OSHA Inspection: R & R GENERAL CONTRACTORS, INC.
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of R & R GENERAL CONTRACTORS, INC. in 4666 E FARIES PKWY, DECATUR, IL 62526 (NAICS 238290). OSHA activity number 341160570.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- R & R GENERAL CONTRACTORS, INC.
- Site address
- 4666 E FARIES PKWY
- City
- DECATUR
- State
- IL
- ZIP
- 62526
- Mailing
- 505 N. STATE HWY 121, MOUNT ZION, IL 62549
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238290
- Employees
- 175
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.146 D03 IV
- Issued
- Feb 10, 2016
- Abate by
- Feb 17, 2016
- Penalty
- Initial $7,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.146(d)(3)(iv): Under the permit space program, the employer did not develop and implement the means, procedures, and practices necessary for safe permit entry operations, including, but not limited to, purging, interting, flushing or ventilation the permit spaces as necessary to eleminate or control atmospheric hazards. On or about December 31, 2015, employees making a permit required confined space entry into the #5 Sorbitol Reactor at the ADM Corn Plant were exposed to an oxygen-deficient atmosphere containing nitrogen and the employer did not implement the means and practices necessary to ventilate the permit space as necessary to eliminate or control the atmospheric hazard.
Recent events (2)
- — I (S) $3500
- — Z (S) $7000
1910.146 D03 VI
- Issued
- Feb 10, 2016
- Abate by
- Feb 17, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.146(d)(3)(vi): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not develop and implement the means, procedures, and practices to verify that conditions in a permit space were acceptable for entry throughout the duration of an authorized entry: On or about December 31, 2015, employees making a permit required confined space entry into the #5 Sorbitol Reactor at the ADM Corn Plant were exposed to an oxygen-deficient atmosphere containing nitrogen and the employer did not implement the means and practices necessary to ensure the permit space conditions in the space were acceptable for entry throughout the duration of the authorized entry.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.146 D05 I
- Issued
- Feb 10, 2016
- Abate by
- Feb 17, 2016
- Penalty
- Initial $7,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.146(d)(5)(i): The employer did not test conditions in the permit space to determine if acceptable entry conditions existed before entry was authorized: On or about December 31, 2015, employees making a permit required confined space entry into the #5 Sorbitol Reactor at the ADM Corn Plant were exposed to an oxygen-deficient atmosphere containing nitrogen and the employer did not adequately test conditions in the permit space including, but not limited to, testing the air in the space at working height, before entry to determine if acceptable entry conditions existed before entry was authorized.
Recent events (2)
- — I (S) $3500
- — Z (S) $7000
1910.146 D05 II
- Issued
- Feb 10, 2016
- Abate by
- Feb 17, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.146(d)(5)(ii): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not evaluate permit space conditions when entry operations were conducted by testing or monitoring the permit space as necessary to determine if acceptable entry conditions were being maintained during the course of entry operations: On or about December 31, 2015, employees making a permit required confined space entry into the #5 Sorbitol Reactor at the ADM Corn Plant were exposed to an oxygen-deficient atmosphere containing nitrogen and the employer did not adequately test conditions in the permit space including, but not limited to, testing the air in the space at working height, during entry operations to ensure that acceptable entry conditions existed during the course of all entry into the space.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at R & R General Contractors, INC.
View R & R General Contractors, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238290)
More inspections in IL