SELLERSVILLE, PA ·
OSHA Inspection: ED CONOLLY GENERAL CONTRACTOR, INC.
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of ED CONOLLY GENERAL CONTRACTOR, INC. in 136 N. MAIN ST., SELLERSVILLE, PA 18960 (NAICS 236220). OSHA activity number 340566991.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ED CONOLLY GENERAL CONTRACTOR, INC.
- Site address
- 136 N. MAIN ST.
- City
- SELLERSVILLE
- State
- PA
- ZIP
- 18960
- Mailing
- 2360 BRICK TAVERN RD, QUAKERTOWN, PA 18951
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 2
- Ownership type
- Private (A)
Citations
3 citations on file for this inspection.
1926.451 G01
- Issued
- Jun 8, 2015
- Abate by
- Jun 16, 2015
- Penalty
- Initial $2,800 · Current $1,960 Reduced
General-duty citation text
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section: a) Ed Conolly General Contractor - 136 N. Main St., Sellersville, PA - An employee was exposed to fall hazards of approximately 13 feet while working from a scaffold ladder platform removing building material from an existing roof eave, on or about April 15, 2015. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
- · I (S) $1960
- · Z (S) $2800
1926.501 B01
- Issued
- Jun 8, 2015
- Abate by
- Jun 26, 2015
- Penalty
- Initial $2,000 · Current $1,400 Reduced
General-duty citation text
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems. a) Ed Conolly General Contractor - 136 N. Main St., Sellersville, PA - On or about April 15, 2015, employees were working on a walking working surface with an unprotected edge approximately 10 feet above grade without a fall protection system in place, exposing the employees to fall hazards . Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $1400
- · Z (S) $2000
1926.1053 B01
- Issued
- Jun 8, 2015
- Abate by
- Jun 16, 2015
- Penalty
- Initial $1,600 · Current $1,120 Reduced
General-duty citation text
29 CFR 1926.1053(b)(1): Portable ladders were used for access to an upper landing surface and the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface to which the ladder was used to gain access: a) Ed Conolly General Contractor - 136 N. Main St., Sellersville, PA - On or about April 15, 2015, employees were using an extension ladder to access a landing and the extension ladder did not extend 3 feet above the upper landing surface as required, exposing employees to fall hazards. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $1120
- · Z (S) $1600
More inspections in this industry (NAICS 236220)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 340566991.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.