CARTERSVILLE, GA —
OSHA Inspection: GEORGIA POWER COMPANY
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of GEORGIA POWER COMPANY in 317 COVERED BRIDGE RD. SW PLANT BOWEN, CARTERSVILLE, GA 30120 (NAICS 221112). OSHA activity number 341024156.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- GEORGIA POWER COMPANY
- Site address
- 317 COVERED BRIDGE RD. SW PLANT BOWEN
- City
- CARTERSVILLE
- State
- GA
- ZIP
- 30120
- Mailing
- 317 COVERED BRIDGE RD. SW PLANT BOWEN, CARTERSVILLE, GA 30120
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 221112
- Employees
- 2000
- Ownership type
- A
Citations
12 citations on file for this inspection.
1910.269 A03 III
- Issued
- Apr 26, 2016
- Abate by
- Jun 13, 2016
- Penalty
- Initial $7,000 · Current $12,000
General-duty citation text
29 CFR 1910.269(a)(3)(iii): The contract employer and the host employer did not coordinate their work rules and procedures so that each employee of the contract employer and the host employer is protected as required by this section. a. JBR 3/4 Building - The Georgia Power Company and ABB, Inc. Company did not coordinate their work rules and procedures so that both Georgia Power Company and ABB, Inc. personnel were protected from shock and arc blast/flash hazards while performing circuit buss modification in Frame Cabinets 1, 1A and 7.
Recent events (3)
- — F (S) $12000
- — C (S) $7000
- — Z (S) $7000
1910.269 D08 IV
- Issued
- Apr 26, 2016
- Abate by
- Jun 13, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.269(d)(8)(iv): Whenever outside servicing personnel are to be engaged in activities covered by paragraph (d) of this section, the on-site employer and the outside employer shall inform each other of their respective lockout or tagout procedures, and each employer shall ensure that his or her personnel understand and comply with restrictions and prohibitions of the energy control procedures being used. a. Plant Bowen, JBR 3/4 Building - Prior to performing electrical circuit modification work using Georgia Power Company clearance procedures, Georgia Power Company and ABB, Inc. did not inform each others employee representatives of their respective lockout or tagout program, procedures and policies to ensure each employee understood and complied with the restrictions and prohibitions of the energy control procedures being used.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.269 D02 III
- Issued
- Apr 26, 2016
- Abate by
- Jun 13, 2016
- Penalty
- Initial $7,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.269(d)(2)(iii): Procedures shall be developed, documented, and used for the control of potentially hazardous energy covered by paragraph (d) of this section. a. Plant Bowen, JBR 3/4 Building, Buss B - The Georgia Power clearance procedure used to isolate Frames 1 and 1A did not isolate all sources of power thereby exposing employees and subcontractors to the hazard of arc flash/blast and shock.
Recent events (3)
- — F (S) $0
- — C (S) $7000
- — Z (S) $7000
1910.269 D02 IV D
- Issued
- Apr 26, 2016
- Abate by
- Jun 13, 2016
- Penalty
- Initial $0 · Current $12,000
General-duty citation text
29 CFR 1910.269(d)(2)(iv)(D): Specific requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures. a. Plant Bowen, JBR 3/4 Building, Buss B - The tagout procedure used to isolate Frames 1 and 1A and render the equipment safe, did not include specific techniques and methods necessary for checking and verifying the absence of voltage on the equipment and for the hanging of temporary protective grounding cables.
Recent events (3)
- — F (S) $12000
- — C (S) $0
- — Z (S) $0
1910.269 D06 VII
- Issued
- Apr 26, 2016
- Abate by
- Jun 13, 2016
- Penalty
- Initial $38,500 · Current $0 Reduced
General-duty citation text
29 CFR 1910.269(d)(6)(vii): Before starting work on machines or equipment that have been locked out or tagged out, the authorized employee shall verify that isolation and deenergizing of the machine or equipment have been accomplished. If normally energized parts will be exposed to contact by an employee while the machine or equipment is deenergized, a test shall be performed to ensure that these parts are deenergized. a. Plant Bowen, JBR 3/4 Building, Buss B - Prior to starting work the Georgia Power authorized employee(s) did not verify the absence of voltage, using a test instrument, on the equipment or circuits located in the switchgear cabinet for Bus B. Georgia Power Company was previously cited for a violation of this Occupational Safety and Health Standard 29 CFR 1910.268(d)(6)(vii), which was contained in OSHA Inspection Number 900009, Citation Number 1, Item Number 14b and was affirmed as a final order on December 5, 2014, with respect to a workplace located at Plant Bowen, 317 Covered Bridge Rd SW, Cartersville GA 30120.
Recent events (3)
- — F (S) $0
- — C (R) $38500
- — Z (R) $38500
1910.269 D02 II B 2
- Issued
- Apr 26, 2016
- Abate by
- Jun 13, 2016
- Penalty
- Initial $7,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.269(d)(2)(ii)(B)(2): In demonstrating that a level of safety is achieved in the tagout program equivalent to the level of safety obtained by the use of a lockout program, the employer shall demonstrate full compliance with all tagout-related provisions of this standard together with such additional elements as are necessary to provide the equivalent safety available from the use of a lockout device. Additional means to be considered as part of the demonstration of full employee protection shall include the implementation of additional safety measures such as the removal of an isolating circuit element, blocking of a controlling switch, opening of an extra disconnecting device, or the removal of a valve handle to reduce the likelihood of inadvertent energizing. a. Plant Bowen, JBR 3/4 Building - The Georgia Power Company does not have a tagout program which demonstrated a level of safety equivalent to that of a lockout program in that the written clearance procedure did not contain additional steps necessary for demonstrating equivalency such as the additional safety measure of removing an additional isolating circuit element or the opening of an additional disconnecting device.
Recent events (3)
- — F (S) $0
- — C (S) $7000
- — Z (S) $7000
1910.269 D08 II
- Issued
- Apr 26, 2016
- Abate by
- Jun 13, 2016
- Penalty
- Initial $7,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.269(d)(8)(ii): When servicing or maintenance is performed by a crew, craft, department, or other group, they shall use a procedure which affords the employees a level of protection equivalent to that provided by the implementation of a personal lockout or tagout device. Group lockout or tagout devices shall be used in accordance with the procedures required by paragraphs (d)(2)(iii) and (d)(2)(iv) of this section including, but not limited to, the following specific requirements: a. Plant Bowen, JBR 3/4 Building - The contractors crew members who worked on the buss bar and in the switchgear did not have a procedure which afforded each exposed employee with a level of protection from shock and arc flash/blast hazards equivalent to that of a personal lock.
Recent events (3)
- — F (S) $0
- — C (S) $7000
- — Z (S) $7000
1910.269 D08 II B
- Issued
- Apr 26, 2016
- Abate by
- Jun 13, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.269(d)(8)(ii)(B): Provision shall be made for the authorized employee to ascertain the exposure status of all individual group members with regard to the lockout or tagout of the machine or equipment; a. Plant Bowen, JBR 3/4 Building - The controlling employers tagout (clearance) procedure did not provide a provision to ensure that the contract primary authorized employee was provided an opportunity to review and inspect all energy isolating point, in that the contract authorized employee was not allowed to view and verify low voltage energy source isolation points.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.269 N06 I
- Issued
- Apr 26, 2016
- Abate by
- Jun 13, 2016
- Penalty
- Initial $7,000 · Current $12,000
General-duty citation text
29 CFR 1910.269(n)(6)(i): The employer shall ensure that, when an employee attaches a ground to a line or to equipment, the employee attaches the ground-end connection first and then attaches the other end by means of a live-line tool. For lines or equipment operating at 600 volts or less, the employer may permit the employee to use insulating equipment other than a live-line tool if the employer ensures that the line or equipment is not energized at the time the ground is connected or if the employer can demonstrate that each employee is protected from hazards that may develop if the line or equipment is energized. a. Plant Bowen, JBR 3/4 Building - The employer did not ensure that when an employee attached a personal protective grounding cable to previously energized equipment, such as the buss bar and switchgear, a live-line tool or equivalent PPE was used in lieu of installation by hand.
Recent events (3)
- — F (S) $12000
- — C (S) $7000
- — Z (S) $7000
1910.269 D02 IV B
- Issued
- Apr 26, 2016
- Abate by
- Jun 13, 2016
- Penalty
- Initial $38,500 · Current $0 Reduced
General-duty citation text
29 CFR 1910.269(d)(2)(iv)(B): Specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy; a. Plant Bowen, JBR 3/4 Building, Bus B - The employer did not develop and issue a specific clearance (tagout procedure) which included specific procedural steps necessary for the hanging of temporary protective grounds in Frame #7 Georgia Power Company was previously cited for a violation of this Occupational Safety and Health Standard 29 CFR 1910.268(d)(2)(iv)(B), which was contained in OSHA Inspection Number 900009, Citation Number 1, Item Number 6b and was affirmed as a final order on December 5, 2014, with respect to a workplace located at Plant Bowen, 317 Covered Bridge Rd SW, Cartersville GA 30120.
Recent events (3)
- — F (R) $0
- — C (R) $38500
- — Z (R) $38500
1910.269 D02 II C
- Issued
- Apr 26, 2016
- Abate by
- Jun 13, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.269(d)(2)(ii)(C): After November 1, 1994, whenever replacement or major repair, renovation, or modification of a machine or equipment is performed, and whenever new machines or equipment are installed, energy isolating devices for such machines or equipment shall be designed to accept a lockout device. a. Plant Bowen, JBR 3/4 Building Bus B - The employer used tagout to identify energy source isolation at the point where a lockout device should have been used to control potentially hazardous energy points on electrical equipment manufactured and installed in 2005-2006 that was not capable of being locked out.
Recent events (3)
- — F (O) $0
- — C (O) $0
- — Z (O) $0
1910.269 D08 III
- Issued
- Apr 26, 2016
- Abate by
- Jun 13, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.269(d)(8)(iii): Procedures shall be used during shift or personnel changes to ensure the continuity of lockout or tagout protection, including provision for the orderly transfer of lockout or tagout device protection between off-going and on-coming employees, to minimize their exposure to hazards from the unexpected energizing or start-up of the machine or equipment or from the release of stored energy. a. Plant Bowen, JBR 3/4 Building - The company did not utilize a personnel change procedure to remove Mike Moore from controlling the department tagout/clearance for the procedure numbered and titled 4-09-10-20-02, 4160V Limestone Bus D Alternate Feeder 648444 after he left the company in May 2014.
Recent events (3)
- — F (O) $0
- — C (O) $0
- — Z (O) $0
More inspections at Georgia Power Company
View Georgia Power Company's full OSHA safety record →
More inspections in this industry (NAICS 221112)
More inspections in GA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341024156.