On , OSHA opened a planned safety inspection of EROC CONSTRUCTION INC in 78 BOWERY ST, NEW YORK, NY 10002 (NAICS 236220). OSHA activity number 341224954.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Eroc Construction INC — free Get an email when a new federal OSHA severe-injury report for Eroc Construction INC is published. One employer, no account, unsubscribe in one click.
Site address
78 BOWERY ST
City
NEW YORK
State
NY
ZIP
10002
Mailing
140-14 CHERRY AVE. STE. 3B, FLUSHING, NY 11355
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
4
Ownership type
A

6 citations on file for this inspection.

1926.25 A

Serious Gravity 1 1 instance 1 exposed
Issued
Mar 31, 2016
Penalty
Initial $1,200 · Current $855 Reduced
29 CFR 1926.25(a): During the course of construction, alteration, or repairs, form or scrap lumber with protruding nails was not kept clear from work areas.   a) 78 Bowery St, Manhattan NY, On or about 1/28/16: Scrap lumber found on the floor in employees workspace contained protruding nails that were not properly kept clear of the work area.
Recent events (2)
  • — I (S) $855
  • — Z (S) $1200

1926.403 B01 I

Serious Gravity 5 1 instance 1 exposed
Issued
Mar 31, 2016
Abate by
Apr 6, 2016
Penalty
Initial $1,600 · Current $1,140 Reduced
29 CFR 1926.403(b)(1)(i): Safety of equipment was not determined on the basis of suitability of the equipment for an identified purpose as evidenced by listing, labeling, or certification for that identified purpose.  a) 78 Bowery St, Manhattan, NY, 1st floor, On or about 1/28/16: A 4 gang plug receptacle box, that was meant for permanent installation was not permanently affixed to the structure and was used as an extension cord.
Recent events (2)
  • — I (S) $1140
  • — Z (S) $1600

1926.403 E

Serious Gravity 5 1 instance 1 exposed
Issued
Mar 31, 2016
Abate by
Apr 10, 2016
Penalty
Initial $1,600 · Current $1,140 Reduced
29 CFR 1926.403(e): All splices and joints and free ends of conductors were not covered with insulation equivalent to that of the conductors or with an insulating device designed for the purpose.   a) 78 Bowery St, Manhattan, NY,  2nd floor, On or about 1/28/16: A yellow temporary light power cord contained a splice  that did not contain the insulating properties of the original portion of the cord.
Recent events (2)
  • — I (S) $1140
  • — Z (S) $1600

1926.405 A02 II E

Serious Gravity 5 1 instance 1 exposed
Issued
Mar 31, 2016
Abate by
Apr 10, 2016
Penalty
Initial $1,600 · Current $1,005 Reduced
29 CFR 1926.405(a)(2)(ii)(E): Lamps used in temporary wiring for general illumination were not protected from accidental contact or breakage.    a) 78 Bowery St, Manhattan, NY, 1st floor. On or 1/28/16: Temporary lighting fixture,  used in the employee workspace, was not protected to prevent damage to the fixture.
Recent events (2)
  • — I (S) $1005
  • — Z (S) $1600

1926.451 C03

Serious Gravity 5 1 instance 1 exposed
Issued
Mar 31, 2016
Penalty
Initial $2,000 · Current $1,425 Reduced
29 CFR 1926.451(c)(3): Supported scaffold poles, legs, post, frames, and/or uprights were not plumb and braced to prevent swaying and displacement.  a) 78 Bowery St, Manhattan, NY , 2nd floor. On or about 1/28/16: A crossbrace was not installed on the scaffolding on the exterior portion of the frame on the second tier.
Recent events (2)
  • — I (S) $1425
  • — Z (S) $2000

1926.501 B01

Serious Gravity 10 1 instance 1 exposed
Issued
Mar 31, 2016
Abate by
Apr 10, 2016
Penalty
Initial $2,800 · Current $1,995 Reduced
29 CFR 1926.1052(c)(12): Unprotected sides and edges of stairway landings were not provided with guardrail systems that meet the criteria contained in Subpart M of 29 CFR 1926.   a) 78 Bowery St. Manhattan, NY, Rooftop/Penthouse Stairway. On or about 1/28/16:   Railing installed at the top  of the stairs was missing a top rail.
Recent events (2)
  • — I (S) $1995
  • — Z (S) $2800

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341224954.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.