OSHA Inspection: GOMEZ MASONRY

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of GOMEZ MASONRY in 4202 TRANSIT DRIVE, COLUMBUS, OH 43223 (NAICS 238140). OSHA activity number 340460724.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Gomez Masonry — free Get an email when a new federal OSHA severe-injury report for Gomez Masonry is published. One employer, no account, unsubscribe in one click.
Establishment
GOMEZ MASONRY
Site address
4202 TRANSIT DRIVE
City
COLUMBUS
State
OH
ZIP
43223
Mailing
8930 HARRISON AVE., CLEVES, OH 45002
Inspection type
Unprogrammed Other (I)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
6
Ownership type
A

5 citations on file for this inspection.

1926.51 F01

Serious Gravity 1 1 instance 6 exposed
Issued
Apr 10, 2015
Abate by
Apr 22, 2015
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.51(f)(1): The employer shall provide adequate washing facilities for employees engaged in the application of paints, coating, herbicides, or insecticides, or in other operations where contaminants may be harmful to the employees. Such facilities shall be in near proximity to the worksite and shall be so equipped as to enable employees to remove such substances.  a.     On the site where employees handled hazardous materials such as mortar which contained Portland Cement, the employer did not provide hand washing facilities for employees to rinse thereby exposing employees to a contact hazard.
Recent events (2)
  • — I (S) $1200
  • — Z (S) $1200

1926.451 B01 I

Serious Gravity 5 1 instance 3 exposed
Issued
Apr 10, 2015
Abate by
Apr 22, 2015
Penalty
Initial $2,000 · Current $320 Reduced
29 CFR 1926.451(b)(1)(i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform).  a.     On the fourth level where employees built a scaffold to lay concrete block, there was a 25 inch gap to the back side of the scaffold platform thereby exposing employees to a fall hazard.
Recent events (2)
  • — I (S) $320
  • — Z (S) $2000

1926.451 F07

Serious Gravity 1 1 instance 3 exposed
Issued
Apr 10, 2015
Abate by
May 15, 2015
Penalty
Initial $1,200 · Current $480 Reduced
29 CFR 1926.451(f)(7): Scaffolds shall be erected, moved, dismantled, or altered only under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration. Such activities shall be performed only by experienced and trained employees selected for such work by the competent person.  a.     On the fourth floor where scaffold was built for employees to extend the brick up a couple rows, the employer did not have a qualified  person to supervise the erection and ensure the scaffold was built correctly thereby exposing employees to a fall hazard.
Recent events (2)
  • — I (S) $480
  • — Z (S) $1200

1926.454 B

Serious Gravity 5 1 instance 3 exposed
Issued
Apr 10, 2015
Abate by
May 15, 2015
Penalty
Initial $1,600 · Current $400 Reduced
29 CFR 1926.454(b): The employer shall have each employee who is involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question. The training shall include the following topics, as applicable:    29 CFR 1926.454(b)(2): The correct procedures for erecting, disassembling, moving, operating, repairing, inspecting, and maintaining the type of scaffold in question;    a.     On the fourth level where masons were going to lay a couple rows of concrete block, the employer did not train the employees who were erecting the scaffold in the proper way to erect the scaffold so employees would not be exposed to a fall hazard.
Recent events (2)
  • — I (S) $400
  • — Z (S) $1600

1910.1200 H03 IV

Deleted Other-than-serious 1 instance 6 exposed
Issued
Apr 10, 2015
Abate by
May 15, 2015
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(h)(3)(iv): The details of the hazard communication program developed by the employer, including an explanation of the labels received on shipped containers and the workplace labeling system used by their employer; the safety data sheet, including the order of information and how employees can obtain and use the appropriate hazard information.  a.     On the site where chemicals such as Portland Cement were used as part of the mortar mix, the employer did not provide hazard communication training on the hazards associated with the chemicals and the means to use to determine the Safety Data Sheets thereby exposing employees to a contact hazard.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View Gomez Masonry's full OSHA safety record →