OSHA Inspection: SMART LINE CONSTRUCTION, INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of SMART LINE CONSTRUCTION, INC. in 1729 INDEPENDENCE WAY, LITITZ, PA 17543 (NAICS 238170). OSHA activity number 340915008.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Smart Line Construction, INC. — free Get an email when a new federal OSHA severe-injury report for Smart Line Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
1729 INDEPENDENCE WAY
City
LITITZ
State
PA
ZIP
17543
Mailing
P.O. BOX 6639 8400 BUSTLETON AVENUE, SUITE 2, PHILADELPHIA, PA 19152
Inspection type
Referral (C)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238170
Employees
2
Ownership type
A

6 citations on file for this inspection.

1926.501 B11

Serious Gravity 10 1 instance 1 exposed
Issued
Sep 30, 2015
Penalty
Initial $3,080 · Current $3,080
29 CFR 1926.501(b)(11): Each employee on a steep roof with unprotected sides and edges 6 feet (1.8 m) or more above lower levels was not protected from falling by guardrail systems with toeboards, safety net systems, or personal fall arrest systems:    a)  Along the Northeast Side of the Building - On or about September 9, 2015, an employee, putting the Azek trim on the cupola, was not protected from a fall hazard of 16.5 feet from a steeply sloped roof by the use of a guardrail system, safety net system, personal fall arrest system, or alternative fall protection.    No abatement certification or documentation required.
Recent events (1)
  • — Z (S) $3080

1926.1053 B01

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 30, 2015
Abate by
Oct 27, 2015
Penalty
Initial $2,640 · Current $2,640
29 CFR 1926.1053(b)(1): Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed:    a)  Along the Northeast Side of the Building - On or about September 9, 2015, an employee, putting the Azek trim on the cupola, was exposed to a fall hazard of 16.5 feet because the ladder used to access the roof did not extend 3 feet above the eave.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2640

1926.1053 B15

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 30, 2015
Abate by
Oct 27, 2015
Penalty
Initial $1,760 · Current $1,760
29 CFR 1926.1053(b)(15): Ladder(s) were not inspected by a competent person for visible defects on a periodic basis and/or after an occurrence that could have affected their safe use:     a)  Along the Northeast Side of the Building - On or about September 9, 2015, an employee, putting the Azek trim on the cupola, was exposed to the fall hazard of the bent first and seventh [first rung of the ladder extension] rungs of the 2-part extension ladder he was using because the ladder had not been inspected by a competent person for visible defects periodically and after any occurrence that could affect its safe use.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1760

1926.1053 B16

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 30, 2015
Abate by
Oct 27, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.1053(b)(16): Portable ladders with structural defects, such as, but not limited to, broken or missing rungs, cleats, or steps, broken or split rails, corroded components, or other faulty or defective components, were not either immediately marked in a manner that readily identifies them as defective, or tagged with "Do Not Use" or similar language, and were not withdrawn from service until repaired:    a)  Along the Northeast Side of the Building - On or about September 9, 2015, an employee, putting the Azek trim on the cupola, was exposed to a fall hazard of the bent first and seventh [first rung of the ladder extension] rungs of the 2-part extension ladder he was using because the ladder had not been marked, tagged, or otherwise withdrawn from service for such defects such as, but not limited to, broken or missing rungs, cleats, or steps, broken or split rails, corroded components, or other faulty or defective components.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.1060 A

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 30, 2015
Abate by
Oct 27, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.1060(a): The employer did not provide a training program for each employee using ladders and stairways, as necessary, which would enable each employee to recognize hazards related to ladders and stairways and train each employee in the procedures to be followed to minimize these hazards:    a)  Along the Northeast Side of the Building - On or about September 9, 2015, an employee, putting the Azek trim on the cupola, was exposed to a fall hazard of 16.5 feet because he was not trained to recognize the hazard of the bent first and seventh [first rung of the ladder extension] rungs of the 2-part extension ladder he was using, or trained to implement the procedures to be followed to minimize the hazards of ladders and stairways.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.503 B01

Other-than-serious 1 instance 1 exposed
Issued
Sep 30, 2015
Abate by
Oct 27, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.503(b)(1): The employer did not verify compliance with paragraph (a) of this section by preparing a written (training) certification record including the name or other identity of the employee trained, the date(s) of the training, and the signature of the person who conducted the training or the signature of the employer:    a)  Along the Northeast Side of the Building - On or about September 9, 2015, the employer did not prepare a written certification record of the fall protection training given to all employees working on the site.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (O) $0

View Smart Line Construction, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340915008.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.