LUBBOCK, TX —
OSHA Inspection: D&L MASONRY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of D&L MASONRY in 6032 43RD ST., LUBBOCK, TX 79407 (NAICS 238140). OSHA activity number 340732908.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- D&L MASONRY
- Site address
- 6032 43RD ST.
- City
- LUBBOCK
- State
- TX
- ZIP
- 79407
- Mailing
- 7720 19TH ST, LUBBOCK, TX 79407
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 3
- Ownership type
- A
Citations
8 citations on file for this inspection.
1926.451 A06
- Issued
- Sep 18, 2015
- Abate by
- Oct 8, 2015
- Penalty
- Initial $3,500 · Current $2,100 Reduced
General-duty citation text
29 CFR 1926.451(a)(6): Scaffolds shall be designed by a qualified person and shall be constructed and loaded in accordance with that design. On June 25, 2015, and times prior thereto, at the west side of the construction site, employer did not ensure a welded frame scaffold was erected by a competent person in scaffold erection. Employees were allowed to work with the scaffold with a number of deficiencies, including but not limited to, the scaffold platforms were not fully planked, there was no means of egress, scaffolding was erected without mudsills or base plates and several of the cross-braces were missing.
Recent events (2)
- — I (S) $2100
- — Z (S) $3500
1926.451 F07
- Issued
- Sep 18, 2015
- Abate by
- Oct 8, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(f)(7): Scaffolds shall be erected, moved, dismantled, or altered only under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration. Such activities shall be performed only by experienced and trained employees selected for such work by the competent person. On June 25, 2015, and times prior thereto, at the west side of the construction site, employees who erected a welded frame scaffold were not directed by a competent person in scaffold erection. The employees worked from the scaffold that was not fully planked, with no means of egress, without adequate base plate and were exposed to an unprotected fall of over 10 feet to the ground below.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 B01
- Issued
- Sep 18, 2015
- Abate by
- Oct 8, 2015
- Penalty
- Initial $4,200 · Current $2,520 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports. On June 25, 2015, and times prior thereto, at the west side of Lubbock Emergency Communication District's building, employees were exposed to fall hazards when working from the second tier of a scaffold that was not fully planked.
Recent events (2)
- — I (S) $2520
- — Z (S) $4200
1926.451 F04
- Issued
- Sep 18, 2015
- Abate by
- Oct 8, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(f)(4): Any part of a scaffold damaged or weakened such that its strength is less than that required by paragraph (a) of this section shall be immediately repaired or replaced, braced to meet those provisions, or removed from service until repaired. On June 25, 2015, and times prior thereto, at the west side of the construction site, scaffolding was erected with split planks that affects the load capacity, exposing employees to fall hazards.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 G01
- Issued
- Sep 18, 2015
- Abate by
- Oct 8, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet (3.1 m) above a lower level shall be protected from falling to that lower level. Paragraphs (g)(1)(i) through (vii) of this section establish the types of fall protection to be provided to the employees on each type of scaffold. Paragraph (g)(2) of this section addresses fall protection for scaffold erectors and dismantlers. On June 25, 2015, and times prior thereto, at the west side of the construction site, employees were exposed to fall hazards when working from the second tier of a scaffold without guardrails.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 E01
- Issued
- Sep 18, 2015
- Abate by
- Oct 8, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as used as a means of access. On June 25, 2015, and times prior thereto, at the west side of Lubbock Emergency Communication District's building, employees were exposed to fall hazards when accessing the second tier of the scaffold when a ladder was not provided.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 C02
- Issued
- Sep 18, 2015
- Abate by
- Oct 8, 2015
- Penalty
- Initial $3,500 · Current $2,100 Reduced
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation. On June 25, 2015, and times prior thereto, at the west side of the Lubbock Emergency Communication District's building, scaffolding was erected without adequate base plate exposing employees to fall hazards.
Recent events (2)
- — I (S) $2100
- — Z (S) $3500
1926.451 C01
- Issued
- Sep 18, 2015
- Abate by
- Oct 8, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(c)(1): Supported scaffolds with a height to base width (including outrigger supports, if used) ratio of more than four to one (4:1) shall be restrained from tipping by guying, tying, bracing, or equivalent means. On June 25, 2015, and times prior thereto, at the west side of the construction site, employees were exposed to fall hazards when working from the second tier of a scaffold that was not fully braced.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at D&L Masonry
View D&L Masonry's full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340732908.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.