Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: COLE ROOFING SYSTEMS INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of COLE ROOFING SYSTEMS INC. in 3530 QUESADA STREET NW, WASHINGTON, DC 20015 (NAICS 238160). OSHA activity number 340132554.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Cole Roofing Systems INC. — free Get an email when a new federal OSHA severe-injury report for Cole Roofing Systems INC. is published. One employer, no account, unsubscribe in one click.
Site address
3530 QUESADA STREET NW
City
WASHINGTON
State
DC
ZIP
20015
Mailing
605 PRINCESS STREET, ALEXANDRIA, VA 22314
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
12
Ownership type
A

1 citation on file for this inspection.

1926.501 B13

Serious Gravity 10 1 instance 1 exposed
Issued
Dec 24, 2014
Abate by
Dec 31, 2014
Penalty
Initial $3,080 · Current $3,080
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):  a) Right Side Roof Peak - Worker was standing, walking on and straddling the peak of a 12/12 pitch roof, replacing the roofs ridge vent, not protected from falling 25' to the ground below, on or about 12/10/2014.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $3080

View Cole Roofing Systems INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340132554.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.