OSHA Inspection: METROPOLITAN MASONRY WATERPROOFING AND RESTORATION, INC.

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of METROPOLITAN MASONRY WATERPROOFING AND RESTORATION, INC. in 9 MINER STREET, BOSTON, MA 02115 (NAICS 238140). OSHA activity number 340754662.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Metropolitan Masonry Waterproofing and Restoration, INC. — free Get an email when a new federal OSHA severe-injury report for Metropolitan Masonry Waterproofing and Restoration, INC. is published. One employer, no account, unsubscribe in one click.
Site address
9 MINER STREET
City
BOSTON
State
MA
ZIP
02115
Mailing
125 WASHINGTON STREET, FOXBORO, MA 02035
Inspection type
Unprogrammed Other (I)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
5
Ownership type
A

3 citations on file for this inspection.

1926.451 G01

Serious Gravity 5 2 instances 2 exposed
Issued
Oct 6, 2015
Abate by
Oct 15, 2015
Penalty
Initial $1,800 · Current $900 Reduced
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level.    Jobsite:  Scaffolding at front of building    Scaffolding was not adequately protected with guard rails.    Instance A:  A side bracket plank from which an employee working lacked an adequate guard rail.    Instance B:  An scaffold work platform at which an employee was receiving material lacked guard rails.
Recent events (2)
  • — I (S) $900
  • — Z (S) $1800

1926.451 H02 II

Other-than-serious 1 instance 4 exposed
Issued
Oct 6, 2015
Abate by
Oct 15, 2015
Penalty
Initial $2,160 · Current $1,080 Reduced
29 CFR 1926.451(h)(2)(ii): Toeboards were not erected along the edge of platforms more than 10 feet (3.1 m) above lower levels for a distance sufficient to protect employees below:    Jobsite:  Scaffold at front of building.    The scaffold lacked toeboards to prevent struck-by injuries from falling objects to persons working below.
Recent events (2)
  • — I (O) $1080
  • — Z (S) $2160

1926.452 C02

Serious Gravity 5 3 instances 5 exposed
Issued
Oct 6, 2015
Abate by
Oct 15, 2015
Penalty
Initial $1,800 · Current $900 Reduced
29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally:    Jobsite:  Fabricated frame scaffolding at the front of the building.    A section of scaffolding on each of the first, second, and third levels lacked cross braces.
Recent events (2)
  • — I (S) $900
  • — Z (S) $1800

View Metropolitan Masonry Waterproofing and Restoration, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340754662.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.