Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: SQUARE 1 ROOFING LLC

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of SQUARE 1 ROOFING LLC in 1860 LEUTZE ROAD SDA. 204, NORFOLK, VA 23511 (NAICS 238160). OSHA activity number 340843606.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Square 1 Roofing LLC — free Get an email when a new federal OSHA severe-injury report for Square 1 Roofing LLC is published. One employer, no account, unsubscribe in one click.
Site address
1860 LEUTZE ROAD SDA. 204
City
NORFOLK
State
VA
ZIP
23511
Mailing
5812 MOORETOWN ROAD, WILLIAMSBURG, VA 23188
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
5
Ownership type
A

3 citations on file for this inspection.

1926.501 B10

Serious Gravity 10 1 instance 7 exposed
Issued
Jan 25, 2016
Penalty
Initial $2,800 · Current $2,100 Reduced
29 CFR 1926.501(b)(10):  Each employee engaged in roofing activities on low-slope roofs with unprotected sides and edges 6 feet or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system.  Or, on roofs 50-feet (15.25 m) or less in width, each employee was not protected by use of a monitoring system:  a)      Defense Logistics Agency building SDA-204: On or about 08/06/2015, subcontracted employees working on a flat roof approximately 20 feet wide were not provided with fall protection while disconnected from the horizontal lifeline as a result an employee fell 15 feet to the ground.    No abatement certification or documentation required.
Recent events (2)
  • — I (S) $2100
  • — Z (S) $2800

1926.502 D08

Serious Gravity 10 1 instance 7 exposed
Issued
Jan 25, 2016
Abate by
Feb 19, 2016
Penalty
Initial $2,800 · Current $2,100 Reduced
29 CFR 1926.502(d)(8): Horizontal lifelines were not designed, installed, and used under the supervision of a qualified person, as part of a complete personal fall arrest system, which maintained a safety factor of at least two:  a)    Defense Logistics Agency Building SDA-204: On or about 08/06/2015, the employer did not utilize a qualified person to install the Guardian CB-12 Horizontal Lifeline and restraint system used by employees.     Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $2100
  • — Z (S) $2800

1926.503 A02 II

Serious Gravity 10 1 instance 7 exposed
Issued
Jan 25, 2016
Abate by
Feb 19, 2016
Penalty
Initial $2,800 · Current $2,100 Reduced
29 CFR 1926.503(a)(2)(ii): The employer did not assure that each employee, as necessary, had been trained by a competent person in the correct procedures for erecting, maintaining, disassembling and inspecting the fall protection systems to be used:  a)    Defense Logistics Agency Building SDA-204: On or about 08/06/2015, subcontracted employees were not trained by a Competent Person in the proper procedures of erecting and inspecting the CB-12 Guardian horizontal lifeline and fall restraint systems.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $2100
  • — Z (S) $2800

View Square 1 Roofing LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340843606.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.