ELK GROVE VILLAGE, IL —
OSHA Inspection: ESTEBAN JIMENEZ DBA JIMENEZ MASONRY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ESTEBAN JIMENEZ DBA JIMENEZ MASONRY in 150 GAYLORD ST., ELK GROVE VILLAGE, IL 60007 (NAICS 238140). OSHA activity number 341004083.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ESTEBAN JIMENEZ DBA JIMENEZ MASONRY
- Site address
- 150 GAYLORD ST.
- City
- ELK GROVE VILLAGE
- State
- IL
- ZIP
- 60007
- Mailing
- 4314 S. HERMITAGE AVE. # 2R, ELK GROVE VILLAGE, IL 60007
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 15
- Ownership type
- A
Citations
5 citations on file for this inspection.
1903.19 C01
- Issued
- Feb 12, 2016
- Abate by
- Mar 17, 2016
- Penalty
- Initial $400 · Current $400
General-duty citation text
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: Esteban Jimenez dba Jimenez Masonry, failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected: Citation Number Item Number Abatement Date 01 01 12/28/2015 01 02 11/30/2015 01 03 11/30/2015 01 04 12/28/2015 In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (O) $400
1910.178 L01 I
- Issued
- Nov 23, 2015
- Abate by
- Dec 28, 2015
- Penalty
- Initial $2,000 · Current $2,000
General-duty citation text
29 CFR 1926.602(d): Note: The requirements applicable to construction work under paragraph (d) of this section are identical to those set forth at paragraph (l) of 29 CFR 1910.178: 29 CFR 1910.178(l)(1)(i): The employer did not ensure that each powered industrial truck operator was competent to operate a powered industrial truck safely, as demonstrated by the successful completion of the training and evaluation specified in this paragraph (l): a) The employer did not train and evaluate employees operating the Lull - 644 all-terrain forklift. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (S) $2000
1926.451 C02
- Issued
- Nov 23, 2015
- Abate by
- Nov 30, 2015
- Penalty
- Initial $2,000 · Current $2,000
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation: a) The scaffold that the employees were working from did not bear on base plates. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (S) $2000
1926.451 G01
- Issued
- Nov 23, 2015
- Abate by
- Nov 30, 2015
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level: a) Employees were exposed to the hazard of falling while performing masonry work from tubular welded frame scaffold platform elevated approximately 19.5 feet above the ground. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $2800
1926.454 A
- Issued
- Nov 23, 2015
- Abate by
- Dec 28, 2015
- Penalty
- Initial $2,000 · Current $2,000
General-duty citation text
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards: a) Employer did not provide training to each employee in order to recognize hazards associated with working from tubular welded frame scaffolding and to understand procedures to control or minimize those hazards. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (S) $2000
More inspections in this industry (NAICS 238140)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341004083.