WASHINGTON, DC —
OSHA Inspection: 316 49TH ST LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of 316 49TH ST LLC in 4719 DIX PL NE, WASHINGTON, DC 20009 (NAICS 236115). OSHA activity number 340568492.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- 316 49TH ST LLC
- Site address
- 4719 DIX PL NE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20009
- Mailing
- 1407 IVYWOOD AVE, LANDOVER, MD 20785
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236115
- Employees
- 6
- Ownership type
- A
Citations
1 citation on file for this inspection.
1926.501 B13
- Issued
- Jun 8, 2015
- Abate by
- Jun 12, 2015
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) Front , Left Side of Structure - Worker straddling the top plate was reaching out of the structure to nail plywood to the A frame not protected from falling 25' to the ground below, on or about 4/17/15. b) Front Right, Second Floor Level - Worker standing at the edge of the structure was measuring and leveling a wood wall frame not protected from falling approximately 15' to the ground and scrap materials below, on or about 4/17/15. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
- — Z (S) $2800
More inspections in this industry (NAICS 236115)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340568492.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.