OSHA Inspection: EVERSON TESLA, INC.

Referral inspection · Health discipline

On , OSHA opened a referral health inspection of EVERSON TESLA, INC. in 614 GREMAR RD, NAZARETH, PA 18064 (NAICS 335312). OSHA activity number 340787944.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Everson Tesla, INC. — free Get an email when a new federal OSHA severe-injury report for Everson Tesla, INC. is published. One employer, no account, unsubscribe in one click.
Establishment
EVERSON TESLA, INC.
Site address
614 GREMAR RD
City
NAZARETH
State
PA
ZIP
18064
Mailing
614 GREMAR RD, NAZARETH, PA 18064
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
335312
Employees
73
Ownership type
A

23 citations on file for this inspection.

1910.24 B

Deleted Serious Gravity 10 1 instance 1 exposed
Issued
Dec 1, 2015
Abate by
Dec 19, 2015
Penalty
Initial $5,390 · Current $0 Reduced

Hazardous substances 24602582

29 CFR 1910.24(b): Fixed stairs were not provided were access to elevations was routinely required for such purposes as gauging, inspection, regular maintenance, etc., where such work may expose employee(s) to acids, caustics, gases, or other harmful substances, or for which purposes the carrying of tools or equipment by hand is normally required:  a) Everson Tesla - VPI Tank - On or about July 28, 2015 employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping on a daily basis access was gained using an improperly positioned step ladder exposing employees to fall hazards.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $5390

1910.106 E02 IV D

Serious Gravity 5 2 instances 1 exposed
Issued
Dec 1, 2015
Abate by
Dec 19, 2015
Penalty
Initial $3,273 · Current $2,166 Reduced

Hazardous substances 2460

29 CFR 1910.106(e)(2)(iv)(d): Flammable liquids were not drawn from or transferred into vessels, containers, or portable tanks within a building only through a closed piping system, from safety cans, by means of a device drawing through the top, or from a container or portable tanks by gravity through an approved self-closing valve:    a)  Everson Tesla - VPI Pit - On or about July 16, 2015, an employee was transferring toluene from a 55 gallon drum to an open top 5 gallon bucket and then dumping the bucket of solvent onto the floor of tank pit, exposing employees to fire and burn hazards.    b) Everson Tesla - VPI Pit - On or about July 16 , 2015 an employee working in the VPI tank pit was draining toluene out of the VPI Tanks into open top 5 gallon buckets as part of the cleaning of the VPI tanks, exposing the employee to fire and burn hazards.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2166
  • — Z (S) $3273

1910.146 C01

Serious Gravity 10 1 instance 1 exposed
Issued
Dec 1, 2015
Abate by
Jan 3, 2016
Penalty
Initial $5,390 · Current $3,773 Reduced

Hazardous substances 24602582

29 CFR 1910.146(c)(1): The employer did not evaluate the workplace to determine if any spaces were permit-required confined spaces:    a)   Everson Tesla VPI Pit - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to both drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene.  The employer did not identify this space as a permit required confined space where atmospheric hazards are present.     b) Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when ever cleaning is required.  The employer did not identify this space a permit required confined space where both atmospheric and mechanical hazards are present.     Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $3773
  • — Z (S) $5390

1910.146 C02

Serious Gravity 10 2 instances 1 exposed
Issued
Dec 1, 2015
Penalty
Initial $0 · Current $0

Hazardous substances 24602582

29 CFR 1910.146(c)(2):  The employer did not inform exposed employees, by posting danger signs or by any other equally effective means, of the existence and location of and the danger posed by the permit spaces:  a)  Everson Tesla - VPI Pit - On or about July 16, 2015,  Employee(s) work with toluene in a permit-required confined space (VPI Tank Pit), and the employer did not inform exposed employees, by posting danger signs or by any other equally effective means, of the existence and location of and the danger posed by the permit spaces.   b) Everson Tesla - VPI Tank - On or about July 16, 2015,  employees enter the VPI tank, a permit required confined space for rescue and the employer had not informed employees in an effective manner of existence, location and dangers posed by the permit space.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 C04

Serious Gravity 10 2 instances 3 exposed
Issued
Dec 1, 2015
Abate by
Jan 15, 2016
Penalty
Initial $0 · Current $0

Hazardous substances 24602582

29 CFR 1910.146(c)(4): When the employer decided that its employees would enter permit spaces, the employer did not develop and implement a written permit space entry program that complied with 29 CFR 1910.146:    (a)   Everson Tesla VPI Pit - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene.  The employer did not identify this space as a permit required confined space where atmospheric hazards are present.     b) Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required.  The employer did not identify this space a permit required confined space where both atmospheric and mechanical hazards are present.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 D01

Serious Gravity 5 2 instances 1 exposed
Issued
Dec 1, 2015
Abate by
Dec 19, 2015
Penalty
Initial $3,273 · Current $2,166 Reduced

Hazardous substances 24602582

29 CFR 1910.146(d)(1): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not implement the measures necessary to prevent unauthorized entry:     (a)   Everson Tesla VPI Pit - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene.  The employer did not identify this space as a permit required confined space where atmospheric hazards are present.     b) Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required.  The employer did not identify this space a permit required confined space where both atmospheric and mechanical hazards are present.        Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2166
  • — Z (S) $3273

1910.146 D02

Serious Gravity 5 2 instances 1 exposed
Issued
Dec 1, 2015
Abate by
Jan 15, 2016
Penalty
Initial $0 · Current $0

Hazardous substances 24602582

29 CFR 1910.146(d)(2): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not identify and evaluate the hazards of permit spaces before employees entered:      (a)   Everson Tesla VPI Pit - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene.  The employer did not identify this space as a permit required confined space where atmospheric hazards are present.     b) Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required.  The employer did not identify this space a permit required confined space where both atmospheric and mechanical hazards are present.        Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 D03 I

Serious Gravity 5 2 instances 1 exposed
Issued
Dec 1, 2015
Abate by
Jan 15, 2016
Penalty
Initial $0 · Current $2,166

Hazardous substances 24602582

29 CFR 1910.146(d)(3)(i): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not develop and implement the means, procedures, and practices necessary for safe permit space entry operations, including specifying acceptable entry conditions:     (a)   Everson Tesla VPI Pit - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene.  The employer did not identify this space as a permit required confined space where atmospheric hazards are present.     b) Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required. The employer did not identify this space a permit required confined space where both atmospheric and mechanical hazards are present.       Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2166
  • — Z (S) $0

1910.146 D03 III

Serious Gravity 5 1 instance 1 exposed
Issued
Dec 1, 2015
Abate by
Jan 15, 2016
Penalty
Initial $0 · Current $0

Hazardous substances 24602582

29 CFR 1910.146(d)(3)(iii): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not develop and implement the means, procedures, and practices necessary for safe permit space entry operations, including isolating the permit space:     (a) Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required. The employer did not identify this space a permit required confined space where both atmospheric and mechanical hazards are present.       Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 D03 VI

Serious Gravity 5 2 instances 1 exposed
Issued
Dec 1, 2015
Abate by
Jan 15, 2016
Penalty
Initial $0 · Current $0

Hazardous substances 24602582

29 CFR 1910.146(d)(3)(vi): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not develop and implement the means, procedures, and practices necessary for safe permit entry operations, including, but not limited to, verifying that conditions in the permit space are acceptable for entry throughout the duration of an authorized entry:    (a)   Everson Tesla VPI Pit - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene.  The employer did not identify this space as a permit required confined space where atmospheric hazards are present.     b) Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required.  The employer did not identify this space a permit required confined space where both atmospheric and mechanical hazards are present.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 D04

Serious Gravity 5 3 instances 1 exposed
Issued
Dec 1, 2015
Abate by
Jan 15, 2016
Penalty
Initial $3,273 · Current $2,166 Reduced

Hazardous substances 24602582

29 CFR 1910.146(d)(4): The employer did not provide the equipment specified in paragraphs (d)(4)(i)-(d)(4)(ix) of this section to employees, and/or did not ensure that employees use that equipment properly:    a) Everson Tesla VPI Pit - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene.  The employer did not identify this space as a permit required confined space where atmospheric hazards are present and did not provide testing and monitoring equipment which would measure the levels of toluene vapors in the pit area.      b) Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required.  the employer did not identify this space a permit required confined space where both atmospheric and mechanical hazards are present.  The employee entered the large VPI tank using a folded up A-frame step ladder which only came to just below the tank rim, exposing employees to a fall hazard of approximately 7.5 feet.     c) Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required. The employer did not identify this space a permit required confined space where both atmospheric and mechanical hazards are present.  The employees were not provided testing and monitoring equipment which would measure the levels of vinyl toluene vapors in the tank exposing employees to unknown levels of vinyl toluene vapors.      Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2166
  • — Z (S) $3273

1910.146 D05

Serious Gravity 5 2 instances 1 exposed
Issued
Dec 1, 2015
Abate by
Dec 19, 2015
Penalty
Initial $0 · Current $0

Hazardous substances 24602582

29 CFR 1910.146(d)(5): Permit-required confined space(s) were not evaluated as required under (d)(5)(i) through (d)(5)(vi) of this paragraph when entry operations were conducted.  a)  Everson Tesla VPI Pit - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene.  The employer did not evaluate the confined space for atmospheric hazards such as, but not limited to, low oxygen levels,  flammable and toxic vapor levels.  b)  Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required where both atmospheric and mechanical hazards are present. The employer did not evaluate the confined space for atmospheric hazards such as, but not limited to, low oxygen levels and flammable and toxic vapors levels.      Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 D06

Serious Gravity 5 2 instances 1 exposed
Issued
Dec 1, 2015
Abate by
Dec 19, 2015
Penalty
Initial $0 · Current $0

Hazardous substances 24602582

29 CFR 1910.146(d)(6): The employer did not provide at least one attendant outside the permit space into which entry was authorized for the duration of entry operations:  a)  Everson Tesla VPI Pit - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene.  The employer did not provide at least one attendant outside the permit space while entry was authorized and for the duration of entry operations.  b)  Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and whenever cleaning is required.  The employer did not provide at least one attendant outside the permit space while entry was authorized and for the duration of entry operations.      Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 D08

Serious Gravity 5 2 instances 1 exposed
Issued
Dec 1, 2015
Abate by
Jan 15, 2016
Penalty
Initial $0 · Current $0

Hazardous substances 24602582

29 CFR 1910.146(d)(8): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not designate the persons who were to have active roles in entry operations, identify the duties of each such employee, and did not provide each such employee with the training required by 29 CFR 1910.146(g):    a) Everson Tesla VPI Pit - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene.  The employer did not designate, by name or title the persons who were to have active roles in entry operations, identify the duties of each such employee, and did not provide each such employee with the training required by this paragraph.    b)  Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required.  The employer did not designate, by name or title the persons who were to have active roles in entry operations, identify the duties of each such employee, and did not provide each such employee with the training required by this paragraph.      Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 D09

Serious Gravity 5 2 instances 1 exposed
Issued
Dec 1, 2015
Abate by
Dec 19, 2015
Penalty
Initial $0 · Current $0

Hazardous substances 24602582

29 CFR 1910.146(d)(9): The employer did not develop and implement procedures for summoning rescue and emergency services, for rescuing entrants from permit spaces, for providing necessary emergency services to rescued employees, and for preventing unauthorized personnel from attempting a rescue:  a)  Everson Tesla - VPI Pit - Everson Tesla VPI Pit - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene. The employer did not develop and implement procedures as required by this paragraph.  b) Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required  The employer did not develop and implement procedures as required by this paragraph.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 D10

Serious Gravity 5 2 instances 1 exposed
Issued
Dec 1, 2015
Abate by
Dec 19, 2015
Penalty
Initial $0 · Current $0

Hazardous substances 24602582

29 CFR 1910.146(d)(10): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not develop and implement a system for the preparation, issuance, use, and cancellation of entry permits as required:  a) Everson Tesla VPI Pit - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene.  The employer did not develop and implement a system for the use of entry permits.  b)  Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required.  The employer did not develop and implement a system for the use of entry permits.     Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 E01

Serious Gravity 5 2 instances 1 exposed
Issued
Dec 1, 2015
Abate by
Dec 19, 2015
Penalty
Initial $3,273 · Current $2,166 Reduced

Hazardous substances 24602582

29 CFR 1910.146(e)(1): Before entry was authorized, the employer did not document the completion of measures required by 29 CFR 1910.146(d)(3) by preparing an entry permit:    a)  Everson Tesla VPI Pit - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene.  The employer did not document the completion of measures required by 29 CFR 1910.146(d)(3) by preparing an entry permit showing that atmospheric and other hazards had been eliminated.    b)  Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required.  The employer did not document the completion of measures required by 29 CFR 1910.146(d)(3) by preparing an entry permit showing that atmospheric and other hazards had been eliminated prior to entry into the space.       Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.    Note:  Appendix D to 29 CFR 1910.146 presents examples of permits whose elements are considered to comply with these requirements.
Recent events (2)
  • — I (S) $2166
  • — Z (S) $3273

1910.146 G01

Serious Gravity 5 2 instances 1 exposed
Issued
Dec 1, 2015
Abate by
Jan 29, 2016
Penalty
Initial $3,273 · Current $2,166 Reduced

Hazardous substances 24602582

29 CFR 1910.146(g)(1): The employer did not provide training so that all employees whose work was regulated by 29 CFR 1910.146 (permit required confined spaces) acquired the understanding, knowledge, and skills necessary for the safe performance of the duties assigned under 29 CFR 1910.146:      a) Everson Tesla VPI Pit - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene.  The employer did not provide training so that all employees whose work was regulated by 29 CFR 1910.146 (permit required confined spaces) acquired the understanding, knowledge, and skills necessary for the safe performance of the duties assigned under 29 CFR 1910.146.    b)  Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required.  The employer did not provide training so that all employees whose work was regulated by 29 CFR 1910.146 (permit required confined spaces) acquired the understanding, knowledge, and skills necessary for the safe performance of the duties assigned under 29 CFR 1910.146.       Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2166
  • — Z (S) $3273

1910.146 K01 I

Serious Gravity 5 2 instances 1 exposed
Issued
Dec 1, 2015
Abate by
Feb 29, 2016
Penalty
Initial $3,273 · Current $2,166 Reduced

Hazardous substances 24602582

29 CFR 1910.146(k)(1)(i):  An employer who designated rescue and emergency services, pursuant to paragraph (d)(9) of this section, did not evaluate a prospective rescuer's ability to respond to a rescue summons in a timely manner, considering the hazard(s) identified:    a)  Everson Tesla VPI Pit - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene.  The employer did not evaluate a prospective rescuer's ability to respond to a rescue summons in a timely manner, considering the hazard(s) identified.    b) Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required. The employer did not evaluate a prospective rescuer's ability to respond to a rescue summons in a timely manner, considering the hazard(s) identified.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2166
  • — Z (S) $3273

1910.146 K01 II

Serious Gravity 5 1 instance 1 exposed
Issued
Dec 1, 2015
Abate by
Feb 29, 2016
Penalty
Initial $0 · Current $0

Hazardous substances 24602582

29 CFR 1910.146(k)(1)(ii): When designating rescue and emergency services pursuant to paragraph (d)(9), the employer did not evaluate the prospective rescuer's ability, in terms of proficiency with rescue-related tasks and equipment, to function appropriately while rescuing entrants from the particular space or types of spaces identified:    a)  Everson Tesla - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene.  The employer did not evaluate a prospective rescuer's ability to perform rescue related tasks to include entry into permit required confined spaces where hazardous atmosphere or mechanical hazards exist.     b) Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required.  The employer did not evaluate a prospective rescuer's ability to perform rescue related tasks to include entry into permit required confined spaces where hazardous atmosphere or mechanical hazards exist.     Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 K01 V

Serious Gravity 5 1 instance 1 exposed
Issued
Dec 1, 2015
Abate by
Feb 29, 2016
Penalty
Initial $0 · Current $0
29 CFR 1910.146(k)(1)(v): The employer who had designated rescue and emergency services did not provide the selected rescue team or service  with access to all permit spaces from which rescue could  be necessary, so that the rescue service could develop appropriate rescue plans and practice rescue operations.    a)  Everson Tesla VPI Pit - On or about July 16, 2015 employees enter a VPI pit area that is approximately 8 feet deep to drain toluene containing resin from the VPI tanks and to clean the pit floor using toluene. The employer did not provide a prospective rescuer service access to all permit spaces.    b)  Everson Tesla - VPI Tank - On or about July 28, 2015,  employees enter a VPI processing tank that is approximately 7.5 feet deep to hookup and disconnect internal resin piping and when cleaning is required.  The employer did not provide a prospective rescuer service access to all permit spaces.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.147 C04 II B

Serious Gravity 5 1 instance 3 exposed
Issued
Dec 1, 2015
Abate by
Jan 29, 2016
Penalty
Initial $3,273 · Current $2,166 Reduced

Hazardous substances 24602582

29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy:    a)  Everson Tesla - VPI Tank Area On or about July 28, 2015 - Employees who enter VPI tanks to perform set up and servicing are exposed to mechanical and atmospheric hazards and the employer did not develop or document procedures which clearly and specifically outlined the steps for shutting down, isolating, blocking and securing machines or equipment to control  hazardous energy when servicing the tanks.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2166
  • — Z (S) $3273

1910.147 C07 I

Serious Gravity 5 1 instance 3 exposed
Issued
Dec 1, 2015
Abate by
Jan 29, 2016
Penalty
Initial $0 · Current $0

Hazardous substances 24602582

29 CFR 1910.147(c)(7)(i): The employer did not provide adequate training to ensure that employees acquired the knowledge and skills required for the safe application, usage and removal of energy control devices    a)  Everson Tesla - VPI Tank Area On or about July 28, 2015 - Employees who enter VPI tanks to perform set up and servicing are exposed to mechanical and atmospheric hazards and the employer has not provided training to ensure employees acquired the knowledge and skills required for elimination of all energy sources during this work.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Everson Tesla, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340787944.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.