Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: SOLID STEEL CONSTRUCTION INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SOLID STEEL CONSTRUCTION INC. in YMCA 490 BESSEMER ROAD, MOUNT PLEASANT, PA 15666 (NAICS 238120). OSHA activity number 340821859.

Watch Solid Steel Construction INC. — free Get an email when a new federal OSHA severe-injury report for Solid Steel Construction INC. is published. One employer, no account, unsubscribe in one click.
Site address
YMCA 490 BESSEMER ROAD
City
MOUNT PLEASANT
State
PA
ZIP
15666
Mailing
7114 CHURCH AVENUE, PITTSBURGH, PA 15202
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238120
Employees
6
Ownership type
A

5 citations on file for this inspection.

1926.453 B02 V

Serious Gravity 5 1 instance 3 exposed
Issued
Penalty
Initial $1360.00 · Current $911.00 Reduced
29 CFR 1926.453(b)(2)(v): A body belt was not worn and/or a lanyard was not attached to the boom or basket when working from an aerial lift: Note:  As of January 1, 1998, subpart M of this part (1926.502(d)) provides that body belts are not acceptable as part of a personal fall arrest system.      (a) Jobsite, 490 Bessemer Road, Mt. Pleasant, PA:  On or about August 3, 2015 employees working in aerial lifts were not wearing a harness attached to the boom or basket exposing them to fall hazards up to 20 feet to the ground below.
Recent events (2)
  • — I (S) $911
  • — Z (S) $1360

1926.760 A01

Serious Gravity 5 1 instance 1 exposed
Issued
Penalty
Initial $2040.00 · Current $1366.00 Reduced
29 CFR 1926.760(a)(1): Each employee engaged in a steel erection activity who is on a walking/working surface with an unprotected side or edge more than 15 feet (4.6 m) above a lower level was not protected from fall hazards by guardrail systems, safety net systems, personal fall arrest systems, positioning device systems, or fall restraint systems.    (a) Jobsite, YMCA, 490 Bessemer Road, Mt. Pleasant, PA:  On or about August 3, 2015 an employee engaged in steel erection activities approximately 20 feet above the ground was not protected from falling by the use of personal fall arrest systems, positioning devices, guardrails or safety net systems.
Recent events (2)
  • — I (S) $1366
  • — Z (S) $2040

1926.454 A

Serious Gravity 1 1 instance 4 exposed
Issued
Penalty
Initial $1020.00 · Current $685.00 Reduced
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards.    (a) Jobsite, YMCA, 490 Bessemer Road, Mt. Pleasant, PA:  On or about August 3, 2015 employees who perform work from aerial lifts have not been trained by the employer or another qualified person to ensure the employees understood and were able to recognize the hazards associated with the type of scaffold being used.  Employees had not been trained to use personal fall arrest systems when working from an aerial lift.
Recent events (2)
  • — I (S) $685
  • — Z (S) $1020

1926.761 B

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.761(b): The employer did not train each employee exposed to a fall hazard in accordance with the requirements of 29 CFR 1926.761:  (a) Jobsite, YMCA, 490 Bessemer Road, Mt. Pleasant, PA:  On or about August 3, 2015 employees who are engaged in steel erection activities hand are exposed to fall hazards have not received any training ion fall protection system requirements when performing such work.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.752 B

Other-than-serious 1 instance 6 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.752(b): Commencement of steel erection. A steel erection contractor shall not erect steel unless it has received written notification that the concrete in the footings, piers and walls or the mortar in the masonry piers and walls has attained, on the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during steel erection.  (a) Jobsite, YMCA, 490 Bessemer Road, Mt. Pleasant, PA:  On or about August 3, 2015 the steel erection contractor proceeded with the erection of the columns, beams and purlins without receiving written notification that the concrete in the footings and piers had attained either 75 percent of the intended minimum compressive design strength or there was sufficient strength to support the loads during steel erection in accordance with ASTM standard test methods.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340821859.