OSHA Inspection: ERIC ROCES DBA EXTERIOR RENOVATIONS OF CHICAGO INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ERIC ROCES DBA EXTERIOR RENOVATIONS OF CHICAGO INC. in 3016 W. SUNNYSIDE AVE., CHICAGO, IL 60625 (NAICS 238140). OSHA activity number 341071025.

Watch Eric Roces DBA Exterior Renovations OF Chicago INC. — free Get an email when a new federal OSHA severe-injury report for Eric Roces DBA Exterior Renovations OF Chicago INC. is published. One employer, no account, unsubscribe in one click.
Site address
3016 W. SUNNYSIDE AVE.
City
CHICAGO
State
IL
ZIP
60625
Mailing
7651 ROBERTS RD., BRIDGEVIEW, IL 60455
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
8
Ownership type
A

4 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Feb 12, 2016
Abate by
Mar 17, 2016
Penalty
Initial $400 · Current $400
29 CFR 1903.19(c)(1):  The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:     Eric Roces dba Exteriors Renovations of Chicago Inc., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:     Citation Number                       Item Number                            Abatement Date  01                                            01                                            12/11/2015  01                                            02                                            12/11/2015  01                                            03                                            12/11/2015       In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $400

1926.451 C01 II

Serious Gravity 5 1 instance 2 exposed
Issued
Dec 7, 2015
Abate by
Dec 11, 2015
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(c)(1)(ii): Guys, ties, and/or braces were not installed  according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and repeated vertically at locations of horizontal members every 20 feet (56.1 m) or less thereafter for scaffolds 3 feet ((0.91 m) wide or less, and every 26 feet (7.9 m) or less thereafter for scaffolds greater than 3 feet (0.91m) wide:     a)  Employees were working from a tubular welded frame scaffold that was seven frames high and was not tied to the building.   In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $2000

1926.451 E01

Serious Gravity 5 1 instance 2 exposed
Issued
Dec 7, 2015
Abate by
Dec 11, 2015
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(e)(1): Safe access was not provided to scaffold platforms when the platforms were more than 2 feet above or below the point of access:    a) Employees accessed tubular welded frame scaffold platform approximately 30 feet above the ground by climbing the ends of the scaffold frames that were not designed for such use.  In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $2000

1926.451 G01

Serious Gravity 10 1 instance 2 exposed
Issued
Dec 7, 2015
Abate by
Dec 11, 2015
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level:   a)  Employees were exposed to the hazard of falling while performing masonry work from tubular welded frame scaffold platform elevated approximately 30 feet above the ground.     In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $2800

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341071025.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.