OSHA Inspection: SOUTHCROSS ENERGY PARTNERS GP, LLC

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of SOUTHCROSS ENERGY PARTNERS GP, LLC in 5422 FM 136, GREGORY, TX 78359 (NAICS 221210). OSHA activity number 340202472.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Southcross Energy Partners GP, LLC — free Get an email when a new federal OSHA severe-injury report for Southcross Energy Partners GP, LLC is published. One employer, no account, unsubscribe in one click.
Site address
5422 FM 136
City
GREGORY
State
TX
ZIP
78359
Mailing
5422 FM 136, GREGORY, TX 78359
Inspection type
Referral (C)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
221210
Employees
320
Ownership type
A

7 citations on file for this inspection.

1910.119 G01 I

Serious Gravity 10 1 instance 2 exposed
Issued
Jul 17, 2015
Abate by
Nov 6, 2015
Penalty
Initial $7,000 · Current $5,600 Reduced
29 CFR 1910.119(g)(1)(i): The employer did not train each employee before being involved in operating a newly assigned process in the operating procedures as specified in paragraph (f) of this section:    At this workplace, the employer did not provide adequate training to ensure facility operators were aware of the Human Machine Interface (HMI) software control and data communication changes, from the old Wonderware to the new Rockwell systems.
Recent events (2)
  • — I (S) $5600
  • — Z (S) $7000

1910.119 J02

Serious Gravity 10 3 instances 2 exposed
Issued
Jul 17, 2015
Abate by
Nov 6, 2015
Penalty
Initial $7,000 · Current $7,000
29 CFR 1910.119(j)(2): The employer did not implement written procedures to maintain the on-going integrity of process equipment:    At this workplace, the employer did not adequately implement written procedures to maintain the integrity of process equipment such as but not limited to the Emergency Shut Down (EDS) valves at:         a)  the Stedman discharge pipelines,      b)  the Copano discharge pipelines,  and      c)  the Recompressor discharge pipelines.
Recent events (2)
  • — I (S) $7000
  • — Z (S) $7000

1910.119 L01

Serious Gravity 10 2 instances 2 exposed
Issued
Jul 17, 2015
Abate by
Nov 6, 2015
Penalty
Initial $7,000 · Current $0 Reduced
29 CFR 1910.119(l)(1): The employer did not establish and implement written procedures to manage changes  to process chemicals, technology, equipment, and procedures; and, changes to facilities that affect a covered process:      Southcross Energy did not prepare management of change documents addressing the following changes which were not evaluated or documented prior to installation and operation:    a. Human Management Interface (HMI) system change from the Wonderware to the Rockwell FaceTalk software/hardware system.      b. Valve replacement at the Stedman pipeline, Copano pipeline and the Recompressor discharge pipeline.
Recent events (2)
  • — I (S) $0
  • — Z (S) $7000

1910.119 L05

Serious Gravity 10 2 instances 2 exposed
Issued
Jul 17, 2015
Abate by
Nov 6, 2015
Penalty
Initial $7,000 · Current $0 Reduced
29 CFR 1910.119(l)(5): A change covered by this paragraph resulted in a change in the operating procedures or practices required by paragraph (f) of this section, and such procedures or practices were not updated accordingly:    At this workplace, the employer did not establish or update operating procedures to ensure employees safely and accurately performed required procedures such as:    a.  Normal operations    b.  Emergency operations
Recent events (2)
  • — I (S) $0
  • — Z (S) $7000

1910.119 J04 I

Serious Gravity 10 1 instance 2 exposed
Issued
Jul 17, 2015
Abate by
Nov 6, 2015
Penalty
Initial $7,000 · Current $5,600 Reduced
29 CFR 1910.119(j)(4)(i): The employer did not perform inspections and tests on process equipment:    At this workplace the employer did not inspect and test critical process equipment such as but not limited to Emergency Shut Down (ESD) valves, and pressure relief and control valves.  Employees at this facility were exposed to fire and explosion hazards and to catastrophic release of flammable gases.
Recent events (2)
  • — I (S) $5600
  • — Z (S) $7000

1910.119 M05

Serious Gravity 10 1 instance 2 exposed
Issued
Jul 17, 2015
Abate by
Nov 6, 2015
Penalty
Initial $7,000 · Current $5,600 Reduced
29 CFR 1910.119(m)(5): The employer did not establish a system to promptly address and resolve incident report findings and recommendations. Resolutions and corrective actions were not documented:    At this workplace, the employer did not promptly address the incident report corrective actions recommendations for the natural gas liquids vapor released occurring on or about December 14, 2014 at Plant number one.
Recent events (2)
  • — I (S) $5600
  • — Z (S) $7000

1910.119 F01 I D

Repeat Gravity 10 1 instance 2 exposed
Issued
Jul 17, 2015
Abate by
Nov 6, 2015
Penalty
Initial $70,000 · Current $65,800 Reduced
29 CFR 1910.119(f)(1)(i)(D): The employer did not develop and implement written operating procedures that provide clear instructions for emergency shutdown, including the conditions under which emergency shutdown is required, and the assignment of shutdown responsibility to qualified operators to ensure that emergency shutdown is executed in a safe and timely manner:    The employer did not develop and implement written operating procedures that provided clear instructions for performing an emergency shutdown of the facility in the event of an emergency at the Gregory Plant.  The operating procedures failed to properly address the shutdown of the Steadman, Copano, and Recompressor inlet valves using the HMI system located in the control room.  Operating Procedure 005-SOP-GGPF does not include procedures for shutting down the inlet valves for the Steadman, Copano, and Recompressor.  This exposed employees to fire and explosion hazards from catastrophic release of flammable gas.
Recent events (2)
  • — I (R) $65800
  • — Z (W) $70000

View Southcross Energy Partners GP, LLC's full OSHA safety record →