MANCHESTER, NH —
OSHA Inspection: BC IRON LLC
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of BC IRON LLC in DRIVING PARK ROAD, MANCHESTER, NH 03101 (NAICS 238120). OSHA activity number 340190727.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BC IRON LLC
- Site address
- DRIVING PARK ROAD
- City
- MANCHESTER
- State
- NH
- ZIP
- 03101
- Mailing
- 158 FORDWAY EXTENSION, DERRY, NH 03038
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238120
- Employees
- 12
- Ownership type
- A
Citations
8 citations on file for this inspection.
1926.757 A06
- Issued
- Jul 9, 2015
- Abate by
- Jul 15, 2015
- Penalty
- Initial $2,000 · Current $250 Reduced
General-duty citation text
29 CFR 1926.757(a)(6): Steel joist(s) were landed on a structure, and not secured to prevent unintentional displacement prior to installation. (a) Second Floor Between 1 Line & 2 Line and between A Line & B Line there were twelve bar joist which were not secured to prevent unintentional displacement. (b) Second Floor Between 1 Line & 2 Line and between B Line & C Line there were thirteen bar joist which were not secured to prevent unintentional displacement. (c) Second Floor Between 1 Line & 2 Line and between C Line & D Line there were fourteen bar joist which were not secured to prevent unintentional displacement. (d) Second Floor Between 2 Line & 3 Line and between B Line & C Line there were sixteen bar joist which were not secured to prevent unintentional displacement. (e) Second Floor Between 3 Line & 4 Line and between B Line & C Line there were fourteen bar joist which were not secured to prevent unintentional displacement. (f) Roof Between 2 Line & 3 Line and between A Line & B Line there were six bar joist which were not secured to prevent unintentional displacement. (g) Roof Between 4 Line & 6.3 Line and between B Line & C Line there were twelve bar joist which were not secured to prevent unintentional displacement. (h) Roof Between 4 Line & 5 Line and between D Line & E Line there were five bar joist which were not secured to prevent unintentional displacement. (i) Roof Between 5 Line & 6 Line and between C Line & D Line there were five bar joist which were not secured to prevent unintentional displacement.
Recent events (3)
- — R (S) $250
- — C (S) $2000
- — Z (S) $2000
1926.757 E04
- Issued
- Jul 9, 2015
- Abate by
- Jul 15, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.757(e)(4): Bundles of decking were placed on steel joists prior to all bridging being installed and anchored and all joist bearing ends attached. (a) 2nd Floor, Line 4/5, C/D - Bundles of decking were placed on bar joist prior to them being bridged and anchored. (b) 2nd Floor, Line 6/7, C/D - Bundles of decking were placed on bar joist prior to them being bridged and anchored. (c) Roof, Line 1/2, B/C - Bundles of decking were placed on bar joist prior to them being bridged and anchored. (d) Roof, Line 2/3, B/C - Bundles of decking were placed on bar joist prior to them being bridged and anchored. (e) Roof, Line 4/5, C/D - Bundles of decking were placed on bar joist prior to them being bridged and anchored. (f) Roof, Line 6/7, C/D - Bundles of decking were placed on bar joist prior to them being bridged and anchored. (g) Roof, Line 4/5, E/G - Bundles of decking were placed on bar joist prior to them being bridged and anchored. (h) Roof, Line 5/6, E/G - Bundles of decking were placed on bar joist prior to them being bridged and anchored. (i) Roof, Line 6/7, E/G - Bundles of decking were placed on bar joist prior to them being bridged and anchored.
Recent events (3)
- — R (S) $0
- — C (S) $0
- — Z (S) $0
1926.757 E05
- Issued
- Jul 9, 2015
- Abate by
- Jul 15, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.757(e)(5): The edge of the construction loads were placed within 1 foot (.30 m) of the bearing surface of the joist end. (a) Roof, Line 5/6, E/G - A bundle of steel decking was not placed within one foot of the end of the bar joist.
Recent events (3)
- — R (S) $0
- — C (S) $0
- — Z (S) $0
1926.453 B02 V
- Issued
- Jul 9, 2015
- Abate by
- Jul 15, 2015
- Penalty
- Initial $28,000 · Current $250 Reduced
General-duty citation text
29 CFR 1926.453(b)(2)(v): A body belt was not worn and/or a lanyard was not attached to the boom or basket when working from an aerial lift. (a) Jobsite On or about January 15, 2015 - Two employees were exposed to falls of up to 41 feet and exposed to an ejection hazard as they were not attached to the JLG Aerial Lift by a lanyard.
Recent events (3)
- — R (S) $250
- — C (W) $28000
- — Z (W) $28000
1926.760 A01
- Issued
- Jul 9, 2015
- Abate by
- Jul 15, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.760(a)(1): 29 CFR 1926.760(a)(1): Except as provided by paragraph (a)(3) of this section, each employee engaged in a steel erection activity who was on a walking/working surface with an unprotected side or edge more than 15 feet* (4.6m) above a lower level was not protected from fall hazards by guardrail systems, safety net systems, personal fall arrest systems, positioning device systems or fall restraint systems: a. On or about January 16, 2015, two employees were exposed to fall hazard of 41 feet to the ground while landing bundles of metal decking throughout the roof (in between Lines A&B and Lines 1&2) .. b. On or about January 16, 2015, two employees were exposed to fall hazards of 41 feet while spreading bar joists throughout the roof (in between Lines A&B and Lines 1&2). c. On or about January 20, 2015, two employees were exposed to a fall hazard of 22 feet while spreading bar joists throughout the second floor (in between Lines A&B and Lines 1&2)
Recent events (3)
- — R (S) $0
- — C (W) $0
- — Z (W) $0
1926.760 B01
- Issued
- Jul 9, 2015
- Abate by
- Jul 15, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.760(b)(1): Each connector was not protected in accordance with paragraphe (a)(1) of this section from fall hazards of more than two stories or 30 feet (9.1 m) above a lower level, whichever is less. (a) Jobsite On or about January 16, 2015, two employees were exposed to a fall hazard of up to 41 feet while working with the crane to connect structural steel beams without the use of fall protection.
Recent events (3)
- — R (S) $0
- — C (W) $0
- — Z (W) $0
1926.755 A01
- Issued
- Jul 9, 2015
- Abate by
- Jul 15, 2015
- Penalty
- Initial $22,000 · Current $5,000 Reduced
General-duty citation text
29 CFR 1926.755(a)(1): Columns were not anchored by a minimum of four anchor bolts. (a) Jobsite - Structural column at Line 1A only had two anchor bolts with washers and nuts tightened down. (b) Jobsite - Structural column at Line 1B only had two anchor bolts with washers and nuts tightened down. (c) Jobsite - Structural column at Line 1C only had two anchor bolts with washers and nuts tightened down. (d) Jobsite - Structural column at Line 1D only had two anchor bolts with washers and nuts tightened down. (e) Jobsite - Structural column at Line 2A only had two anchor bolts with washers and nuts tightened down. (f) Jobsite - Structural column at Line 2B only had two anchor bolts with washers and nuts tightened down. (g) Jobsite - Structural column at Line 2C only had two anchor bolts with washers and nuts tightened down. (h) Jobsite - Structural column at Line 2D only had two anchor bolts with washers and nuts tightened down. (i) Jobsite - Structural column at Line 3A only had two anchor bolts with washers and nuts tightened down. (j) Jobsite - Structural column at Line 3B only had two anchor bolts with washers and nuts tightened down. (k) Jobsite - Structural column at Line 4C only had two anchor bolts with washers and nuts tightened down. (l) Jobsite - Structural column at Line 4D only had two anchor bolts with washers and nuts tightened down.
Recent events (3)
- — R (W) $5000
- — C (W) $22000
- — Z (W) $22000
1926.757 B03
- Issued
- Jul 9, 2015
- Abate by
- Jul 15, 2015
- Penalty
- Initial $28,000 · Current $5,000 Reduced
General-duty citation text
29 CFR 1926.757(b)(3): Each steel joist were not be attached to the support structure, at least at one end on both sides of the seat, immediately upon placement in the final erection position and before additional joists are placed. (a) Second Floor Between 2 Line & 3 Line and between A Line & B Line there were sixteen bar joist which were not secured to prevent unintentional displacement. (b) Second Floor Between 3 Line & 4 Line and between A Line & B Line there were fourteen bar joist which were not secured to prevent unintentional displacement. (c) Second Floor Between 4 Line & 5 Line and between A Line & B Line there were thirteen bar joist which were not secured to prevent unintentional displacement. (d) Second Floor Between 4 Line & 5 Line and between B Line & C Line there were thirteen bar joist which were not secured to prevent unintentional displacement. (e) Second Floor Between 4 Line & 5 Line and between C Line & D Line there were thirteen bar joist which were not secured to prevent unintentional displacement. (f) Second Floor Between 4 Line & 5 Line and between D Line & E Line there were twelve bar joist which were not secured to prevent unintentional displacement. (g) Second Floor Between 5 Line & 6.3 Line and between B Line & C Line there were fifteen bar joist which were not secured to prevent unintentional displacement. (h) Second Floor Between 5 Line & 6.9 Line and between C Line & D Line there were twenty four bar joist which were not secured to prevent unintentional displacement. (i) Roof Between 1 Line & 2 Line and between A Line & B Line there were four bar joist which were not secured to prevent unintentional displacement. (j) Roof Between 1 Line & 2 Line and between B Line & C Line there were five bar joist which were not secured to prevent unintentional displacement. (k) Roof Between 2 Line & 3 Line and between B Line & C Line there were six bar joist which were not secured to prevent unintentional displacement. (l) Roof Between 3 Line & 4 Line and between A Line & B Line there were six bar joist which were not secured to prevent unintentional displacement. (m) Roof Between 3 Line & 4 Line and between B Line & C Line there were six bar joist which were not secured to prevent unintentional displacement. (n) Roof Between 4 Line & 5.7 Line and between A Line & B Line there were nine bar joist which were not secured to prevent unintentional displacement. (o) Roof Between 4 Line & 5 Line and between C Line & D Line there were five bar joist which were not secured to prevent unintentional displacement. (p) Roof Between 4 Line & 5 Line and between E Line & G Line there were five bar joist which were not secured to prevent unintentional displacement. (q) Roof Between 5 Line & 6 Line and between D Line & E Line there were five bar joist which were not secured to prevent unintentional displacement. (r) Roof Between 5 Line & 6 Line and between E Line & G Line there were five bar joist which were not secured to prevent unintentional displacement. (s) Roof Between 6 Line & 7 Line and between C Line & D Line there were four bar joist which were not secured to prevent unintentional displacement. (t) Roof Between 6 Line & 7 Line and between D Line & E Line there were five bar joist which were not secured to prevent unintentional displacement. (u) Roof Between 6 Line & 7 Line and between E Line & G Line there were five bar joist which were not secured to prevent unintentional displacement.
Recent events (3)
- — R (W) $5000
- — C (W) $28000
- — Z (W) $28000
More inspections in this industry (NAICS 238120)
More inspections in NH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340190727.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.