On , OSHA opened a complaint safety inspection of EDDIE KANE STEEL in 7799 LOCUST ST, MASURY, OH 44438 (NAICS 423510). OSHA activity number 341147106.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- EDDIE KANE STEEL
- Site address
- 7799 LOCUST ST
- City
- MASURY
- State
- OH
- ZIP
- 44438
- Mailing
- PO BOX 133, SPRING LAKE, NJ 07762
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 423510
- Employees
- 140
- Ownership type
- A
Citations
7 citations on file for this inspection.
1910.23 C01
- Issued
- Apr 6, 2016
- Abate by
- May 2, 2016
- Penalty
- Initial $6,300 · Current $4,500 Reduced
General-duty citation text
29 CFR 1910.23(c)(1): Open-sided floors and/or platforms four feet or more above adjacent floor or ground level were not guarded with standard railings (or equivalent) and toe boards (Toe boards are only required when persons can pass, there is moving equipment or there is equipment with which falling materials could create a hazard): On or about December 30, 2015, the employer failed to provide standard railings and toe boards for the ground level working area that Is located in the main working area, next to the employee break room, to protect employees, equipment and materials from falling down to the adjacent ground level of the paint pit which is a distance of approximately 14 feet down. Directly at that base of the paint pit are metal materials and beams.
Recent events (3)
- — F (S) $4500
- — C (S) $6300
- — Z (S) $6300
1910.24 H
- Issued
- Apr 6, 2016
- Abate by
- May 2, 2016
- Penalty
- Initial $4,500 · Current $0 Reduced
General-duty citation text
29 CFR 1910.24(h): Standard railings were not provided on the open sides of all exposed stairways and stair platforms: On or about December 30, 2015, the employer failed to provide effective handrails on the open side of the stairway leading down from the primary work level to the paint bay below. These stairs are also right next to the employee break room and are used by multiple employees daily.
Recent events (3)
- — F (S) $0
- — C (S) $4500
- — Z (S) $4500
1910.37 B06
- Issued
- Apr 6, 2016
- Abate by
- May 11, 2016
- Penalty
- Initial $2,700 · Current $0 Reduced
General-duty citation text
29 CFR 1910.37(b): Lighting and marking for an exit was not adequate or appropriate. On or about December 30, 2015, the employer failed to ensure the emergency exit had lighting so as to aid in the even of an emergency evacuation. The exit door located in the middle of the main facility, past the welding operation area behind support beam #223.
Recent events (3)
- — F (O) $0
- — C (S) $2700
- — Z (S) $2700
1910.134 C01
- Issued
- Apr 6, 2016
- Abate by
- May 11, 2016
- Penalty
- Initial $3,600 · Current $0 Reduced
General-duty citation text
29 CFR 1910.134(c)(1): A written respiratory protection program that included the provisions in 29 CFR 1910.134(c)(1)(i) - (ix) with worksite specific procedures was not established and implemented for required respirator use: On or about December 30, 2015, the employer failed to develop and implement a Respiratory Protection Program for protection of employees who are working with chemicals such as but not limited to: Welding Wire, Black Primer and Xylene. Employees are wearing half mask respirators with Organic Vapor Cartridges (NIOSH 100100) without being medically evaluated or fit tested.
Recent events (3)
- — F (O) $0
- — C (S) $3600
- — Z (S) $3600
1910.134 C02 I
- Issued
- Apr 6, 2016
- Abate by
- Apr 26, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.134(c)(2)(i): Respirator users were not provided with the information contained in Appendix D to 29 CFR 1910.134 when the employer determined that any voluntary respirator use was permissible: On or about December 30, 2015, the employer failed to provide employees with Appendix D where N95 or similar respirators are being provided to employees for voluntary usage throughout the facility. Employee work with or near chemicals in the workplace to include but not limited to: Welding Wire, Black Primer, Xylene and Purple Degreaser.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.242 A
- Issued
- Apr 6, 2016
- Abate by
- Apr 26, 2016
- Penalty
- Initial $4,500 · Current $4,500
General-duty citation text
29 CFR 1910.243(c)(1): Abrasive wheel(s) were used on portable grinder(s) which were not provided with safety guard(s) meeting the requirements specified in 29 CFR 1910.243(c)(1) through (c)(4)(a): On or about December 30, 2015, the employer did not ensure effective that employees maintained in a safe condition tools that were being used to cut off end pieces of material being welded in the welding bay area.
Recent events (3)
- — F (S) $4500
- — C (S) $4500
- — Z (S) $4500
1910.303 G02 I
- Issued
- Apr 6, 2016
- Abate by
- May 2, 2016
- Penalty
- Initial $6,300 · Current $0 Reduced
General-duty citation text
29 CFR 1910.303(g)(2)(i): Except as elsewhere required or permitted by Subpart S of Part 1910, live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by use of approved cabinets or other forms of approved enclosures or by any of the means identified in paragraphs (A), (B), (C), and (D) of 29 CFR 1910.303(g)(2)(i): On or about December 30, 2015, the employer failed to ensure the electrical box at the arc welding station, which was located across the way from support beam #226, was closed. The 240 volt electrical box has an arc welding assembly hard wired into the box, which did not allow for the box to be closed. There are broken windows up above the support beam which has the electrical panel box on it and when it rains hard, water leaks down and into the box.
Recent events (3)
- — F (O) $0
- — C (S) $6300
- — Z (S) $6300
More inspections at Eddie Kane Steel
View Eddie Kane Steel's full OSHA safety record →
More inspections in this industry (NAICS 423510)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341147106.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.