Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: NATIONAL WIRE & METAL TECHNOLOGIES, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of NATIONAL WIRE & METAL TECHNOLOGIES, INC. in 200 HARRISON STREET, JAMESTOWN, NY 14701 (NAICS 332116). OSHA activity number 340196724.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch National Wire & Metal Technologies, INC. — free Get an email when a new federal OSHA severe-injury report for National Wire & Metal Technologies, INC. is published. One employer, no account, unsubscribe in one click.
Site address
200 HARRISON STREET
City
JAMESTOWN
State
NY
ZIP
14701
Mailing
200 HARRISON STREET, JAMESTOWN, NY 14701
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332116
Employees
19
Ownership type
A

5 citations on file for this inspection.

1910.147 D04 I

Serious Gravity 5 1 instance 1 exposed
Issued
Apr 1, 2015
Abate by
May 29, 2015
Penalty
Initial $1,700 · Current $1,275 Reduced
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees:    a) On or about 03/25/2015, in the press department; where locks were not applied to energy isolating devices(disconnect switches) during die-setting operations.    ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • — I (S) $1275
  • — Z (S) $1700

1910.217 B07 III

Serious Gravity 5 1 instance 1 exposed
Issued
Apr 1, 2015
Abate by
May 29, 2015
Penalty
Initial $1,700 · Current $1,275 Reduced
29 CFR 1910.217(b)(7)(iii): Mechanical power press(es) using part revolution clutches were not provided with a means of selecting off, inch, single stroke, and continuous (when the continuous function was furnished) which was capable of being supervised by the employer:    a) On or about 03/25/2015, in the press room; where the Perkins Machine Company, Model 6-H 75 ton mechanical power press ("press #6" - serial #32068) was equipped with a standard duty 3-position, maintained knob, selector switch which was not capable of being supervised.    ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • — I (S) $1275
  • — Z (S) $1700

1910.217 B07 V A

Serious Gravity 5 1 instance 1 exposed
Issued
Apr 1, 2015
Abate by
May 29, 2015
Penalty
Initial $1,700 · Current $1,275 Reduced
29 CFR 1910.217(b)(7)(v)(a): Each two-hand control for single stroke operations on mechanical power press(es) using part revolution clutches was not protected against unintended operation:    a) On or about 03/25/2015 in the press department; where the two-hand controls for the L&J Press Corp. No. 60, a 60 ton mechanical power press (serial #56563A), were not protected.    ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • — I (S) $1275
  • — Z (S) $1700

1910.217 B07 VIII

Serious Gravity 5 2 instances 1 exposed
Issued
Apr 1, 2015
Abate by
May 29, 2015
Penalty
Initial $1,700 · Current $1,275 Reduced
29 CFR 1910.217(b)(7)(viii): Mechanical power press(es) using part revolution clutches, with clutch/brake control systems which contained both single and continuous functions, were not designed so that in order to initiate a continuous run, a prior action (in addition to the selection of Continuous on the stroking selector) was required before actuation of the operating means would result in continuous stroking:    a) On or about 03/25/2015, in the press department; where the control panel on the Perkins Machine Company, Model 6-H 75 ton mechanical power press ("press #6" - serial #32068) was not equipped with a prior action button.    b) On or about 03/25/2015, in the press department; where most of the buttons/switches/controls, on the control panel, on the Minster P2-75-42 75 ton mechanical power press ("press #5 - serial #P2-75-13131) were not required to run the press. Simply turning the press "on/off" control switch from "off" to "on" resulted in continuous stroking of the press.    ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • — I (S) $1275
  • — Z (S) $1700

1910.217 E03

Serious Gravity 5 1 instance 1 exposed
Issued
Apr 1, 2015
Abate by
May 29, 2015
Penalty
Initial $1,700 · Current $1,275 Reduced
29 CFR 1910.217(e)(3): The employer did not insure the original and continuing competence of personnel caring for, inspecting, and maintaining mechanical power press(es):    a) On or about 03/25/2015 throughout the press department; where multiple deficiencies on mechanical power presses were observed.    ABATEMENT CERTIFICATION REQIURED
Recent events (2)
  • — I (S) $1275
  • — Z (S) $1700

View National Wire & Metal Technologies, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340196724.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.