BELLPORT, NY —
OSHA Inspection: C A SHINGLES
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of C A SHINGLES in 58 SOUTH COUNTRY ROAD, BELLPORT, NY 11713 (NAICS 238170). OSHA activity number 340467265.
Where did this inspection happen?
- Establishment
- C A SHINGLES
- Site address
- 58 SOUTH COUNTRY ROAD
- City
- BELLPORT
- State
- NY
- ZIP
- 11713
- Mailing
- 31 MILLDOWN ROAD, YAPHANK, NY 11980
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238170
- Employees
- 4
- Ownership type
- A
Citations
8 citations on file for this inspection.
1926.95 A
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $2800.00
General-duty citation text
29 CFR 1926.95(a): Protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, were not provided and used: (a) 58 South Country Road, Bellport, NY (Worksite), north of home - An employee installing cedar shake shingle siding with a Bostitch pneumatic nail gun, Model # N66C / Serial # Unknown, was not provided with; or using any form of eye protection on, or about March 16, 2015. (b) Worksite, south side of home - Two employees installing cedar shake shingle siding with Bostitch pneumatic nail guns, Model # N66C-1 / Serial # 14062140H BK and Model # N66C / Serial # 165355, were not provided with; or using any form of eye protection on, or about March 16, 2015. (c) Worksite, north side of home - An employee cross cutting cedar shake shingle siding with the Skilsaw table saw, Model # 3310 / Serial # 201, was not provided with; or using any form of eye protection on, or about March 16, 2015. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this violation in accordance with 29 CFR 1903.19.
Recent events (3)
- — D (S) $2800
- — C (S) $2800
- — Z (S) $2800
1926.304 H01
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $2800.00
General-duty citation text
29 CFR 1926.304(h)(1): Each circular crosscut table saw was not guarded by a hood which completely enclosed that portion of the saw blade above the table and that portion of the saw above the material being cut: (a) Worksite, north side of home - An employee cross cutting cedar shake siding was operating the Skilsaw table saw, Model # 3310 / Serial # 201, which was not equipped with a hood guard that enclosed the saw blade above the table; and the material being cut on, or about March 16, 2015. Note 1: In addition to abatement certification, the employer is required to submit abatement documentation for this violation, in accordance with 29 CFR 1903.19. Note 2: See paragraph (i)(1) of this section for additional requirements for hand-fed crosscut table saws.
Recent events (3)
- — D (S) $2800
- — C (S) $2800
- — Z (S) $2800
1926.451 F03
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $2800.00
General-duty citation text
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: (a) Worksite, north side of home - An employee installed cedar shake shingle siding from the Alum-A-Pole pump jack scaffold, Model # Pro-Jack, which had visible deficiencies such as, but not limited to the pole bottoms not being braced or secured; and lacked a form of fall protection. The scaffold was not inspected by a competent person before the work shift on, or about March 16, 2015. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this violation, in accordance with 29 CFR 1903.19.
Recent events (3)
- — D (S) $2800
- — C (S) $2800
- — Z (S) $2800
1926.451 F07
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person. (a) Worksite, north side of home - A competent person did not direct and supervise the employees who erected, disassembled, and moved the Alum-A Pole pump jack scaffold, Model # Pro-Jack, along the north side of the home. The scaffold was erected multiple times without bracing or securing the pole bottoms to prevent them from being displaced; and without any form of fall protection on, or about March 16, 2015. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this violation, in accordance with 29 CFR 1903.19.
Recent events (3)
- — D (S) $0
- — C (S) $0
- — Z (S) $0
1926.454 A
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. (a) Worksite, north side of home - An employee installed cedar shake shingle siding from the Alum-A-Pole pump jack scaffold, Model # Pro-Jack, which had visible deficiencies such as, but not limited to the pole bottoms not being braced or secured; and lacked a form of fall protection. The employee was working at a height of 12'-11" and was not trained by a qualified person to recognize the hazards associated with working from scaffolds; or in the procedures to control or minimize those hazards on, or about March 16, 2015. Note: The employer is required to submit abatement certification for this violation, in accordance with 29 CFR 1903.19.
Recent events (3)
- — D (S) $0
- — C (S) $0
- — Z (S) $0
1926.454 B
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question. (a) Worksite, north side of home - Employees erected, disassembled, and moved the Alum-A Pole pump jack scaffold, Model # Pro-Jack, which had visible deficiencies such as, but not limited to the pole bottoms not being braced or secured; and lacked a form of fall protection. The employees were not trained by a competent person to recognize the hazards associated with erecting, disassembling, or moving scaffolds on, or about March 16, 2015. Note: The employer is required to submit abatement certification for this violation, in accordance with 29 CFR 1903.19.
Recent events (3)
- — D (S) $0
- — C (S) $0
- — Z (S) $0
1926.451 G01 VII
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $2800.00
General-duty citation text
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. (a) Worksite, north side of home - An employee was installing cedar shake shingle siding from the Alum-A-Pole pump jack scaffold, Model # Pro-Jack, at a height of 12'-11", without any form of fall protection on, or about March 16, 2015. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this violation, in accordance with 29 CFR 1903.19.
Recent events (3)
- — D (S) $2800
- — C (S) $2800
- — Z (S) $2800
1926.452 J02
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $2800.00
General-duty citation text
29 CFR 1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. (a) Worksite, north side of home - An employee was installing cedar shake shingle siding from the Alum-A-Pole pump jack scaffold, Model # Pro-Jack, which did not have the pole bottoms braced or secured to prevent them from being displaced on, or about March 16, 2015. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this violation, in accordance with 29 CFR 1903.19.
Recent events (3)
- — D (S) $2800
- — C (S) $2800
- — Z (S) $2800
More inspections in this industry (NAICS 238170)
OXFORD, OH—2026-07-13
R&R SIDING LLC
WINSTON SALEM, NC—2026-07-10
161522 - MS SIDING LLC
SLINGER, WI—2026-07-10
DYLAN MATTHEW SHELLEY LLC
WINSTON SALEM, NC—2026-07-09
161514 - ALPHA OMEGA CONSTRUCTION GROUP, INC
ATLANTA, GA—2026-07-09
ESV CONSTRUCTION LLC
More inspections in NY
POUGHKEEPSIE, NY—2026-07-13
MARCO BOARD HOUSE, INC.
CORTLANDT MANOR, NY—2026-07-13
LG BUILDERS INC.
CORTLANDT MANOR, NY—2026-07-13
RJW RENOVATIONS, LLC
HEMPSTEAD, NY—2026-07-13
NYSDOCCS NASSAU AREA OFFICE
NIAGARA FALLS, NY—2026-07-10
NTVI FEDERAL INC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340467265.