WASHINGTON, DC —
OSHA Inspection: COLE ROOFING SYSTEMS INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of COLE ROOFING SYSTEMS INC. in 3530 QUESADA STREET NW, WASHINGTON, DC 20015 (NAICS 238160). OSHA activity number 340132554.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- COLE ROOFING SYSTEMS INC.
- Site address
- 3530 QUESADA STREET NW
- City
- WASHINGTON
- State
- DC
- ZIP
- 20015
- Mailing
- 605 PRINCESS STREET, ALEXANDRIA, VA 22314
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 12
- Ownership type
- A
Citations
1 citation on file for this inspection.
1926.501 B13
- Issued
- Dec 24, 2014
- Abate by
- Dec 31, 2014
- Penalty
- Initial $3,080 · Current $3,080
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) Right Side Roof Peak - Worker was standing, walking on and straddling the peak of a 12/12 pitch roof, replacing the roofs ridge vent, not protected from falling 25' to the ground below, on or about 12/10/2014. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
- — Z (S) $3080
More inspections at Cole Roofing Systems INC.
View Cole Roofing Systems INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340132554.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.