NORFOLK, VA —
OSHA Inspection: LEEBCOR SERVICES, LLC
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of LEEBCOR SERVICES, LLC in 1860 LEUTZE BUILDING SDA 207, NORFOLK, VA 23511 (NAICS 236220). OSHA activity number 340989755.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- LEEBCOR SERVICES, LLC
- Site address
- 1860 LEUTZE BUILDING SDA 207
- City
- NORFOLK
- State
- VA
- ZIP
- 23511
- Mailing
- 430 MCLAWS CIRCLE SUITE 201, WILLIAMSBURG, VA 23185
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 33
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.501 B10
- Issued
- Jan 25, 2016
- Abate by
- Feb 19, 2016
- Penalty
- Initial $4,900 · Current $3,185 Reduced
General-duty citation text
29 CFR 1926.501(b)(10): "Roofing work on Low-slope roofs." Except as otherwise provided in paragraph (b) of this section, each employee engaged in roofing activities on low-slope roofs, with unprotected sides and edges 6 feet (1.8 m) or more above lower levels shall be protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system. Or, on roofs 50-feet (15.25 m) or less in width (see Appendix A to subpart M of this part), the use of a safety monitoring system alone [i.e. without the warning line system] is permitted. a) Defense Logistics Agency building SDA-204: On or about 08/06/2015, a subcontractor employees working on a flat roof approximately 20 feet wide was not provided with fall protection while disconnected from the horizontal lifeline, as a result an employee fell 15 feet to the ground. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $3185
- — Z (S) $4900
1926.502 D08
- Issued
- Jan 25, 2016
- Abate by
- Feb 19, 2016
- Penalty
- Initial $4,900 · Current $3,185 Reduced
General-duty citation text
29 CFR 1926.502(d)(8): Horizontal lifelines were not designed, installed, and used under the supervision of a qualified person, as part of a complete personal fall arrest system, which maintained a safety factor of at least two: a) Defense Logistics Agency Building SDA-204: On or about 08/06/2015, the installation and use of the Guardian CB-12 Horizontal Lifeline system used by subcontractor employees was no supervised by a qualified person. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $3185
- — Z (S) $4900
1926.503 A02 II
- Issued
- Jan 25, 2016
- Abate by
- Feb 19, 2016
- Penalty
- Initial $4,900 · Current $3,185 Reduced
General-duty citation text
29 CFR 1926.503(a)(2)(ii): The employer did not assure that each employee, as necessary, had been trained by a competent person in the correct procedures for erecting, maintaining, disassembling and inspecting the fall protection systems to be used: a) Defense Logistics Agency Building SDA-204: On or about 08/06/2015, subcontractor employees were not trained by a Competent Person in the proper procedures of erecting and inspecting the CB-12 Guardian horizontal lifeline and fall restraint systems. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $3185
- — Z (S) $4900
More inspections at Leebcor Services, LLC
View Leebcor Services, LLC's full OSHA safety record →
More inspections in this industry (NAICS 236220)
More inspections in VA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340989755.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.