Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: SNEAD CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SNEAD CONSTRUCTION in 1100 RHODE ISLAND AVE, WASHINGTON, DC 20003 (NAICS 236116). OSHA activity number 340373190.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Snead Construction — free Get an email when a new federal OSHA severe-injury report for Snead Construction is published. One employer, no account, unsubscribe in one click.
Establishment
SNEAD CONSTRUCTION
Site address
1100 RHODE ISLAND AVE
City
WASHINGTON
State
DC
ZIP
20003
Mailing
1010 WISCONSIN AVE, WASHINGTON, DC 20007
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236116
Employees
20
Ownership type
A

7 citations on file for this inspection.

1926.100 A

Serious Gravity 5 1 instance 1 exposed
Issued
Jun 12, 2015
Penalty
Initial $2,000 · Current $1,500 Reduced
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:    a) On February 6, 2015 and at times prior thereto; 2nd floor and roof area; employee was observed without head protection while installing water lines and guiding crane.
Recent events (2)
  • — I (S) $1500
  • — Z (S) $2000

1926.451 B01

Serious Gravity 10 1 instance 2 exposed
Issued
Jun 12, 2015
Abate by
Jul 1, 2015
Penalty
Initial $2,800 · Current $2,100 Reduced
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights     a) On February 6, 2015 and at times thereto; Front of building; employees had erected a single pole scaffold which was not completely planked exposing them to a 30 foot fall to ground level.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $2100
  • — Z (S) $2800

1926.451 G01 II

Serious Gravity 10 1 instance 2 exposed
Issued
Jun 12, 2015
Abate by
Jul 1, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(1)(ii): Each employee on a single-point or two-point adjustable suspension scaffold was not protected by both a personal fall arrest system and a guardrail system:  On February 6, 2015 and at times prior thereto; front area of building; employees working a scaffold system were not protected by both a guard rail system and a full body harness exposing them to an estimated 30 foot fall to ground level.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.452 A04

Serious Gravity 10 1 instance 2 exposed
Issued
Jun 12, 2015
Abate by
Jul 1, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.452(a)(4): Diagonal bracing in both directions were not installed across the entire outside face of all double- and single-pole scaffolds.  a) On February 6, 2015 and at times prior thereto; front of building; the scaffold system that the carpenters were using did not have diagonal bracing exposing employees to an estimated 30 foot fall to ground level.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.501 B01

Serious Gravity 5 2 instances 2 exposed
Issued
Jun 12, 2015
Penalty
Initial $2,400 · Current $1,800 Reduced
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems.     a) On February 6, 2015 and at times prior thereto; roof area on elevator room; employees were conducting masonry work without fall protection exposing employees to a 10 ft. fall to the lower platform.
Recent events (2)
  • — I (S) $1800
  • — Z (S) $2400

1926.501 B13

Serious Gravity 10 3 instances 6 exposed
Issued
Jun 12, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):   a) On February 6, 2015 and at times prior thereto; throughout facility; employees framing a new residential Condo were observed walking on open platforms without fall protection in place to prevent them from falling 35 feet to ground level.     b) On February 6, 2015 and at times prior thereto; third floor front side; employee were walking through or working near wall openings without fall protection in place exposing them to 35 foot fall to ground level.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.1053 B04

Serious Gravity 5 2 instances 4 exposed
Issued
Jun 12, 2015
Penalty
Initial $2,400 · Current $1,800 Reduced
29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed:    On February 6, 2015 and at times prior thereto; throughout the site; employee was using an 8 foot step ladder in the closed position while conducting framing.
Recent events (2)
  • — I (S) $1800
  • — Z (S) $2400

View Snead Construction's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340373190.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.