DOUGLASTON, NY —
OSHA Inspection: HARMONY CONSTRUCTION CO.
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of HARMONY CONSTRUCTION CO. in 39-50 DOUGLASTON PARKWAY, DOUGLASTON, NY 11362 (NAICS 238190). OSHA activity number 341011211.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- HARMONY CONSTRUCTION CO.
- Site address
- 39-50 DOUGLASTON PARKWAY
- City
- DOUGLASTON
- State
- NY
- ZIP
- 11362
- Mailing
- 1298 BIRCH STREET, UNIONDALE, NY 11553
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238190
- Employees
- 3
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.403 B01
- Issued
- Nov 23, 2015
- Abate by
- Dec 4, 2015
- Penalty
- Initial $2,800 · Current $1,680 Reduced
General-duty citation text
29 CFR 1926.403(b)(1): Employer did not ensure that electrical equipment is free from recognized hazards that are likely to cause death or serious physical harm to employees: On or about October 22, 2015 Job Site 39-50 Douglaston Parkway, Douglaston NY 11362 Employer permitted employees to use flexible cord sets with damaged outer insulation. WRITTEN ABATEMENT DOCUMENTATION CERTIFICATION IS REQUIRED PURSUANT TO 29 CFR 1903.19.
Recent events (2)
- — I (S) $1680
- — Z (S) $2800
1926.404 B01 II
- Issued
- Nov 23, 2015
- Abate by
- Dec 4, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupers for personal protection: On or about October 22, 2015 Job Site 39-50 Douglaston Parkway, Douglaston NY 11362 Employer permitted employees to use chop saw with no Ground-fault Circuit Interrupter. WRITTEN ABATEMENT DOCUMENTATION CERTIFICATION IS REQUIRED PURSUANT TO 29 CFR 1903.19.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 B01
- Issued
- Nov 23, 2015
- Abate by
- Dec 4, 2015
- Penalty
- Initial $2,800 · Current $1,680 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights: On or about October 22, 2015 Job Site 39-50 Douglaston Parkway, Douglaston NY 11362 Employer allowed employees to be exposed to fall greater than 6 from the lower next level. WRITTEN ABATEMENT DOCUMENTATION CERTIFICATION IS REQUIRED PURSUANT TO 29 CFR 1903.19.
Recent events (2)
- — I (S) $1680
- — Z (S) $2800
1926.451 C02
- Issued
- Nov 23, 2015
- Abate by
- Dec 4, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation: On or about October 22, 2015 Job Site 39-50 Douglaston Parkway, Douglaston NY 11362 Employees working from tubular welded frame scaffolds, scaffold legs were missing mudsills for proper support. WRITTEN ABATEMENT DOCUMENTATION CERTIFICATION IS REQUIRED PURSUANT TO 29 CFR 1903.19.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 E01
- Issued
- Nov 23, 2015
- Abate by
- Dec 4, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access. On or about October 22, 2015 Job Site 39-50 Douglaston Parkway, Douglaston NY 11362 Employees working from tubular welded frame scaffold had no proper means of ladder access to climb down scaffold. WRITTEN ABATEMENT DOCUMENTATION CERTIFICATION IS REQUIRED PURSUANT TO 29 CFR 1903.19.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 G04 I
- Issued
- Nov 23, 2015
- Abate by
- Dec 4, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews: On or about October 22, 2015 Job Site 39-50 Douglaston Parkway, Douglaston NY 11362 Employees working from tubular welded frame scaffold with no guardrail system. WRITTEN ABATEMENT DOCUMENTATION CERTIFICATION IS REQUIRED PURSUANT TO 29 CFR 1903.19.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Harmony Construction CO.
View Harmony Construction CO.'s full OSHA safety record →
More inspections in this industry (NAICS 238190)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341011211.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.