every wall opening from which there is a drop of more than 4 feet was not guarded by one of the following: Rail, roller, picket fence, half door, or equivalent barrier.  On or about 11/4/14, in the production area at production platforms, the employer did not ensure openings around equipment were protected or covered. Openings measured 3 feet by 2.6 feet.   In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (S) $2356
  • · Z (S) $3927

1910.212 A03 II

Serious Gravity 5 2 instances 15 exposed
Issued
Nov 20, 2014
Abate by
Dec 17, 2014
Penalty
Initial $3,273 · Current $1,968 Reduced
29 CFR 1910.212(a)(3)(ii): Point of operation guards were not designed and constructed as to prevent the operator from having any part of their body in the danger zone during the operating cycle.  On or about 11/4/2014, at the Buford facility, employees were exposed to equipment that was not equipped with guards to protect employees from the point of operations. Instances included:  1 - Craftsman Drill Press (Serial #178831)  2  - Feeder auger located on production platforms  In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (S) $1968
  • · Z (S) $3273

1910.252 B02 III

Serious Gravity 1 1 instance 15 exposed
Issued
Nov 20, 2014
Abate by
Dec 17, 2014
Penalty
Initial $1,964 · Current $1,179 Reduced
29 CFR 1910.252(b)(2)(iii): Workers and other persons adjacent to the welding area were not protected from the rays by noncombustible or flameproof screens or shields.  On 11/4/14, at the Buford facility, employees working near and around where welding operations occurred were not protected with welding screens or shields.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (S) $1179
  • · Z (S) $1964

1910.1200 H03 IV

Serious Gravity 1 1 instance 20 exposed
Issued
Nov 20, 2014
Abate by
Jan 9, 2015
Penalty
Initial $1,964 · Current $1,178 Reduced
29 CFR 1910.1200(h)(3)(iv):   The details of the hazard communication program developed by the employer, did not include an explanation of the labels received on shipped containers and the workplace labeling system used by their employer; the safety data sheet, including the order of information and how employee could obtain and use the appropriate hazard information.  On 11/4/14, at the Buford site, the employer did not ensure employees were trained in the Hazard Communication Program that included information required under the Global Harmonization System and new information pertaining to that program. Employees used chemicals including: Ecomass Compound 4703BI62, Nycal, MP1250, Acrawax C Lubricant, Songnox 1010, & Songnox 1098.  In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (S) $1178
  • · Z (S) $1964

1904.29 B01

Other-than-serious 1 instance 35 exposed
Issued
Nov 20, 2014
Abate by
Dec 17, 2014
Penalty
Initial $655 · Current $393 Reduced
29 CFR 1904.29(b)(1): A Log of all recordable work-related injuries and illnesses (OSHA From 300 or equivalent), was not completed in detail as required by the regulation.  On or about 11/4/14, at the Buford job site, the employer did not ensure injuries recorded were completed in the detail as required by the regulation. i.e. Column F descriptions were not complete and columns G-J were not properly marked for each injury listed on the log.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (O) $393
  • · Z (O) $655

View Technical Polymers, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 340086503.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.