TAMPA, FL —
OSHA Inspection: PELICAN BUILDING CONTRACTING, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PELICAN BUILDING CONTRACTING, INC. in 6925 GUNN HWY, TAMPA, FL 33625 (NAICS 238130). OSHA activity number 340953173.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PELICAN BUILDING CONTRACTING, INC.
- Site address
- 6925 GUNN HWY
- City
- TAMPA
- State
- FL
- ZIP
- 33625
- Mailing
- 9426 LAZY LANE, STE 105, TAMPA, FL 33614
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 8
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.451 B01
- Issued
- Oct 20, 2015
- Penalty
- Initial $1,600 · Current $960 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a. At the entrance of the building, employees were exposed to a 12 feet 7 inches fall hazard, in that, the working platforms were provided with only one plank, on about 09/30/2015.
Recent events (2)
- — I (S) $960
- — Z (S) $1600
1926.451 B07
- Issued
- Oct 20, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(b)(7): On scaffolds where platforms are overlapped to create a long platform, the overlap did not occur only over supports: a. At the entrance of the building, employees were exposed to a 12 feet 7 inches fall hazard, in that, a platform used to bridge two tubular welded frame scaffold towers was not placed on a scaffold support, on or about 09/30/2015.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 C02 II
- Issued
- Oct 20, 2015
- Penalty
- Initial $1,600 · Current $960 Reduced
General-duty citation text
29 CFR 1926.451(c)(2)(ii): Unstable objects were used to support scaffolds or platform units: a. At the entrance of the building employees were exposed to a 12 feet 7 inches fall hazard, in that, a tubular welded scaffold two frames high was used by employees to reach elevations at the exterior of the building with the feet of the scaffold resting on loose boards and a cement block, on or about 09/30/2015.
Recent events (2)
- — I (S) $960
- — Z (S) $1600
1926.451 C03
- Issued
- Oct 20, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(c)(3): Supported scaffold poles, legs, post, frames, and/or uprights were not plumb and braced to prevent swaying and displacement: a. At the entrance of the building employees were exposed to a 12 feet 7 inches fall hazard, in that, a tubular welded scaffold two frames high was used by employees to reach elevations at the exterior of the building with the feet of the scaffold resting on loose boards and a cement block causing the scaffold legs to lean, on or about 09/30/2015.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 G01
- Issued
- Oct 20, 2015
- Penalty
- Initial $1,600 · Current $960 Reduced
General-duty citation text
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section: a. At the entrance of the building, employees were exposed to a 12 feet 7 inches fall hazard, in that, a tubular welded frame scaffold two frames high and two frames wide with bridging between the two frames was not provided with railings on the working platforms, on or about 09/30/2015.
Recent events (2)
- — I (S) $960
- — Z (S) $1600
1926.452 C02
- Issued
- Oct 20, 2015
- Penalty
- Initial $1,600 · Current $960 Reduced
General-duty citation text
29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally: a. At the entrance of the building employees were exposed to a 12 feet 7 inches fall hazard, in that, a tubular welded scaffold two frames high was used by employees to reach elevations at the exterior of the building without cross bracing at the one side of the top frames, on or about 09/30/20115.
Recent events (2)
- — I (S) $960
- — Z (S) $1600
More inspections at Pelican Building Contracting, INC.
View Pelican Building Contracting, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238130)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340953173.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.