OSHA Inspection: MPC CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MPC CONSTRUCTION in 4411 12TH. ST., NE, WASHINGTON, DC 20017 (NAICS 236118). OSHA activity number 340190131.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch MPC Construction — free Get an email when a new federal OSHA severe-injury report for MPC Construction is published. One employer, no account, unsubscribe in one click.
Establishment
MPC CONSTRUCTION
Site address
4411 12TH. ST., NE
City
WASHINGTON
State
DC
ZIP
20017
Mailing
131 COLFAX DR., MANASSAS, VA 20111
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236118
Employees
3
Ownership type
A

7 citations on file for this inspection.

1926.403 D01

Serious Gravity 5 1 instance 4 exposed
Issued
Feb 20, 2015
Abate by
Mar 12, 2015
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.403(d)(1): Electric equipment was not firmly secured to the surface on which it was mounted:   a)       SW Corner of House, Electrical Service Entrance  On or about 01/16/2015, construction workers were exposed to an electrical contact hazard from an electrical meter and associated cables which were not attached to the side of a house as they are intended to be.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2000

1926.405 B02

Serious Gravity 10 1 instance 4 exposed
Issued
Feb 20, 2015
Abate by
Mar 12, 2015
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.405(b)(2): In energized installations, each outlet box did not have a cover, faceplate, or fixture canopy:   a)  All Floors - On or about 01/16/2015, construction workers were exposed to a 120 volt electrical contact hazard from wall-mounted outlet and switch boxes which were not provided with covers.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2800

1926.405 D

Serious Gravity 10 1 instance 2 exposed
Issued
Feb 20, 2015
Abate by
Mar 12, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.405(d): Panelboards mounted in cabinets, cutout boxes or enclosures designed for the purpose were not dead front:   a)      Basement  On or about 01/16/2015, construction workers were exposed to a 120 volt electrical contact hazard from a circuit distribution panel which was not provided with a cover and had no dead front.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.1052 B03

Serious Gravity 1 1 instance 4 exposed
Issued
Feb 20, 2015
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.1052(b)(3): Treads for temporary stairway service were not installed the full width and/or depth of the stair:   a)      Front Entrance Stairs - On or about 01/16/2015, construction workers were exposed to a fall hazard while using a set of stairs which had not been provided with stair treads while they accessed the main entrance of a house.
Recent events (1)
  • — Z (S) $1200

1926.1052 C01 I

Serious Gravity 1 1 instance 2 exposed
Issued
Feb 20, 2015
Abate by
Mar 12, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.1052(c)(1)(i): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one handrail:   a)       Basement Stairs  On or about 01/16/2015, construction workers using a set of stairs to access a houses basement were exposed to up to a 10 foot fall and were not provided with a handrail.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.1052 C01 II

Serious Gravity 1 1 instance 4 exposed
Issued
Feb 20, 2015
Abate by
Mar 12, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.1052(c)(1)(ii): A set of stairs was not provided at least one stairrail system along each unprotected side or edge:   a)      Front Entrance Stairs - On or about 01/16/2015, construction workers using a set of stairs having five risers to access the front entrance to a house were not provided with stairrails on either of the stairs open sides.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.1053 B12

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 20, 2015
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.1053(b)(12): Ladders used where the employee or the ladder could contact exposed energized electrical equipment did not have nonconductive siderails:   a)  SW Corner of House  On or about 01/16/2015, a carpenter was installing wood trim from an aluminum ladder which was located approximately 3 feet from a live overhead power line.
Recent events (1)
  • — Z (S) $2000

View MPC Construction's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340190131.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.