LITITZ, PA —
OSHA Inspection: ZARTMAN CONSTRUCTION INC.
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of ZARTMAN CONSTRUCTION INC. in SPEEDWELL FORGE LAKE DAM, LITITZ, PA 17543 (NAICS 238110). OSHA activity number 340769249.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ZARTMAN CONSTRUCTION INC.
- Site address
- SPEEDWELL FORGE LAKE DAM
- City
- LITITZ
- State
- PA
- ZIP
- 17543
- Mailing
- 3000 POINT TOWNSHIP DR., NORTHUMBERLAND, PA 17857
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (I)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238110
- Employees
- 15
- Ownership type
- A
Citations
1 citation on file for this inspection.
1926.451 E05 I
- Issued
- Nov 5, 2015
- Abate by
- Dec 3, 2015
- Penalty
- Initial $3,570 · Current $2,678 Reduced
General-duty citation text
29 CFR 1926.451(e)(5)(i): Ramps and walkways 6 feet (1.8 m) or more above lower levels did not have guardrail systems that comply with subpart M of this part -- Fall Protection: a) Speedwell Forge Lake Dam; Front Side of Concrete Wall Form - Employees using a walkway to access a form scaffold were not protected by a guard rail system and were exposed to fall hazards up to 9 feet - 1 inch to the ground below, on or about July 10, 2015. b) Speedwell Forge Lake Dam; Rear Side of Concrete Wall Form - Employees using a walkway to access a form scaffold were not protected by a guard rail system and were exposed to fall hazards up to 10 feet - 10 inches to the ground below, on or about July 10, 2015. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2677.5
- — Z (S) $3570
More inspections at Zartman Construction INC.
View Zartman Construction INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238110)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340769249.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.