Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: D.G. YUENGLING & SON, INC.

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of D.G. YUENGLING & SON, INC. in 310 MILL CREEK AVENUE, POTTSVILLE, PA 17901 (NAICS 312120). OSHA activity number 340430347.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch D.G. Yuengling & SON, INC. — free Get an email when a new federal OSHA severe-injury report for D.G. Yuengling & SON, INC. is published. One employer, no account, unsubscribe in one click.
Site address
310 MILL CREEK AVENUE
City
POTTSVILLE
State
PA
ZIP
17901
Mailing
310 MILL CREEK AVENUE, POTTSVILLE, PA 17901
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
312120
Employees
170
Ownership type
A

5 citations on file for this inspection.

1910.119 D03 I D

Serious Gravity 5 1 instance 50 exposed
Issued
Aug 24, 2015
Abate by
Oct 30, 2015
Penalty
Initial $4,250 · Current $1,000 Reduced

Hazardous substances 0170

29 CFR 1910.119(d)(3)(i)(D) Process safety information did not include relief system design and design basis:    a) Mahantango Site, process safety information did not contain relief system design and design basis for the ammonia high pressure receiver on top of the ammonia / carbon dioxide engine room, on or about June 18, 2015.      ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $1000
  • — Z (S) $4250

1910.119 D03 II

Serious Gravity 5 1 instance 50 exposed
Issued
Aug 24, 2015
Abate by
Oct 30, 2015
Penalty
Initial $4,250 · Current $4,250

Hazardous substances 0170

29 CFR 1910.119(d)(3)(ii) The employer did not document that equipment complies with recognized and generally accepted good engineering practices:    a)Mahantango Site, main ammonia engine room, the door leading from the engine room interior to the operator control room was not self closing and the employer did not document that the equipment complied with recognized and generally accepted good engineering practices, on or about June 18, 2015.      b)Mahantango Site, main ammonia engine room, a household window air conditioner was mounted in the wall between the engine room and the operator control room and directed engine room air directly into the control room and the employer did not document that the equipment complied with recognized and generally accepted good engineering practices, on or about June 18, 2015.      c) Mahantango Site, O Cellar, two tube and shell heat exchangers were located in an occupied process and production area and an ammonia detection system was not installed to provide employees with an early warning in the event of a leak, on or about June 18, 2015.        ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $4250
  • — Z (S) $4250

1910.119 J04 II

Serious Gravity 5 1 instance 50 exposed
Issued
Aug 24, 2015
Abate by
Oct 30, 2015
Penalty
Initial $4,250 · Current $4,250

Hazardous substances 0170

29 CFR 1910.119(j)(4)(ii) Inspection and testing procedures shall follow recognized and generally accepted good engineering practices:    a)Mahantango Site, O Cellar, the ammonia to glycol tube and shell heat exchanger had distorted/broken outer aluminum jacket, disturbed insulation, ice deposits, and the employer did not document that the inspection and testing procedures complied with recognized and generally accepted good engineering practices, on or about June 18, 2015.    b)Mahantango Site, ammonia / carbon dioxide engine room, piping and appurtenances to the ammonia to glycol heat exchanger had missing insulation, visible corrosion, ice deposits, and the employer did not document that the inspection and testing procedures complied with recognized and generally accepted good engineering practices, on or about June 18, 2015.    c)Mahantango Site, main ammonia engine room, compressor #5 ammonia had an inlet elbow assembly which had no insulation, ice deposits, and the employer did not document that the inspection and testing procedures complied with recognized and generally accepted good engineering practices, on or about June 18, 2015.    d)Mahantango Site, main ammonia engine room, piping and tee as part of the pump receiver vessel installation which was located adjacent to compressor #6 had missing insulation, ice deposits, and the employer did not document that the inspection and testing procedures complied with recognized and generally accepted good engineering practices, on or about June 18, 2015.    ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $4250
  • — Z (S) $4250

1910.119 E03 I

Deleted Serious Gravity 5 1 instance 50 exposed
Issued
Aug 24, 2015
Abate by
Sep 26, 2015
Penalty
Initial $4,250 · Current $0 Reduced

Hazardous substances 0170

29 CFR 1910.119(e)(3)(i) The process hazard analysis did not address the hazards of the process:    a) Mahantango Site, the process hazard analysis did not address the effects of fire and heat on the high pressure ammonia receiver on top of the ammonia / carbon dioxide engine room, on or about June 18, 2015.  ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $0
  • — Z (S) $4250

1910.119 L01

Serious Gravity 5 1 instance 50 exposed
Issued
Aug 24, 2015
Abate by
Oct 30, 2015
Penalty
Initial $4,250 · Current $4,250

Hazardous substances 0170

29 CFR 1910.119(l)(1): The employer did not establish written procedures to manage changes to process chemicals, technology, equipment, and procedures, and changes to facilities that affect a covered process:    a)Mill Creek Site, an electrical generator set, powered by a methane fueled internal combustion engine, was installed near the anhydrous ammonia engine room, and the changes  to the process and equipment, were not addressed, on or about, February 27, 2015.    b)Mahantango Site, O Cellar, piping and appurtenances to a tube and shell heat exchanger were changed from a motorized and remotely controlled valve to a manual valve and the changes  to the process and equipment were not addressed, on or about, June 18, 2015.    c)Mahantango Site, main ammonia engine room, a new compressor was added to the system and the changes  to the process and equipment were not addressed, on or about, June 18, 2015.    d)Mahantango Site, a new condenser was added to the system and the changes  to the process and equipment were not addressed, on or about, June 18, 2015.    ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $4250
  • — Z (S) $4250

View D.G. Yuengling & SON, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340430347.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.