WILMINGTON, DE —
OSHA Inspection: ADVANCED EXPLOSIVES DEMOLITION, INC.
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of ADVANCED EXPLOSIVES DEMOLITION, INC. in 100 E. 16TH STREET, WILMINGTON, DE 19809 (NAICS 238910). OSHA activity number 340710201.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ADVANCED EXPLOSIVES DEMOLITION, INC.
- Site address
- 100 E. 16TH STREET
- City
- WILMINGTON
- State
- DE
- ZIP
- 19809
- Mailing
- 181 WELLER RD., TENSED, ID 83870
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238910
- Employees
- 5
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.850 J
- Issued
- Dec 14, 2015
- Penalty
- Initial $2,520 · Current $2,520
General-duty citation text
29 CFR 1926.850(j): The demolition of exterior walls and floor construction did not begin at the top of the structure and proceed downward. Each story of exterior wall and floor construction was not removed and dropped into the storage space before commencing the removal of exterior walls and floors in the story next below. a) 100 E. 16th Street, Wilmington, DE - On or about June 16, 2015, the employer failed to ensure demolition work of exterior walls and floor construction began at the top of the structure, exposing employees to struck by and crushing hazards.
Recent events (1)
- — Z (S) $2520
1926.854 D
- Issued
- Dec 14, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.854(d): Structural or load supporting members were cut or removed before the floors above were demolished and removed. a) 100 E. 16th Street, Wilmington, DE - On or about June 16, 2015, the employer failed to ensure brick masonry columns or load supporting members were not removed before the floors above were demolished or removed, exposing employees to struck by and crushing hazards.
Recent events (1)
- — Z (S) $0
1926.859 G
- Issued
- Dec 14, 2015
- Penalty
- Initial $1,440 · Current $1,440
General-duty citation text
29 CFR 1926.859(g): During demolition, continuing inspections by a competent person were not made as the work progressed to detect hazards resulting from weakened or deteriorated floors, or walls, or loosened material. Employees were also permitted to work where such hazards existed without being corrected by shoring, bracing, or other effective means. a) 100 E. 16th Street, Wilmington, DE - On or about June 16, 2015, the employer failed to continue inspections as the work progressed, exposing employees to struck by or crushing hazards.
Recent events (1)
- — Z (S) $1440
More inspections at Advanced Explosives Demolition, INC.
View Advanced Explosives Demolition, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238910)
More inspections in DE
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340710201.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.