Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: CESAR FLORES

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of CESAR FLORES in 6380 S BOSTON ST, ENGLEWOOD, CO 80111 (NAICS 238140). OSHA activity number 340146273.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Cesar Flores — free Get an email when a new federal OSHA severe-injury report for Cesar Flores is published. One employer, no account, unsubscribe in one click.
Establishment
CESAR FLORES
Site address
6380 S BOSTON ST
City
ENGLEWOOD
State
CO
ZIP
80111
Mailing
3450 BRIDGEWOOD LANE, COLORADO SPRINGS, CO 80910
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
3
Ownership type
A

5 citations on file for this inspection.

1926.451 B01 I

Serious Gravity 1 1 instance 3 exposed
Issued
Feb 27, 2015
Abate by
Mar 9, 2015
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.451(b)(1)(i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights were no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary:  a) On or about December 18, 2014, and at times prior, the employer did not ensure that planks were installed in such a manner that no space greater than 1 inch existed.    Abatement note: Abatement certification is required for this item (See Certification of Corrective Action Worksheet).
Recent events (1)
  • — Z (S) $1200

1926.451 G01

Serious Gravity 5 1 instance 3 exposed
Issued
Feb 27, 2015
Abate by
Mar 9, 2015
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level.  a) On or about December 18, 2014, and at times prior, the employer did not ensure that employees were protected from falling off the end of the scaffold platform where no guardrails were in place.    Abatement Note: Abatement certification is required for this item (See Certification of Corrective Action Worksheet).
Recent events (1)
  • — Z (S) $2000

1926.451 H01

Serious Gravity 1 1 instance 3 exposed
Issued
Feb 27, 2015
Abate by
Mar 18, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.451(h)(1): Each employee on a scaffold was not provided with additional protection from falling hand tools, debris, and other small objects through the installation of toeboards, screens, guardrail systems, or through the erection of debris nets, catch platforms, or canopy structures that contain or deflect the falling objects.  For falling objects too large, heavy or massive to be contained or deflected, the employer did not place and secure such potential falling objects away from the edge of the surface from which they could fall:    a) On or about December 18, 2014, and at times prior, the employer did not install toeboards to ensure that objects on the scaffold would not fall and strike workers below.    Abatement note: Abatement certification is required for this item (See Certification of Corrective Action Worksheet).
Recent events (1)
  • — Z (S) $0

1926.451 C02

Other-than-serious 1 instance 3 exposed
Issued
Feb 27, 2015
Abate by
Mar 9, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames,  or uprights did not bear on base plates, mud sills or other adequate firm foundation:  a) On or about December 18, 2014, and at times prior, the employer did not ensure that the scaffold was assembled on a firm foundation where no mudsills were in use.    Abatement note: Abatement certification is required for this item (See Certification of Corrective Action Worksheet).
Recent events (1)
  • — Z (O) $0

1926.451 F07

Other-than-serious 1 instance 3 exposed
Issued
Feb 27, 2015
Abate by
Mar 18, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person.  a) On or about December 18, 2014, and at times prior, the employer did not ensure the scaffold was erected by and under the supervision of a competent person.    Abatement note: Abatement certification is required for this item (See Certification of Corrective Action Worksheet).
Recent events (1)
  • — Z (O) $0

View Cesar Flores's full OSHA safety record →