Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,195,903Inspections Most recent open 2026-08-18 Last loaded 2026-08-21

OSHA Inspection: BALDMERO DOMINGUEZ

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of BALDMERO DOMINGUEZ in 31-53 EAST 8TH AVENUE, COLUMBUS, OH 43201 (NAICS 238170). OSHA activity number 341211225.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Baldmero Dominguez for free Get an email when a new federal OSHA severe-injury report for Baldmero Dominguez is published. One employer, no account, unsubscribe in one click.
Establishment
BALDMERO DOMINGUEZ
Site address
31-53 EAST 8TH AVENUE
City
COLUMBUS
State
OH
ZIP
43201
Mailing
4555 MISSION DRIVE, INDIANAPOLIS, IN 46254
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238170
Employees
6
Ownership type
Private (A)

6 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Apr 12, 2016
Abate by
May 15, 2016
Penalty
Initial $400 · Current $400
29 CFR 1903.19(c)(1): Within ten calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section.   a. In regards to citation 1, item 1, issued on February 10, 2016, the employer has failed to submit abatement certification within ten days of the abatement date, February 23, 2016.  The violation read as follows:       29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation:  a. At the worksite where an employee was installing siding on a three story building from a pump jack scaffold, the poles of the scaffold were placed directly on the ground, thereby exposing the employee to a fall hazard.     b. In regards to citation 1, item 3, issued on February 10, 2016, the employer has failed to submit abatement certification within ten days of the abatement date, February 23, 2016.  The violation read as follows:       29 CFR 1926.451(h)(1): In addition to wearing hardhats each employee on a scaffold shall be provided with additional protection from falling hand tools, debris, and other small objects through the installation of toeboards, screens, or guardrail systems, or through the erection of debris nets, catch platforms, or canopy structures that contain or deflect the falling objects. When the falling objects are too large, heavy or massive to be contained or deflected by any of the above-listed measures, the employer shall place such potential falling objects away from the edge of the surface from which they could fall and shall secure those materials as necessary to prevent their falling:  a. At the worksite where an employee was installing siding on a three story building from a pump jack scaffold, a net was not installed to prevent falling hand tools, debris, and other small objects from striking the employees working below, thereby exposing employees to a struck-by hazard.
Recent events (1)
  • · Z (O) $400

1903.19 D01

Other-than-serious 1 instance 1 exposed
Issued
Apr 12, 2016
Abate by
May 15, 2016
Penalty
Initial $0 · Current $0
29 CFR 1903.19(d)(1): The employer must submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required.   a. In regards to citation 1, item 2, issued on February 10, 2016, the employer has failed to submit abatement certification and documentation within ten days of the abatement date, February 23, 2016.  The violation read as follows:       29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews:  a.  At the worksite where an employee was installing siding on a three story building from a pump jack scaffold, guardrails were not installed along the open side and ends, thereby exposing the employee to a fall hazard.     b. In regards to citation 1, item 4, issued on February 10, 2016, the employer has failed to submit abatement certification and documentation within ten days of the abatement date, February 23, 2016.  The violation read as follows:      29 CFR 1926.452(j)(2): Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately four feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled:  a. At the worksite where an employee was installing siding on a three story building from a pump jack scaffold, the scaffold was only braced at the top, thereby exposing the employee to a fall hazard.
Recent events (1)
  • · Z (O) $0

1926.451 C02

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 10, 2016
Abate by
Feb 23, 2016
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation.   a. At the worksite where an employee was installing siding on a three story building from a pump jack scaffold, the poles of the scaffold were placed directly on the ground, thereby exposing the employee to a fall hazard.
Recent events (1)
  • · Z (S) $2000

1926.451 G04 I

Serious Gravity 10 1 instance 1 exposed
Issued
Feb 10, 2016
Abate by
Feb 23, 2016
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews.   a. At the worksite where an employee was installing siding on a three story building from a pump jack scaffold, guardrails were not installed along the open side and ends, thereby exposing the employee to a fall hazard.
Recent events (1)
  • · Z (S) $2800

1926.451 H01

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 10, 2016
Abate by
Feb 23, 2016
Penalty
Initial $1,600 · Current $1,600
29 CFR 1926.451(h)(1): In addition to wearing hardhats each employee on a scaffold shall be provided with additional protection from falling hand tools, debris, and other small objects through the installation of toeboards, screens, or guardrail systems, or through the erection of debris nets, catch platforms, or canopy structures that contain or deflect the falling objects. When the falling objects are too large, heavy or massive to be contained or deflected by any of the above-listed measures, the employer shall place such potential falling objects away from the edge of the surface from which they could fall and shall secure those materials as necessary to prevent their falling.  a. At the worksite where an employee was installing siding on a three story building from a pump jack scaffold, a net was not installed to prevent falling hand tools, debris, and other small objects from striking the employees working below, thereby exposing employees to a struck-by hazard.
Recent events (1)
  • · Z (S) $1600

1926.452 J02

Serious Gravity 10 1 instance 1 exposed
Issued
Feb 10, 2016
Abate by
Feb 23, 2016
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.452(j)(2): Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled.  a. At the worksite where an employee was installing siding on a three story building from a pump jack scaffold, the scaffold was only braced at the top, thereby exposing the employee to a fall hazard.
Recent events (1)
  • · Z (S) $2800

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 341211225.