OSHA Inspection: SUFFOLK CONSTRUCTION COMPANY, INC.

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of SUFFOLK CONSTRUCTION COMPANY, INC. in 100 CHARLES COLTON ROAD, TAUNTON, MA 02780 (NAICS 236220). OSHA activity number 340903103.

Watch Suffolk Construction Company, INC. — free Get an email when a new federal OSHA severe-injury report for Suffolk Construction Company, INC. is published. One employer, no account, unsubscribe in one click.
Site address
100 CHARLES COLTON ROAD
City
TAUNTON
State
MA
ZIP
02780
Mailing
65 ALLERTON STREET, BOSTON, MA 02119
Inspection type
Unprogrammed Related (G)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
5
Ownership type
A

3 citations on file for this inspection.

1926.757 D02 II

Deleted Serious Gravity 5 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $5500.00 · Current $0.00 Reduced
29 CFR 1926.757(d)(2)(ii): Two rows of bolted diagonal erection bridging were not installed near the third points of steel joists more than 60 feet long.  Jobsite:  Bays between Columns 4 and 5.  Only one row of diagonal erection bridging was installed on most steel joists more than 60 feet long and that bridging was near the center of the joist span.  No diagonal erection bridging was installed one of the steel joists.
Recent events (3)
  • — F (S) $0
  • — C (S) $5500
  • — Z (S) $5500

1926.757 D02 III

Deleted Serious Gravity 5 1 instance 10 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.757(d)(2)(iii): Hoisting cables were released before two rows of bolted diagonal erection bridging, located near the third points of the joists, were installed on steel joists more than 60 feet in length.    Jobsite:  Bays between column lines 4 and 5.  Hoisting cables were released before two rows of diagonal erection bridging were installed at the third points of the joists.  For many joists, just one row of diagonal erection bridging was installed near the mid-point of the joists.  For one joist, no diagonal erection bridging had been installed.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1926.757 E04 I

Other-than-serious 1 instance 12 exposed
Issued
Abate by
Penalty
Initial $5500.00 · Current $5500.00
29 CFR 1926.757(e)(4)(i):     The employer has first determined from a qualified person and documented in a site-specific erection plan that the structure or portion of the structure is capable of supporting the load;    Jobsite:  Bays between column lines 4 and 5.    Bundles of decking were placed on steel joists when the joists had not been bridged in accordance with the steel erection drawings.  The site specific steel erection plan had no documentation that a qualified person had determined that it was safe to place decking on steel joists without joists being fully bridged and in at least 2 bays decking was placed more than 1 foot of the bearing surface of the joist end.
Recent events (3)
  • — F (O) $5500
  • — C (S) $5500
  • — Z (S) $5500

View SUFFOLK CONSTRUCTION COMPANY, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340903103.