Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: RINO CONSTRUCTION GROUP, INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of RINO CONSTRUCTION GROUP, INC. in 7070 CARPENTER RD., SKOKIE, IL 60077 (NAICS 238140). OSHA activity number 340574201.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Rino Construction Group, INC. — free Get an email when a new federal OSHA severe-injury report for Rino Construction Group, INC. is published. One employer, no account, unsubscribe in one click.
Site address
7070 CARPENTER RD.
City
SKOKIE
State
IL
ZIP
60077
Mailing
8975 S. WOLF RD., WILLOWBROOK, IL 60527
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
2
Ownership type
A

6 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Nov 18, 2015
Abate by
Dec 22, 2015
Penalty
Initial $400 · Current $400
29 CFR 1903.19(c)(1):  The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:     Rino Construction Group, Inc., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:     Citation Number                       Item Number                            Abatement Date  01                                            01a                                            08/18/2015  01                                            01b                                            08/18/2015  01                                            01c                                            08/18/2015  01                                            02                                              08/18/2015 01                                            03                                              08/18/2015     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $400

1926.20 B01

Serious Gravity 10 1 instance 2 exposed
Issued
Aug 6, 2015
Abate by
Aug 18, 2015
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.20(b)(1):  The employer did not initiate or maintain an accident prevention program(s) as may be necessary to comply with this part:   a)  On or about April 22, 2015, the employer did not maintain programs to provide for compliance with the OSH Act to control or minimize the safety and health hazards associated with masonry work that his employees are required to perform.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $2800

1926.20 B02

Serious Gravity 10 1 instance 2 exposed
Issued
Aug 6, 2015
Abate by
Aug 18, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s):  a)  On or about April 22, 2015, the employer did not initiate a program which provided for frequent and regular inspections of the job site by a competent person.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.454 A

Serious Gravity 10 1 instance 2 exposed
Issued
Aug 6, 2015
Abate by
Aug 18, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.454(a):  The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:    a)  On or about April 22, 2015, employees were not trained to recognize and eliminate the hazards associated with working from scaffolding.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 E01

Serious Gravity 5 1 instance 2 exposed
Issued
Aug 6, 2015
Abate by
Aug 18, 2015
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(e)(1): Safe access was not provided to scaffold platforms when the platforms were more than 2 feet above or below the point of access:    a) On or about April 22, 2015, employees accessed tubular welded frame scaffold platforms up to approximately 14 feet above the ground by climbing the ends of the scaffold frames that were not designed for such use.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $2000

1926.451 G01

Serious Gravity 10 1 instance 2 exposed
Issued
Aug 6, 2015
Abate by
Aug 18, 2015
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(g)(1):  Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level:    a)  On or about April 22, 2015, employees working from frame scaffolding were exposed to fall hazards of approximately 14 feet.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $2800

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340574201.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.