READING, PA —
OSHA Inspection: J & D SMUCKER CONSTRUCTION, LLC
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of J & D SMUCKER CONSTRUCTION, LLC in KRUEGER'S AUTO SERVICE, INC. 3231 PERKIOMEN AVENUE, READING, PA 19606 (NAICS 238130). OSHA activity number 340630276.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- J & D SMUCKER CONSTRUCTION, LLC
- Site address
- KRUEGER'S AUTO SERVICE, INC. 3231 PERKIOMEN AVENUE
- City
- READING
- State
- PA
- ZIP
- 19606
- Mailing
- 1767 ROCKVALE ROAD, LANCASTER, PA 17602
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 4
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.501 B10
- Issued
- Oct 26, 2015
- Abate by
- Nov 20, 2015
- Penalty
- Initial $2,800 · Current $2,100 Reduced
General-duty citation text
29 CFR 1926.501(b)(10): Each employee engaged in roofing activities on low-slope roofs with unprotected sides and edges 6 feet or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system: a) On the Garage Shop Roof - On or about May 7, 2015, employees, installing screws in the metal roofing material on a 1.5:12 pitch roof, were not protected from a fall hazard of 17.4 feet by the use of a guardrail system, safety net system, personal fall arrest system, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system. b) On the Storage Area Roof - On or about May 7, 2015, employees, installing metal roofing on the storage area's 1.5:12 pitch roof, were not protected from a fall hazard of 11.8 feet by the use of a guardrail system, safety net system, personal fall arrest system, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
- — F (S) $2100
- — C (S) $2800
- — Z (S) $2800
1926.503 A01
- Issued
- Oct 26, 2015
- Abate by
- Mar 31, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: a) On the Garage Shop Roof - On or about May 7, 2015, employees, installing screws in the metal roofing material on a 1.5:12 pitch roof, were not adequately trained to recognize the nature of the 17.4-foot fall hazard to which they were exposed without the use of a fall protection system. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1926.1053 B01
- Issued
- Oct 26, 2015
- Abate by
- Nov 20, 2015
- Penalty
- Initial $2,800 · Current $2,100 Reduced
General-duty citation text
29 CFR 1926.1053(b)(1): Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed: a) At the East side of the Northeastern Corner - On or about May 7, 2015, the ladder used to access and egress the northeastern corner of the 1.5:12 pitch roof did not extend 3 feet above the edge, exposing employees to a fall hazard of 11.8 feet. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
- — F (S) $2100
- — C (S) $2800
- — Z (S) $2800
1926.1060 A
- Issued
- Oct 26, 2015
- Abate by
- Mar 31, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1060(a): The employer did not provide a training program for each employee using ladders and stairways, as necessary, which would enable each employee to recognize hazards related to ladders and stairways and train each employee in the procedures to be followed to minimize these hazards: a) On the Garage Shop Roof - On or about May 7, 2015, employees, installing screws in the metal roofing material on a 1.5:12 pitch roof 17.4 feet high, were not trained to recognize the hazards related to ladders and stairways or the procedures to be followed to minimize the hazards of ladders and stairways. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 238130)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340630276.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.