OSHA Inspection: MARTIN OPERATING PARTNERSHIP LLP

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of MARTIN OPERATING PARTNERSHIP LLP in #1 GULF STATES ROAD, BEAUMONT, TX 77704 (NAICS 325311). OSHA activity number 340610815.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Martin Operating Partnership LLP — free Get an email when a new federal OSHA severe-injury report for Martin Operating Partnership LLP is published. One employer, no account, unsubscribe in one click.
Site address
#1 GULF STATES ROAD
City
BEAUMONT
State
TX
ZIP
77704
Mailing
P.O. BOX 6567, BEAUMONT, TX 77725
Inspection type
Unprogrammed Other (I)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
325311
Employees
1200
Ownership type
A

3 citations on file for this inspection.

1910.119 D03 I B

Deleted Serious Gravity 5 16 instances 28 exposed
Issued
Oct 27, 2015
Abate by
Nov 29, 2015
Penalty
Initial $5,000 · Current $0 Reduced
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams were not accurate and did not represent equipment that was existing and was part of the process.  On May 5, 2015 and at prior times and possibly at times subsequent thereto, at the Martin Operating Partnership, L.P. Neches Terminal, in Beaumont, Texas, the employer did not ensure that the process safety information depicted in P&IDs was up-to-date and accurate for the Ammonia transfer process when:      (a) The employer P&ID NEC-02958 Rev G did not include detail to allow valves and instruments to be positively identified.      (b) The employer P&ID NEC-02962 Rev H did not provide information to represent pumps P-108B and P-108C that are part of the ammonia process.      (c) The employer P&ID NEC-02963 Rev G showed a pressure vessel PV-521 with maximum pressure of 250 psi being protected against over pressure by PSV-050 with set pressure at 270 psi.      (d) The employer P&ID NEC-02963 Rev G did not show a relief pressure for PSV-053      (e) The employer P&ID NEC-02967 Rev F did not provide accurate and complete information to represent Ammonia barge loading pumps P-106A and P-106B.      (f) The employer P&ID NEC-02968 Rev E did not include information to identify pressure vessels in the process.      (g) On the employer P&ID NEC-02969 Rev E, process safety information for V-4 is not included and several instruments on the diagram do not have identifying information.      (h) On the employer P&ID NEC-02972 Rev F, process safety information on the diagram is for equipment not represented on the diagram and there is no information on the diagram that allows identification of the PSV.      (i) On the employer P&ID NEC-02973 Rev F,  process safety information on the diagram is for equipment not represented on the diagram and there are several instruments that have no identifying detail included on the diagram.      (j) The employer P&ID NEC-02976 Rev D did not provide information to positively identify PSVs associated with the Oil Separator V-4 and Oil Cooler V-7.     (k) The employer P&ID NEC-02977 Rev D did not provide information to positively identify PSVs associated with V-5 and V-8.     (l) The employer P&ID NEC-02978 Rev D did not provide information to positively identify PSV associated with V-9.     (m) The employer P&ID NEC-02979 Rev D did not provide information to positively identify and verify the PSVs associated with V3 and does not include information to identify instruments on the diagram.     (n) The employer P&ID NEC-02982 Rev F did not provide identification numbers for several instruments in the control system for the ammonia heater.     (o) The employer P&ID NEC-02983 Rev E did not provide identification numbers for several instruments in the control system for the ammonia heater.      (p) The employer P&ID NEC-02988 Rev A did not provide identification number or relief pressure detail for the PSV shown in the diagram.
Recent events (2)
  • — I (S) $0
  • — Z (S) $5000

1910.119 J04 I

Other-than-serious 3 instances 20 exposed
Issued
Oct 27, 2015
Abate by
Feb 3, 2016
Penalty
Initial $7,000 · Current $7,000
29 CFR 1910.119(j)(4)(i): The employer did not perform inspection and tests on process equipment    On or around June 3, 2015 and at times prior and possibly at times subsequent thereto, at the Martin Operating Partnership, L.P. Neches Terminal in Beaumont, Texas the employer did not perform inspections on process equipment when:        (a) The employer did not inspect piping associated with ammonia refrigeration compressors and failed to observe that relief valves  PSV-115 and PSV-116 in the piping system were overdue for replacement.        (b) The employer allowed pressure relief valves to remain in service for more than five years in the ammonia refrigeration piping system.       .
Recent events (2)
  • — I (O) $7000
  • — Z (S) $7000

1910.119 J05

Deleted Serious Gravity 10 4 instances 20 exposed
Issued
Oct 27, 2015
Abate by
Nov 29, 2015
Penalty
Initial $7,000 · Current $0 Reduced
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that are outside acceptable limits (defined by the process safety information in paragraph (d) of this section) before further use or in a safe and timely manner when necessary means are taken to assure safe operation.  On June 3, 2015 and at prior times and possibly at times subsequent thereto, at the Martin Operating Partnership, L. P. Neches Terminal in Beaumont, Texas, the employer did not correct deficiencies in equipment that were outside acceptable limits before further use or in a safe and timely manner and did not ensure necessary means were taken to ensure safe operation of the process when:        (a) The employer allowed pressure relief valves to remain in service for more than five years in the ammonia refrigeration piping system.      (b) External coatings of piping in the ammonia transfer system were not maintained.      (C) Process valves were installed in operating piping systems but did not have handles on the valves for operation (valves cannot be operated properly to control the process without handles or valve operators installed).
Recent events (2)
  • — I (S) $0
  • — Z (S) $7000

View Martin Operating Partnership LLP's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340610815.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.