Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: S&H POWERLINE CONSTRUCTION

Federal Agency inspection · Safety discipline

On , OSHA opened a federal Agency safety inspection of S&H POWERLINE CONSTRUCTION in CR 2140 & CR 2135, CORSICANA, TX 75151 (NAICS 238210). OSHA activity number 340761857.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch S&H Powerline Construction — free Get an email when a new federal OSHA severe-injury report for S&H Powerline Construction is published. One employer, no account, unsubscribe in one click.
Site address
CR 2140 & CR 2135
City
CORSICANA
State
TX
ZIP
75151
Mailing
725 BELLVIEW ROAD, CRAWFORD, TX 76638
Inspection type
Federal Agency (M)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238210
Employees
57
Ownership type
A

3 citations on file for this inspection.

1910.269 A02 II E

Serious Gravity 10 1 instance 1 exposed
Issued
Sep 24, 2015
Abate by
Oct 23, 2015
Penalty
Initial $4,900 · Current $3,430 Reduced
29 CFR 1910.269(a)(2)(ii)(E): Each qualified employee was not trained and competent in recognition of electrical hazards and skills to control or avoid them.    At a Eureka, Texas job site, an employee installing electrical lines from a bucket truck was not trained to recognized, control and avoid electrical hazards exposing him to an electrocution hazard.
Recent events (2)
  • — I (S) $3430
  • — Z (S) $4900

1910.269 A02 IV

Serious Gravity 1 1 instance 1 exposed
Issued
Sep 24, 2015
Abate by
Oct 23, 2015
Penalty
Initial $0 · Current $0
29 CFR 1910.269(a)(2)(iv): The employer did not determine that each employee was complying with all required safety related work practices by regular supervision and Annual inspections.    The employer did not ensure that employees exposed to electrocution hazards complied with safety related work practice techniques by ensuring regular supervision.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1904.39 A02

Other-than-serious 1 instance 1 exposed
Issued
Sep 24, 2015
Abate by
Oct 23, 2015
Penalty
Initial $3,500 · Current $2,100 Reduced
29 CFR 1904.39(a)(2): The employer did not report an in-patient hospitalization, amputation, or loss of an eye as a result of a work-related incident to OSHA within twenty-four (24) hours.     On or about July 6, 2015, the employer failed to report to OSHA a work related hospitalization prior to the elapse of the 24 hour reporting period of the incident.
Recent events (2)
  • — I (O) $2100
  • — Z (O) $3500

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340761857.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.