OSHA Inspection: PROGRESSIVE MACHINE & DESIGN, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PROGRESSIVE MACHINE & DESIGN, LLC in 767 RAWLEY DRIVE, VICTOR, NY 14564 (NAICS 333249). OSHA activity number 340443894.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Progressive Machine & Design, LLC — free Get an email when a new federal OSHA severe-injury report for Progressive Machine & Design, LLC is published. One employer, no account, unsubscribe in one click.
Site address
767 RAWLEY DRIVE
City
VICTOR
State
NY
ZIP
14564
Mailing
727 RAWLEY DRIVE, VICTOR, NY 14564
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
333249
Employees
150
Ownership type
A

6 citations on file for this inspection.

1910.157 G02

Serious Gravity 1 1 instance 34 exposed
Issued
Apr 7, 2015
Abate by
May 10, 2015
Penalty
Initial $2,295 · Current $1,607 Reduced
29 CFR 1910.157(g)(2): The educational program to familiarize employees with the general principles of fire extinguisher use and the hazards involved with incipient stage fire fighting was not provided to all employees upon initial employment, and at least annually thereafter:    a)  Progressive Machine & Design, LLC, on or about 3/5/15:  The employer did not provide fire extinguisher use training to employees upon initial employment and annually thereafter.         * ABATEMENT NOTE:  By this date the employer must either correct the alleged violation or implement a Fire Safety Policy; as outlined in 29 CFR 1910.38(a) and .39(a) which includes the evacuation requirements of 29 CFR 1910.157(b).
Recent events (2)
  • — I (S) $1606.5
  • — Z (S) $2295

1910.212 A01

Serious Gravity 5 10 instances 10 exposed
Issued
Apr 7, 2015
Abate by
May 10, 2015
Penalty
Initial $3,060 · Current $2,142 Reduced
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks:    a)  Machine Assembly Tool Room, on or about 3/5/15:  Bridgeport vertical milling machine was not provided with a guard to cover the rotating chuck and tool.    b)  Machine Assembly Tool Room, on or about 3/5/15:  Chevalier vertical milling machine was not provided with a guard to cover the rotating chuck and tool.    c)  Machine Assembly Tool Room, on or about 3/5/15:  Cumins drill press was not provided with a guard to cover the rotating chuck and tool.    d)  Boring Mill Area, on or about 3/5/15:  Two (2) DeVLieg horizontal milling machines were not provided with a guard to cover the rotating chuck and tool.    e) Fabrication Tool Room, on or about 3/5/15:  Three (3) Bridgeport milling machines were used without a guard to cover the rotating chuck and tool.    f)  Fabrication Tool Room, on or about 3/5/15:  Hwacheon lathe was used without a guard to cover the rotating chuck.    g)  Water Jet Area, on or about 3/5/15:  Ridgid drill press was used without a guard to cover the rotating chuck and tool.
Recent events (2)
  • — I (S) $2142
  • — Z (S) $3060

1910.242 B

Serious Gravity 1 2 instances 10 exposed
Issued
Apr 7, 2015
Abate by
Apr 15, 2015
Penalty
Initial $2,295 · Current $1,607 Reduced
29 CFR 1910.242(b): Compressed air used for cleaning purposes was not reduced to less than 30 p.s.i.:      a)  Fabrication Tool Room, on or about 3/5/15:  Two (2) compressed air nozzles were being used at 70 p.s.i. for cleaning purposes.
Recent events (2)
  • — I (S) $1606.5
  • — Z (S) $2295

1910.1200 H01

Serious Gravity 1 1 instance 34 exposed
Issued
Apr 7, 2015
Abate by
May 10, 2015
Penalty
Initial $2,295 · Current $1,607 Reduced
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area:       a)  Progressive Machine & Design, LLC., on or about 3/5/15:  Employees were not  provided with information and training on hazardous chemicals at the time of their initial assignment.
Recent events (2)
  • — I (S) $1606.5
  • — Z (S) $2295

1910.1200 H03 IV

Serious Gravity 1 1 instance 44 exposed
Issued
Apr 7, 2015
Abate by
May 10, 2015
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(h)(3)(iv):   The details of the hazard communication program developed by the employer, did not include an explanation of the labels received on shipped containers and the workplace labeling system used by their employer; the safety data sheet, including the order of information and how employee could obtain and use the appropriate hazard information:    a)  Progressive Machine & Design, LLC., on or about 3/5/15:  Employees were not  provided with training that included an explanation of the new labels received on shipped containers and the new order of information on the safety data sheets.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1904.7 A

Other-than-serious 4 instances 4 exposed
Issued
Apr 7, 2015
Penalty
Initial $0 · Current $0
29 CFR 1904.7(a):  The employer did not record workplace injuries and illnesses that would be considered to meet the general recording criteria, and therefore to be recordable, if it results in any of the following: death, days away from work, restricted work or transfer to another job, medical treatment beyond first aid, or loss of consciousness.   a)  Progressive Machine & Design, LLC, on or about 3/5/15:   The employer did not record the following workplace injuries that met the general recording criteria during calendar year 2014:      1.    On 11/18/14 an employee sustained a left elbow laceration that resulted in sutures.      2.    On 11/17/14 an employee sustained a right knee sprain and was placed on restricted duty for 14 days.  b)  Progressive Machine & Design, LLC, on or about 3/5/15:  The employer did not record the following workplace injuries that met the general recording criteria during calendar year 2015:      1.    On 1/5/15 an employee injured their right wrist that resulted in medical treatment, i.e. brace.      2.    On 2/12/15 an employee sustained a low back strain that resulted in lost 3 days away from work.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View Progressive Machine & Design, LLC's full OSHA safety record →