Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: JOSE PADILLA

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of JOSE PADILLA in GRANT STREET NE, WASHINGTON, DC 20026 (NAICS 238130). OSHA activity number 340984947.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Jose Padilla — free Get an email when a new federal OSHA severe-injury report for Jose Padilla is published. One employer, no account, unsubscribe in one click.
Establishment
JOSE PADILLA
Site address
GRANT STREET NE
City
WASHINGTON
State
DC
ZIP
20026
Mailing
10640 CAMPUS WAY SOUTH UNIT 147, UPPER MARLBORO, MD 20774
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
3
Ownership type
A

5 citations on file for this inspection.

1926.501 B06

Serious Gravity 10 1 instance 2 exposed
Issued
Nov 27, 2015
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.501(b)(6): Each employee on ramps, runways, and other walkways was not protected from falling 6 feet (1.8 m) or more to lower levels by guardrail systems:   a) On or about October 13, 2015; rear of building; employees were using a ramp to enter the building which was not properly guarded exposing employees to a 7 foot fall to the lower level.
Recent events (1)
  • — Z (S) $2800

1926.501 B13

Serious Gravity 10 6 instances 2 exposed
Issued
Nov 27, 2015
Abate by
Dec 16, 2015
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):   a) On or about October 13, 2015; roof area; an employee was in the process of framing an 8:12 pitch residential roof without fall protection in place to protect him from falling an estimated 35 feet to ground level.    b) On or about October 13, 2015; second floor; employees were exposed to a 10 foot fall while working near floor openings.    c) On or about October 13, 2015; second floor; employees were exposed to an estimated 20 foot fall to ground level while working near the wall opening.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $2800

1926.701 B

Serious Gravity 10 1 instance 2 exposed
Issued
Nov 27, 2015
Abate by
Dec 16, 2015
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.701(b): All protruding reinforcing steel, onto and/or into which employees could fall or come against, was not guarded to eliminate the hazard of impalement:  a) On or about October 13, 2015; rear of building at the entrance area; employees were exposed to a potential impalement hazard while accessing the residential home.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $2800

1926.1053 B01

Serious Gravity 10 1 instance 2 exposed
Issued
Nov 27, 2015
Abate by
Dec 16, 2015
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.1053(b)(1): Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed:  a) On or about October 13, 2015; first floor of building; the step ladder used to access the working platform was  placed 4 inches below the platform exposing the employees to a 10 foot fall while accessing the ladder or platform.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $2800

1926.1053 B04

Serious Gravity 10 2 instances 2 exposed
Issued
Nov 27, 2015
Abate by
Dec 16, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed:  a) On or about October 13, 2015; roof area; employees were using a step ladder in the closed position.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $0

View Jose Padilla's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340984947.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.