OSHA Inspection: CLARK CONSTRUCTION

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of CLARK CONSTRUCTION in 800 MAINE AVENUE, SW, WASHINGTON, DC 20005 (NAICS 236220). OSHA activity number 340440676.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Clark Construction — free Get an email when a new federal OSHA severe-injury report for Clark Construction is published. One employer, no account, unsubscribe in one click.
Establishment
CLARK CONSTRUCTION
Site address
800 MAINE AVENUE, SW
City
WASHINGTON
State
DC
ZIP
20005
Mailing
7500 OLD GEORGETOWN RD, BETHESDA, MD 20814
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
100
Ownership type
A

1 citation on file for this inspection.

1926.1101 D05

Other-than-serious 1 instance 100 exposed
Issued
Sep 2, 2015
Abate by
Sep 9, 2015
Penalty
Initial $5,000 · Current $5,000

Hazardous substances 9954

29 CFR 1926.1101(d)(5): As supervisor of the entire project, the general contractor did not ascertain whether the asbestos contractor was in compliance with the asbestos standard, and did not require such contractor to come into compliance with this standard:    (a)  The Wharf - Southwest Waterfront - On or about March 3, 2015, the demolition subcontractor, The Anderson Company's workers were digging up, breaking up and removing cement pipes, encased in a concrete wall, containing 30 percent to 45 percent Chrysotile asbestos and the general contractor did not ensure that this operation was conducted in compliance with a Class II asbestos work operation.    (b) The Wharf - Southwest Waterfront - On or about March 3, 2015, the asbestos contractor, GOEL Services' workers, lined roll off containers, inspected the asbestos containing material being loaded in the containers  and did not insure that the material had been kept wet until it had been loaded for transport away from the demolition site.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
  • — I (O) $5000
  • — Z (S) $5000

View Clark Construction's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340440676.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.